An economic-statistical design of double sampling control chart
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- De Magalhaes, Maysa S. & Epprecht, Eugenio K. & Costa, Antonio F. B., 2001. "Economic design of a Vp chart," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 191-200, December.
- Prabhu, Sharad S. & Montgomery, Douglas C. & Runger, George C., 1997. "Economic-statistical design of an adaptive chart," International Journal of Production Economics, Elsevier, vol. 49(1), pages 1-15, March.
- Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
- He, David & Grigoryan, Arsen, 2006. "Joint statistical design of double sampling and s charts," European Journal of Operational Research, Elsevier, vol. 168(1), pages 122-142, January.
- Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
- Chao-Yu Chou & Chung-Ho Chen & Hui-Rong Liu, 2006. "Economic Design of EWMA Charts with Variable Sampling Intervals," Quality & Quantity: International Journal of Methodology, Springer, vol. 40(6), pages 879-896, December.
- Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lee, Pei-Hsi, 2013. "Joint statistical design of X¯ and s charts with combined double sampling and variable sampling interval," European Journal of Operational Research, Elsevier, vol. 225(2), pages 285-297.
- Du, Shichang & Lv, Jun, 2013. "Minimal Euclidean distance chart based on support vector regression for monitoring mean shifts of auto-correlated processes," International Journal of Production Economics, Elsevier, vol. 141(1), pages 377-387.
- Franco, Bruno Chaves & Celano, Giovanni & Castagliola, Philippe & Costa, Antonio Fernando Branco, 2014. "Economic design of Shewhart control charts for monitoring autocorrelated data with skip sampling strategies," International Journal of Production Economics, Elsevier, vol. 151(C), pages 121-130.
- Ou, Yanjing & Wu, Zhang & Goh, Thong Ngee, 2011. "A new SPRT chart for monitoring process mean and variance," International Journal of Production Economics, Elsevier, vol. 132(2), pages 303-314, August.
- Zhang, Min & Nie, Guohua & He, Zhen, 2014. "Performance of cumulative count of conforming chart of variable sampling intervals with estimated control limits," International Journal of Production Economics, Elsevier, vol. 150(C), pages 114-124.
- Ho, Linda Lee & Aparisi, Francisco, 2016. "ATTRIVAR: Optimized control charts to monitor process mean with lower operational cost," International Journal of Production Economics, Elsevier, vol. 182(C), pages 472-483.
- Khoo, Michael B.C. & Teoh, W.L. & Castagliola, Philippe & Lee, M.H., 2013. "Optimal designs of the double sampling X¯ chart with estimated parameters," International Journal of Production Economics, Elsevier, vol. 144(1), pages 345-357.
- Lee, Pei-Hsi, 2011. "Adaptive R charts with variable parameters," Computational Statistics & Data Analysis, Elsevier, vol. 55(5), pages 2003-2010, May.
- Wu, Zhang & Yang, Mei & Khoo, Michael B.C. & Castagliola, Philippe, 2011. "What are the best sample sizes for the Xbar and CUSUM charts?," International Journal of Production Economics, Elsevier, vol. 131(2), pages 650-662, June.
- Tomohiro, Ryosuke & Arizono, Ikuo & Takemoto, Yasuhiko, 2020. "Economic design of double sampling Cpm control chart for monitoring process capability," International Journal of Production Economics, Elsevier, vol. 221(C).
- Lee, Pei-Hsi & Torng, Chau-Chen & Liao, Li-Fang, 2012. "An economic design of combined double sampling and variable sampling interval X¯ control chart," International Journal of Production Economics, Elsevier, vol. 138(1), pages 102-106.
- Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2011. "Variable parameter and double sampling charts in the presence of correlation: The Markov chain approach," International Journal of Production Economics, Elsevier, vol. 130(2), pages 224-229, April.
- Iziy Azamsadat & Sadeghpour Gildeh Bahram & Monabbati Ehsan, 2017. "Comparison Between the Economic-Statistical Design of Double and Triple Sampling X¯\bar{X} Control Charts," Stochastics and Quality Control, De Gruyter, vol. 32(1), pages 49-61, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
- Lee, Pei-Hsi & Torng, Chau-Chen & Liao, Li-Fang, 2012. "An economic design of combined double sampling and variable sampling interval X¯ control chart," International Journal of Production Economics, Elsevier, vol. 138(1), pages 102-106.
- Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
- Celano, Giovanni & De Magalhães, Maysa S. & Costa, Antonio F.B. & Fichera, Sergio, 2011. "A stochastic shift model for economically designed charts constrained by the process stage configuration," International Journal of Production Economics, Elsevier, vol. 132(2), pages 315-325, August.
- Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
- Iziy Azamsadat & Sadeghpour Gildeh Bahram & Monabbati Ehsan, 2017. "Comparison Between the Economic-Statistical Design of Double and Triple Sampling X¯\bar{X} Control Charts," Stochastics and Quality Control, De Gruyter, vol. 32(1), pages 49-61, June.
- De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
- A. F. B. Costa & M. A. G. Machado, 2008. "Bivariate control charts with double sampling," Journal of Applied Statistics, Taylor & Francis Journals, vol. 35(7), pages 809-822.
- De Magalhaes, Maysa S. & Moura Neto, Francisco D., 2005. "Joint economic model for totally adaptive and R charts," European Journal of Operational Research, Elsevier, vol. 161(1), pages 148-161, February.
- Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
- Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
- Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
- Lin, Yu-Chang & Chou, Chao-Yu, 2005. "On the design of variable sample size and sampling intervals charts under non-normality," International Journal of Production Economics, Elsevier, vol. 96(2), pages 249-261, May.
- Reza Pourtaheri, 2022. "Economic Statistical Design for Three-level Control Charts with Variable Sample Size," Sankhya B: The Indian Journal of Statistics, Springer;Indian Statistical Institute, vol. 84(1), pages 130-145, May.
- Chen, Yan-Kwang & Hsieh, Kun-Lin, 2007. "Hotelling's T2 charts with variable sample size and control limit," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1251-1262, November.
- Tagaras, George, 2017. "New indices for the evaluation of the statistical properties of Bayesian x¯ control charts for short runsAuthor-Name: Nikolaidis, Yiannis," European Journal of Operational Research, Elsevier, vol. 259(1), pages 280-292.
- M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
- Lee, Pei-Hsi, 2011. "Adaptive R charts with variable parameters," Computational Statistics & Data Analysis, Elsevier, vol. 55(5), pages 2003-2010, May.
- Franco, Bruno Chaves & Celano, Giovanni & Castagliola, Philippe & Costa, Antonio Fernando Branco, 2014. "Economic design of Shewhart control charts for monitoring autocorrelated data with skip sampling strategies," International Journal of Production Economics, Elsevier, vol. 151(C), pages 121-130.
- Ching-Hsin Wang & Feng-Chia Li, 2020. "Economic design under gamma shock model of the control chart for sustainable operations," Annals of Operations Research, Springer, vol. 290(1), pages 169-190, July.
More about this item
Keywords
Double sampling control chart Economic-statistical design Duncan's cost model;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:495-500. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.