Variance Gamma process as degradation model for prognosis and imperfect maintenance of centrifugal pumps
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2022.108417
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Dilip B. Madan & Peter P. Carr & Eric C. Chang, 1998. "The Variance Gamma Process and Option Pricing," Review of Finance, European Finance Association, vol. 2(1), pages 79-105.
- Dilip B. Madan & Frank Milne, 1991. "Option Pricing With V. G. Martingale Components1," Mathematical Finance, Wiley Blackwell, vol. 1(4), pages 39-55, October.
- T. R. Hurd, 2009. "Credit risk modeling using time-changed Brownian motion," Papers 0904.2376, arXiv.org.
- Olivier Le Courtois & Christian Walter, 2014. "The Computation of Risk Budgets under the Lévy Process Assumption," Post-Print hal-01892836, HAL.
- T. R. Hurd, 2009. "Credit Risk Modeling Using Time-Changed Brownian Motion," International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 12(08), pages 1213-1230.
- Martin Wallmeier & Martin Diethelm, 2012. "Multivariate downside risk: Normal versus Variance Gamma," Journal of Futures Markets, John Wiley & Sons, Ltd., vol. 32(5), pages 431-458, May.
- Dilip B. Madan & Frank Milne, 1991. "Option Pricing With V. G. Martingale Components," Working Paper 1159, Economics Department, Queen's University.
- Bismut, Elizabeth & Straub, Daniel, 2021. "Optimal adaptive inspection and maintenance planning for deteriorating structural systems," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Fouladirad, Mitra & Paroissin, Christian & Grall, Antoine, 2018. "Sensitivity of optimal replacement policies to lifetime parameter estimates," European Journal of Operational Research, Elsevier, vol. 266(3), pages 963-975.
- Marco Bee & Maria Michela Dickson & Flavio Santi, 2018.
"Likelihood-based risk estimation for variance-gamma models,"
Statistical Methods & Applications, Springer;Società Italiana di Statistica, vol. 27(1), pages 69-89, March.
- Marco Bee & Maria Michela Dickson & Flavio Santi, 2017. "Likelihood-based Risk Estimation for Variance-Gamma Models," DEM Working Papers 2017/03, Department of Economics and Management.
- Olivier Le Courtois & Christian Walter, 2014.
"The Computation of Risk Budgets under the Lévy Process Assumption,"
Finance, Presses universitaires de Grenoble, vol. 35(2), pages 87-108.
- Olivier Le Courtois & Christian Walter, 2014. "The Computation of Risk Budgets under the Lévy Process Assumption," Post-Print halshs-04506681, HAL.
- Olivier Le Courtois & Christian Walter, 2014. "The Computation of Risk Budgets under the Lévy Process Assumption," Post-Print hal-02313172, HAL.
- Fiorani, Filo, 2004. "Option Pricing Under the Variance Gamma Process," MPRA Paper 15395, University Library of Munich, Germany.
- van Noortwijk, J.M., 2009. "A survey of the application of gamma processes in maintenance," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 2-21.
- Madan, Dilip B & Seneta, Eugene, 1990. "The Variance Gamma (V.G.) Model for Share Market Returns," The Journal of Business, University of Chicago Press, vol. 63(4), pages 511-524, October.
- Elton A. Daal & Dilip B. Madan, 2005. "An Empirical Examination of the Variance-Gamma Model for Foreign Currency Options," The Journal of Business, University of Chicago Press, vol. 78(6), pages 2121-2152, November.
- Richard Finlay & Eugene Seneta, 2008. "Stationary‐Increment Variance‐Gamma and t Models: Simulation and Parameter Estimation," International Statistical Review, International Statistical Institute, vol. 76(2), pages 167-186, August.
- Guo, Jingbo & Wang, Changxi & Cabrera, Javier & Elsayed, Elsayed A., 2018. "Improved inverse Gaussian process and bootstrap: Degradation and reliability metrics," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 269-277.
- Jahani, Salman & Zhou, Shiyu & Veeramani, Dharmaraj, 2021. "Stochastic prognostics under multiple time-varying environmental factors," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Xu, Huyang & Fard, Nasser & Fang, Yuanchen, 2020. "Time series chain graph for modeling reliability covariates in degradation process," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Yan, Tao & Lei, Yaguo & Li, Naipeng & Wang, Biao & Wang, Wenting, 2021. "Degradation modeling and remaining useful life prediction for dependent competing failure processes," Reliability Engineering and System Safety, Elsevier, vol. 212(C).
- Ling, M.H. & Ng, H.K.T. & Tsui, K.L., 2019. "Bayesian and likelihood inferences on remaining useful life in two-phase degradation models under gamma process," Reliability Engineering and System Safety, Elsevier, vol. 184(C), pages 77-85.
- Veloso, Guilherme A. & Loschi, Rosangela H., 2021. "Dynamic linear degradation model: Dealing with heterogeneity in degradation paths," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
- Wen, Pengfei & Zhao, Shuai & Chen, Shaowei & Li, Yong, 2021. "A generalized remaining useful life prediction method for complex systems based on composite health indicator," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Sun, Bo & Fan, Xuejun & van Driel, Willem & Cui, Chengqiang & Zhang, Guoqi, 2018. "A stochastic process based reliability prediction method for LED driver," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 140-146.
- Heidary, Roohollah & Groth, Katrina M., 2021. "A hybrid population-based degradation model for pipeline pitting corrosion," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
- Gian P. Cervellera & Marco P. Tucci, 2017. "A note on the Estimation of a Gamma-Variance Process: Learning from a Failure," Computational Economics, Springer;Society for Computational Economics, vol. 49(3), pages 363-385, March.
- Wang, Changxi & Elsayed, Elsayed A., 2020. "Stochastic modeling of corrosion growth," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ma, Jie & Cai, Li & Liao, Guobo & Yin, Hongpeng & Si, Xiaosheng & Zhang, Peng, 2023. "A multi-phase Wiener process-based degradation model with imperfect maintenance activities," Reliability Engineering and System Safety, Elsevier, vol. 232(C).
- Dai, Xinliang & Qu, Sheng & Sui, Hao & Wu, Pingbo, 2022. "Reliability modelling of wheel wear deterioration using conditional bivariate gamma processes and Bayesian hierarchical models," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Aizpurua, J.I. & Stewart, B.G. & McArthur, S.D.J. & Penalba, M. & Barrenetxea, M. & Muxika, E. & Ringwood, J.V., 2022. "Probabilistic forecasting informed failure prognostics framework for improved RUL prediction under uncertainty: A transformer case study," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Ait Mokhtar, El Hassene & Laggoune, Radouane & Chateauneuf, Alaa, 2023. "Imperfect maintenance modeling and assessment of repairable multi-component systems," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Zhang, Nan & Deng, Yingjun & Liu, Bin & Zhang, Jun, 2023. "Condition-based maintenance for a multi-component system in a dynamic operating environment," Reliability Engineering and System Safety, Elsevier, vol. 231(C).
- Zuo, Jian & Cadet, Catherine & Li, Zhongliang & Bérenguer, Christophe & Outbib, Rachid, 2024. "A deterioration-aware energy management strategy for the lifetime improvement of a multi-stack fuel cell system subject to a random dynamic load," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Rasay, Hasan & Taghipour, Sharareh & Sharifi, Mani, 2022. "An integrated Maintenance and Statistical Process Control Model for a Deteriorating Production Process," Reliability Engineering and System Safety, Elsevier, vol. 228(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gian P. Cervellera & Marco P. Tucci, 2017. "A note on the Estimation of a Gamma-Variance Process: Learning from a Failure," Computational Economics, Springer;Society for Computational Economics, vol. 49(3), pages 363-385, March.
- Marwa Belhaj Salem & Mitra Fouladirad & Estelle Deloux, 2021. "Prognostic and Classification of Dynamic Degradation in a Mechanical System Using Variance Gamma Process," Mathematics, MDPI, vol. 9(3), pages 1-25, January.
- Roman V. Ivanov, 2018. "Option Pricing In The Variance-Gamma Model Under The Drift Jump," International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 21(04), pages 1-19, June.
- Marco Bee & Maria Michela Dickson & Flavio Santi, 2018.
"Likelihood-based risk estimation for variance-gamma models,"
Statistical Methods & Applications, Springer;Società Italiana di Statistica, vol. 27(1), pages 69-89, March.
- Marco Bee & Maria Michela Dickson & Flavio Santi, 2017. "Likelihood-based Risk Estimation for Variance-Gamma Models," DEM Working Papers 2017/03, Department of Economics and Management.
- Hatem Ben‐Ameur & Rim Chérif & Bruno Rémillard, 2020. "Dynamic programming for valuing American options under a variance‐gamma process," Journal of Futures Markets, John Wiley & Sons, Ltd., vol. 40(10), pages 1548-1561, October.
- Ivanov Roman V., 2018. "On risk measuring in the variance-gamma model," Statistics & Risk Modeling, De Gruyter, vol. 35(1-2), pages 23-33, January.
- Vladimir K. Kaishev & Dimitrina S. Dimitrova, 2009. "Dirichlet Bridge Sampling for the Variance Gamma Process: Pricing Path-Dependent Options," Management Science, INFORMS, vol. 55(3), pages 483-496, March.
- Roman V. Ivanov & Katsunori Ano, 2016. "On exact pricing of FX options in multivariate time-changed Lévy models," Review of Derivatives Research, Springer, vol. 19(3), pages 201-216, October.
- Roman Ivanov, 2015. "The distribution of the maximum of a variance gamma process and path-dependent option pricing," Finance and Stochastics, Springer, vol. 19(4), pages 979-993, October.
- Laura Ballota & Griselda Deelstra & Grégory Rayée, 2015. "Quanto Implied Correlation in a Multi-Lévy Framework," Working Papers ECARES ECARES 2015-36, ULB -- Universite Libre de Bruxelles.
- Erdinc Akyildirim & Alper A. Hekimoglu & Ahmet Sensoy & Frank J. Fabozzi, 2023. "Extending the Merton model with applications to credit value adjustment," Annals of Operations Research, Springer, vol. 326(1), pages 27-65, July.
- Göncü, Ahmet & Karahan, Mehmet Oğuz & Kuzubaş, Tolga Umut, 2016.
"A comparative goodness-of-fit analysis of distributions of some Lévy processes and Heston model to stock index returns,"
The North American Journal of Economics and Finance, Elsevier, vol. 36(C), pages 69-83.
- Ahmet Göncü & Mehmet Oguz Karahan & Tolga Umut Kuzubas, 2014. "A Comparative Goodness-of-fit Analysis of Distributions of Some Levy Processes and Heston Model to Stock Index Returns," Working Papers 2014/07, Bogazici University, Department of Economics.
- Fiorani, Filo, 2004. "Option Pricing Under the Variance Gamma Process," MPRA Paper 15395, University Library of Munich, Germany.
- George Bouzianis & Lane P. Hughston, 2019. "Determination Of The Lévy Exponent In Asset Pricing Models," International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 22(01), pages 1-18, February.
- Liming Feng & Vadim Linetsky, 2008. "Pricing Options in Jump-Diffusion Models: An Extrapolation Approach," Operations Research, INFORMS, vol. 56(2), pages 304-325, April.
- Athanassios N. Avramidis & Pierre L'Ecuyer, 2006. "Efficient Monte Carlo and Quasi-Monte Carlo Option Pricing Under the Variance Gamma Model," Management Science, INFORMS, vol. 52(12), pages 1930-1944, December.
- Chan, Tat Lung (Ron), 2020. "Hedging and pricing early-exercise options with complex fourier series expansion," The North American Journal of Economics and Finance, Elsevier, vol. 54(C).
- Winston Buckley & Sandun Perera, 2019. "Optimal demand in a mispriced asymmetric Carr–Geman–Madan–Yor (CGMY) economy," Annals of Finance, Springer, vol. 15(3), pages 337-368, September.
- Claudia Yeap & Simon S Kwok & S T Boris Choy, 2018.
"A Flexible Generalized Hyperbolic Option Pricing Model and Its Special Cases,"
Journal of Financial Econometrics, Oxford University Press, vol. 16(3), pages 425-460.
- Yeap, Claudia & Kwok, Simon S. & Choy, S. T. Boris, 2016. "A Flexible Generalised Hyperbolic Option Pricing Model and its Special Cases," Working Papers 2016-14, University of Sydney, School of Economics.
- Svetlana Boyarchenko & Sergei Levendorskiĭ, 2019.
"Sinh-Acceleration: Efficient Evaluation Of Probability Distributions, Option Pricing, And Monte Carlo Simulations,"
International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 22(03), pages 1-49, May.
- Svetlana Boyarchenko & Sergei Levendorskiu{i}, 2018. "SINH-acceleration: efficient evaluation of probability distributions, option pricing, and Monte-Carlo simulations," Papers 1808.05295, arXiv.org.
More about this item
Keywords
Variance Gamma; Stochastic Degradation model; Statistical inference; Remaining useful life estimation; Prognostic; Sensitivity analysis; Estimation error propagation; Imperfect maintenance;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:223:y:2022:i:c:s0951832022000850. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.