Construction scheduling using multi-constraint and genetic algorithms approach

Author

Listed:
  • Nashwan Dawood
  • Eknarin Sriprasert

Abstract

Reliable construction schedules are important for effective co-ordination across the supply chain and various trades at the construction work face. Reliability of construction schedules can be enhanced and improved through satisfying all potential constraints prior to execution on site. Availability of resources, execution space, execution logic, physical dependency of construction products, client instructions and others can be regarded as potential constraints. Current scheduling tools and techniques are fragmented and designed to deal with a limited set of construction constraints. In this context, a methodology termed 'multi-constraint scheduling' is introduced in which four major groups of construction constraints including physical, contract, resource and information constraints are considered to demonstrate the approach. A genetic algorithm (GA) has been developed and used for a multi-constraint optimization problem. Given multiple constraints such as activity dependency, limited working area, and resource and information readiness, the GA alters tasks' priorities and construction methods so as to arrive at an optimum or near optimum set of project duration, cost, and smooth resource profiles. The multi-constraints approach has been practically developed as an embedded macro in MS Project. Several experiments were conducted using a simple project and it was concluded that GA can provide near optimum and constraint-free schedules within an acceptable searching time. This will be vital to improve the productivity and predictability of construction sites.

Suggested Citation

  • Nashwan Dawood & Eknarin Sriprasert, 2006. "Construction scheduling using multi-constraint and genetic algorithms approach," Construction Management and Economics, Taylor & Francis Journals, vol. 24(1), pages 19-30.
  • Handle: RePEc:taf:conmgt:v:24:y:2006:i:1:p:19-30
    DOI: 10.1080/01446190500310486
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190500310486
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190500310486?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Borna Dasović & Mario Galić & Uroš Klanšek, 2020. "A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling," Sustainability, MDPI, vol. 12(8), pages 1-18, April.
    2. Borna Dasović & Uroš Klanšek, 2021. "Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling," Sustainability, MDPI, vol. 13(21), pages 1-20, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:24:y:2006:i:1:p:19-30. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.