IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v143y2013i2p509-517.html
   My bibliography  Save this article

Inventory reduction in spare part networks by selective throughput time reduction

Author

Listed:
  • van der Heijden, M.C.
  • Alvarez, E.M.
  • Schutten, J.M.J.

Abstract

We consider combined inventory control and throughput time reduction in multi-echelon, multi-indenture spare part networks for system upkeep of capital goods. We construct a model in which standard throughput times (TPTs) for repair and transportation can be reduced at additional costs. We first estimate the marginal impact of TPT reduction on the system availability. Next, we develop an optimization heuristic for the cost trade-off between TPT reduction and spare part inventories. In a case study at Thales Netherlands with limited options for TPT reduction, we find a net saving of 5.6% on spare part inventories. In an extensive numerical experiment, we find a 20% cost reduction on average compared to standard spare part inventory optimization. TPT reductions downstream in the spare part supply chain appear to be the most effective.

Suggested Citation

  • van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
  • Handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:509-517
    DOI: 10.1016/j.ijpe.2012.03.020
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312001168
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.03.020?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    2. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
    3. I. J. B. F. Adan & A. Sleptchenko & G. J. Van Houtum, 2009. "Reducing Costs Of Spare Parts Supply Systems Via Static Priorities," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 26(04), pages 559-585.
    4. Van Utterbeeck, Filip & Wong, Hartanto & Van Oudheusden, Dirk & Cattrysse, Dirk, 2009. "The effects of resupply flexibility on the design of service parts supply systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 45(1), pages 72-85, January.
    5. Gary D. Scudder, 1984. "Priority Scheduling and Spares Stocking Policies for a Repair Shop: The Multiple Failure Case," Management Science, INFORMS, vol. 30(6), pages 739-749, June.
    6. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    7. Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
    8. Warren H. Hausman & Gary D. Scudder, 1982. "Priority Scheduling Rules for Repairable Inventory Systems," Management Science, INFORMS, vol. 28(11), pages 1215-1232, November.
    9. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
    10. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    11. Y Perlman & A Mehrez & M Kaspi, 2001. "Setting expediting repair policy in a multi-echelon repairable-item inventory system with limited repair capacity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(2), pages 198-209, February.
    12. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    13. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
    2. Zhu, Sha & van Jaarsveld, Willem & Dekker, Rommert, 2022. "Critical project planning and spare parts inventory management in shutdown maintenance," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    3. Gerrits, B. & Topan, E. & van der Heijden, M.C., 2022. "Operational planning in service control towers – heuristics and case study," European Journal of Operational Research, Elsevier, vol. 302(3), pages 983-998.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    2. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    3. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    4. Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
    5. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    6. Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
    7. Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
    8. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    9. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
    10. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    11. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    12. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    13. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    14. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    15. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    16. Parvaneh Samouei & Amir Kheirkhah & Parviz Fattahi, 2015. "A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount," Annals of Operations Research, Springer, vol. 226(1), pages 551-563, March.
    17. Arts, Joachim, 2017. "A multi-item approach to repairable stocking and expediting in a fluctuating demand environment," European Journal of Operational Research, Elsevier, vol. 256(1), pages 102-115.
    18. Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
    19. Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable product-service supply chains for repairable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 299-321.
    20. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:143:y:2013:i:2:p:509-517. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.