IDEAS home Printed from https://ideas.repec.org/a/gam/jeners/v16y2023i20p7091-d1259676.html
   My bibliography  Save this article

On Energy Consumption and Productivity in a Mixed-Model Assembly Line Sequencing Problem

Author

Listed:
  • Iwona Paprocka

    (Department of Engineering Processes Automation and Integrated Manufacturing Systems, Silesian University of Technology, Konarskiego 18A, 44-100 Gliwice, Poland)

  • Damian Krenczyk

    (Department of Engineering Processes Automation and Integrated Manufacturing Systems, Silesian University of Technology, Konarskiego 18A, 44-100 Gliwice, Poland)

Abstract

Mixed and multi-model assembly line sequencing problems are more practical than single-product models. The methods and selection criteria used must keep up with the constantly increasing level of variability, synchronize flows between various—often very energy-intensive production departments—and cope with high dynamics resulting from interrupted supply chains. The requirements for conscious use of Earth’s limited natural resources and the need to limit energy consumption and interference in the environment force the inclusion of additional evaluation criteria focusing on the environmental aspect in optimization models. Effective sustainable solutions take into account productivity, timeliness, flow synchronization, and the reduction of energy consumption. In the paper, the problem of determining the sequence of vehicles for a selected class of multi-version assembly lines, in which the order restrictions were determined taking into account the above criteria, is presented. Original value of the paper is the development of the Grey Wolf Optimizer (GWO) for the mixed-model assembly lines sequencing problem. In the paper, a comparative analysis of the greedy heuristics, Simulated Annealing and GWO for a real case study of a mixed vehicle assembly line is presented. The GWO outperforms other algorithms. Overall research performance of the GWO on the sequencing problem is effective.

Suggested Citation

  • Iwona Paprocka & Damian Krenczyk, 2023. "On Energy Consumption and Productivity in a Mixed-Model Assembly Line Sequencing Problem," Energies, MDPI, vol. 16(20), pages 1-19, October.
  • Handle: RePEc:gam:jeners:v:16:y:2023:i:20:p:7091-:d:1259676
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/1996-1073/16/20/7091/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/1996-1073/16/20/7091/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Fernando Enzo Kenta Sato & Toshihiko Nakata, 2020. "Energy Consumption Analysis for Vehicle Production through a Material Flow Approach," Energies, MDPI, vol. 13(9), pages 1-18, May.
    2. Briant, Olivier & Naddef, Denis & Mounié, Grégory, 2008. "Greedy approach and multi-criteria simulated annealing for the car sequencing problem," European Journal of Operational Research, Elsevier, vol. 191(3), pages 993-1003, December.
    3. Solnon, Christine & Cung, Van Dat & Nguyen, Alain & Artigues, Christian, 2008. "The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem," European Journal of Operational Research, Elsevier, vol. 191(3), pages 912-927, December.
    4. Eglese, R. W., 1990. "Simulated annealing: A tool for operational research," European Journal of Operational Research, Elsevier, vol. 46(3), pages 271-281, June.
    5. Parames Chutima & Sathaporn Olarnviwatchai, 2018. "A multi-objective car sequencing problem on two-sided assembly lines," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1617-1636, October.
    6. M Gravel & C Gagné & W L Price, 2005. "Review and comparison of three methods for the solution of the car sequencing problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(11), pages 1287-1295, November.
    7. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    8. Cordeau, Jean-François & Laporte, Gilbert & Pasin, Federico, 2008. "Iterated tabu search for the car sequencing problem," European Journal of Operational Research, Elsevier, vol. 191(3), pages 945-956, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Parames Chutima & Sathaporn Olarnviwatchai, 2018. "A multi-objective car sequencing problem on two-sided assembly lines," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1617-1636, October.
    2. Pontes, Lara & Neves, Carlos & Subramanian, Anand & Battarra, Maria, 2024. "The maximum length car sequencing problem," European Journal of Operational Research, Elsevier, vol. 316(2), pages 707-717.
    3. Boysen, Nils & Scholl, Armin & Wopperer, Nico, 2012. "Resequencing of mixed-model assembly lines: Survey and research agenda," European Journal of Operational Research, Elsevier, vol. 216(3), pages 594-604.
    4. Florian Jaehn & Sergey Kovalev & Mikhail Y. Kovalyov & Erwin Pesch, 2014. "Multiproduct batching and scheduling with buffered rework: The case of a car paint shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(6), pages 458-471, September.
    5. Uli Golle & Franz Rothlauf & Nils Boysen, 2015. "Iterative beam search for car sequencing," Annals of Operations Research, Springer, vol. 226(1), pages 239-254, March.
    6. Elahi, Mirza M. Lutfe & Rajpurohit, Karthik & Rosenberger, Jay M. & Zaruba, Gergely & Priest, John, 2015. "Optimizing real-time vehicle sequencing of a paint shop conveyor system," Omega, Elsevier, vol. 55(C), pages 61-72.
    7. Yuan Sun & Samuel Esler & Dhananjay Thiruvady & Andreas T. Ernst & Xiaodong Li & Kerri Morgan, 2024. "Instance space analysis for the car sequencing problem," Annals of Operations Research, Springer, vol. 341(1), pages 41-69, October.
    8. Golle, Uli & Rothlauf, Franz & Boysen, Nils, 2014. "Car sequencing versus mixed-model sequencing: A computational study," European Journal of Operational Research, Elsevier, vol. 237(1), pages 50-61.
    9. Elif Elcin Gunay & Ufuk Kula, 2017. "A stochastic programming model for resequencing buffer content optimisation in mixed-model assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2897-2912, May.
    10. Boysen, Nils & Bock, Stefan, 2011. "Scheduling just-in-time part supply for mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
    11. Rui Zhang, 2017. "Environment-Aware Production Scheduling for Paint Shops in Automobile Manufacturing: A Multi-Objective Optimization Approach," IJERPH, MDPI, vol. 15(1), pages 1-32, December.
    12. Staeblein, Thomas & Aoki, Katsuki, 2015. "Planning and scheduling in the automotive industry: A comparison of industrial practice at German and Japanese makers," International Journal of Production Economics, Elsevier, vol. 162(C), pages 258-272.
    13. Marcel Lehmann & Heinrich Kuhn, 2020. "Modeling and analyzing sequence stability in flexible automotive production systems," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 366-394, June.
    14. Janis Brammer & Bernhard Lutz & Dirk Neumann, 2022. "Stochastic mixed model sequencing with multiple stations using reinforcement learning and probability quantiles," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(1), pages 29-56, March.
    15. Masoud Rabbani & Mahdi Mokhtarzadeh & Neda Manavizadeh & Azadeh Farsi, 2021. "Solving a bi-objective mixed-model assembly-line sequencing using metaheuristic algorithms considering ergonomic factors, customer behavior, and periodic maintenance," OPSEARCH, Springer;Operational Research Society of India, vol. 58(3), pages 513-539, September.
    16. Yilmazlar, I. Ozan & Kurz, Mary E. & Rahimian, Hamed, 2024. "Mixed-model sequencing with stochastic failures: A case study for automobile industry," European Journal of Operational Research, Elsevier, vol. 319(1), pages 206-221.
    17. Buergin, Jens & Hammerschmidt, Andreas & Hao, Han & Kramer, Sergej & Tutsch, Hansjoerg & Lanza, Gisela, 2019. "Robust order planning with planned orders for multi-variant series production in a production network," International Journal of Production Economics, Elsevier, vol. 210(C), pages 107-119.
    18. Bautista, Joaquín & Cano, Alberto, 2011. "Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules," European Journal of Operational Research, Elsevier, vol. 210(3), pages 495-513, May.
    19. Golle, Uli & Boysen, Nils & Rothlauf, Franz, 2010. "Analysis and design of sequencing rules for car sequencing," European Journal of Operational Research, Elsevier, vol. 206(3), pages 579-585, November.
    20. Karim Aroui & Gülgün Alpan & Yannick Frein, 2017. "Minimising work overload in mixed-model assembly lines with different types of operators: a case study from the truck industry," International Journal of Production Research, Taylor & Francis Journals, vol. 55(21), pages 6305-6326, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:20:p:7091-:d:1259676. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.