Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling

Author

Listed:
  • Borna Dasović

    (Faculty of Civil Engineering, Transportation Engineering and Architecture, University of Maribor, Smetanova ulica 17, 2000 Maribor, Slovenia)

  • Uroš Klanšek

    (Faculty of Civil Engineering, Transportation Engineering and Architecture, University of Maribor, Smetanova ulica 17, 2000 Maribor, Slovenia)

Abstract

This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PMT was created. To ensure data compatibility between the optimization system and PMT and to automate the process of obtaining a cost-optimal schedule, a data transformation tool (DTT) was developed within a spreadsheet application. The suggested system can determine: (i) an optimal project schedule with associated network diagram and Gantt chart in continuous or discrete time units; (ii) optimal critical and non-critical activities, including their early start, late start, early finish, late finish along with total and free slack times; and (iii) minimum total project cost along with the allocation of direct and indirect costs. The system provides functionalities such as: (i) MINLP can be updated, and schedules can be re-optimized; (ii) the optimal schedule can be saved as a baseline to track changes; (iii) different optimization algorithms can be engaged whereby switching between them does not require model changes; (iv) PMT can be used to track task completion in the optimized schedule; (v) calendar settings can be changed; and (vi) visual reports can be generated to support efficient project management. Results of cost-optimal project scheduling are given in a conventional PMT environment, which raises the possibility that the proposed system will be more widely used in practice. Integration of MINLP and PMT allows each software to be used for what it was initially designed. Their combination leads to additional information and features of optimized construction schedules that would be significantly more difficult to achieve if used separately. Application examples are given in the paper to show the advantages of the proposed approach.

Suggested Citation

  • Borna Dasović & Uroš Klanšek, 2021. "Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling," Sustainability, MDPI, vol. 13(21), pages 1-20, November.
  • Handle: RePEc:gam:jsusta:v:13:y:2021:i:21:p:12173-:d:672038
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/13/21/12173/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/13/21/12173/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Peter Mésároš & Marcela Spišáková & Tomáš Mandičák & Jozef Čabala & Milan M. Oravec, 2021. "Adaptive Design of Formworks for Building Renovation Considering the Sustainability of Construction in BIM Environment—Case Study," Sustainability, MDPI, vol. 13(2), pages 1-20, January.
    2. Konstantinos Anagnostopoulos & Georgios Koulinas, 2010. "A simulated annealing hyperheuristic for construction resource levelling," Construction Management and Economics, Taylor & Francis Journals, vol. 28(2), pages 163-175.
    3. Borna Dasović & Mario Galić & Uroš Klanšek, 2020. "A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling," Sustainability, MDPI, vol. 12(8), pages 1-18, April.
    4. Nashwan Dawood & Eknarin Sriprasert, 2006. "Construction scheduling using multi-constraint and genetic algorithms approach," Construction Management and Economics, Taylor & Francis Journals, vol. 24(1), pages 19-30.
    5. LeBlanc, Larry J. & Grossman, Thomas A. & Bartolacci, Michael R., 2019. "Ensuring scalability and reusability of spreadsheet linear programming models," Omega, Elsevier, vol. 84(C), pages 55-69.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Frantisek Kuda & Petr Dlask & Marek Teichmann & Vaclav Beran, 2022. "Time–Cost Schedules and Project–Threats Indication," Sustainability, MDPI, vol. 14(5), pages 1-16, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Borna Dasović & Uroš Klanšek, 2022. "A Review of Energy-Efficient and Sustainable Construction Scheduling Supported with Optimization Tools," Energies, MDPI, vol. 15(7), pages 1-17, March.
    2. Borna Dasović & Mario Galić & Uroš Klanšek, 2020. "A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling," Sustainability, MDPI, vol. 12(8), pages 1-18, April.
    3. Chia-Nan Wang & Nhat-Luong Nhieu & Trang Thi Thu Tran, 2021. "Stochastic Chebyshev Goal Programming Mixed Integer Linear Model for Sustainable Global Production Planning," Mathematics, MDPI, vol. 9(5), pages 1-22, February.
    4. Kyunghwan Kim, 2020. "Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling," Sustainability, MDPI, vol. 12(21), pages 1-19, October.
    5. Michał Tomczak & Piotr Jaśkowski, 2021. "Preferences of Construction Managers Regarding the Quality and Optimization Criteria of Project Schedules," Sustainability, MDPI, vol. 13(2), pages 1-22, January.
    6. Wei He & Wenjing Li & Wei Wang, 2021. "Developing a Resource Allocation Approach for Resource-Constrained Construction Operation under Multi-Objective Operation," Sustainability, MDPI, vol. 13(13), pages 1-22, June.
    7. Lung-Yu Li & Jian-You Xu & Shuenn-Ren Cheng & Xingong Zhang & Win-Chin Lin & Jia-Cheng Lin & Zong-Lin Wu & Chin-Chia Wu, 2022. "A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment," Mathematics, MDPI, vol. 10(21), pages 1-22, November.
    8. Fernando Acebes & David Poza & Jose M Gonzalez-Varona & Javier Pajares & Adolfo Lopez-Paredes, 2024. "On the project risk baseline: integrating aleatory uncertainty into project scheduling," Papers 2406.00077, arXiv.org.
    9. Orlando Lima & Gabriela Fernandes & Anabela Tereso, 2023. "Benefits of Adopting Innovation and Sustainability Practices in Project Management within the SME Context," Sustainability, MDPI, vol. 15(18), pages 1-20, September.
    10. Mateusz Trzeciak & Izabela Jonek-Kowalska, 2021. "Monitoring and Control in Program Management as Effectiveness Drivers in Polish Energy Sector. Diagnosis and Directions of Improvement," Energies, MDPI, vol. 14(15), pages 1-25, July.
    11. Martin Decky & Katarina Hodasova & Zuzana Papanova & Eva Remisova, 2022. "Sustainable Adaptive Cycle Pavements Using Composite Foam Concrete at High Altitudes in Central Europe," Sustainability, MDPI, vol. 14(15), pages 1-19, July.
    12. Gahm, Christian & Dünnwald, Bastian & Sahamie, Ramin, 2014. "A multi-criteria master production scheduling approach for special purpose machinery," International Journal of Production Economics, Elsevier, vol. 149(C), pages 89-101.
    13. YeEun Jang & JeongWook Son & June-Seong Yi, 2021. "Classifying the Level of Bid Price Volatility Based on Machine Learning with Parameters from Bid Documents as Risk Factors," Sustainability, MDPI, vol. 13(7), pages 1-18, April.
    14. Erika Dolníková & Dušan Katunský & Zuzana Miňová & Bystrík Dolník, 2021. "Influence of the Adaptation of Balconies to Loggias on the Lighting Climate inside an Apartment Building under Cloudy Sky," Sustainability, MDPI, vol. 13(6), pages 1-24, March.
    15. Bassem Jamoussi & Asad Abu-Rizaiza & Ali AL-Haij, 2022. "Sustainable Building Standards, Codes and Certification Systems: The Status Quo and Future Directions in Saudi Arabia," Sustainability, MDPI, vol. 14(16), pages 1-24, August.
    16. Čeněk Jarský & Miloslava Popenková & Jozef Gašparík & Patrik Šťastný, 2022. "On Use of Construction Technology Designs for Expert Opinions," Sustainability, MDPI, vol. 14(9), pages 1-12, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:13:y:2021:i:21:p:12173-:d:672038. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.