IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v92y2004i1p61-74.html
   My bibliography  Save this article

Economic design of control charts for non-normal data using variable sampling policy

Author

Listed:
  • Chen, Yan-Kwang

Abstract

No abstract is available for this item.

Suggested Citation

  • Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
  • Handle: RePEc:eee:proeco:v:92:y:2004:i:1:p:61-74
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00308-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Pongcharoen, P. & Hicks, C. & Braiden, P. M. & Stewardson, D. J., 2002. "Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products," International Journal of Production Economics, Elsevier, vol. 78(3), pages 311-322, August.
    2. Disney, S. M. & Naim, M. M. & Towill, D. R., 2000. "Genetic algorithm optimisation of a class of inventory control systems," International Journal of Production Economics, Elsevier, vol. 68(3), pages 259-278, December.
    3. Bai, D. S. & Lee, K. T., 1998. "An economic design of variable sampling interval control charts," International Journal of Production Economics, Elsevier, vol. 54(1), pages 57-64, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Y-K Chen & H-H Chang, 2008. "Economic design of variable parameters X̄ control charts for processes with fuzzy mean shifts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1128-1135, August.
    2. Xurxo Rigueira & María Araújo & Javier Martínez & Paulino José García-Nieto & Iago Ocarranza, 2022. "Functional Data Analysis for the Detection of Outliers and Study of the Effects of the COVID-19 Pandemic on Air Quality: A Case Study in Gijón, Spain," Mathematics, MDPI, vol. 10(14), pages 1-27, July.
    3. De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
    4. Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
    5. Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
    6. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    7. Yu-min Liu & Li Xue, 2015. "The optimization design of EWMA charts for monitoring environmental performance," Annals of Operations Research, Springer, vol. 228(1), pages 113-124, May.
    8. Y-K Chen, 2007. "Economic design of an adaptive T 2 control chart," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(3), pages 337-345, March.
    9. Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
    10. Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
    11. Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
    12. Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
    13. Chen, Yan-Kwang & Hsieh, Kun-Lin, 2007. "Hotelling's T2 charts with variable sample size and control limit," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1251-1262, November.
    14. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    15. Iziy Azamsadat & Sadeghpour Gildeh Bahram & Monabbati Ehsan, 2017. "Comparison Between the Economic-Statistical Design of Double and Triple Sampling X¯\bar{X} Control Charts," Stochastics and Quality Control, De Gruyter, vol. 32(1), pages 49-61, June.
    16. Yan-Kwang Chen, 2009. "Economic design of T 2 control charts with the VSSI sampling scheme," Quality & Quantity: International Journal of Methodology, Springer, vol. 43(1), pages 109-122, January.
    17. Torng, Chau-Chen & Lee, Pei-Hsi & Liao, Nai-Yi, 2009. "An economic-statistical design of double sampling control chart," International Journal of Production Economics, Elsevier, vol. 120(2), pages 495-500, August.
    18. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
    19. Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
    20. Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2011. "Variable parameter and double sampling charts in the presence of correlation: The Markov chain approach," International Journal of Production Economics, Elsevier, vol. 130(2), pages 224-229, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
    2. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    3. Vitayasak, Srisatja & Pongcharoen, Pupong & Hicks, Chris, 2017. "A tool for solving stochastic dynamic facility layout problems with stochastic demand using either a Genetic Algorithm or modified Backtracking Search Algorithm," International Journal of Production Economics, Elsevier, vol. 190(C), pages 146-157.
    4. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    5. Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
    6. Nenes, George, 2011. "A new approach for the economic design of fully adaptive control charts," International Journal of Production Economics, Elsevier, vol. 131(2), pages 631-642, June.
    7. Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
    8. Mahadik Shashibhushan B. & Shirke Digambar T., 2007. "Economic Design of A Modified Variable Sample Size and Sampling Interval Chart," Stochastics and Quality Control, De Gruyter, vol. 22(2), pages 273-293, January.
    9. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    10. Oscar Revelo Sánchez & César A. Collazos & Miguel A. Redondo, 2021. "Automatic Group Organization for Collaborative Learning Applying Genetic Algorithm Techniques and the Big Five Model," Mathematics, MDPI, vol. 9(13), pages 1-23, July.
    11. Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
    12. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    13. Warburton, Roger D. H., 2004. "An exact analytical solution to the production inventory control problem," International Journal of Production Economics, Elsevier, vol. 92(1), pages 81-96, November.
    14. Jiyoung Jung & Kundo Park & Byungjin Cho & Jinkyoo Park & Seunghwa Ryu, 2023. "Optimization of injection molding process using multi-objective bayesian optimization and constrained generative inverse design networks," Journal of Intelligent Manufacturing, Springer, vol. 34(8), pages 3623-3636, December.
    15. Song, Dong-Ping, 2006. "Raw material release time control for complex make-to-order products with stochastic processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 371-385, September.
    16. Haral, Uday & Chen, Rew-Win & Ferrell, William Jr & Kurz, Mary Beth, 2007. "Multiobjective single machine scheduling with nontraditional requirements," International Journal of Production Economics, Elsevier, vol. 106(2), pages 574-584, April.
    17. Rezaei, Jafar & Davoodi, Mansoor, 2011. "Multi-objective models for lot-sizing with supplier selection," International Journal of Production Economics, Elsevier, vol. 130(1), pages 77-86, March.
    18. Fong-jung Yu & Jiang-liang Hou, 2006. "Optimization of design parameters for [image omitted] control charts with multiple assignable causes," Journal of Applied Statistics, Taylor & Francis Journals, vol. 33(3), pages 279-290.
    19. Aggelogiannaki, Eleni & Sarimveis, Haralambos, 2008. "Design of a novel adaptive inventory control system based on the online identification of lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 781-792, August.
    20. Pathumnakul, Supachai & Egbelu, Pius J., 2006. "An algorithm for minimizing weighted earliness penalty in assembly job shops," International Journal of Production Economics, Elsevier, vol. 103(1), pages 230-245, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:92:y:2004:i:1:p:61-74. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.