IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v68y2000i3p259-278.html
   My bibliography  Save this article

Genetic algorithm optimisation of a class of inventory control systems

Author

Listed:
  • Disney, S. M.
  • Naim, M. M.
  • Towill, D. R.

Abstract

No abstract is available for this item.

Suggested Citation

  • Disney, S. M. & Naim, M. M. & Towill, D. R., 2000. "Genetic algorithm optimisation of a class of inventory control systems," International Journal of Production Economics, Elsevier, vol. 68(3), pages 259-278, December.
  • Handle: RePEc:eee:proeco:v:68:y:2000:i:3:p:259-278
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(99)00101-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Caloiero, Giuliano & Strozzi, Fernanda & Zaldívar Comenges, José-Manuel, 2008. "A supply chain as a series of filters or amplifiers of the bullwhip effect," International Journal of Production Economics, Elsevier, vol. 114(2), pages 631-645, August.
    2. Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
    3. Venkateswaran, Jayendran & Son, Young-Jun, 2007. "Effect of information update frequency on the stability of production-inventory control systems," International Journal of Production Economics, Elsevier, vol. 106(1), pages 171-190, March.
    4. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    5. Yasser A. Davizón & César Martínez-Olvera & Rogelio Soto & Carlos Hinojosa & Piero Espino-Román, 2015. "Optimal Control Approaches to the Aggregate Production Planning Problem," Sustainability, MDPI, vol. 7(12), pages 1-16, December.
    6. Sagawa, Juliana Keiko & Nagano, Marcelo Seido, 2015. "Modeling the dynamics of a multi-product manufacturing system: A real case application," European Journal of Operational Research, Elsevier, vol. 244(2), pages 624-636.
    7. Aggelogiannaki, Eleni & Sarimveis, Haralambos, 2008. "Design of a novel adaptive inventory control system based on the online identification of lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 781-792, August.
    8. Warburton, Roger D. H., 2004. "An exact analytical solution to the production inventory control problem," International Journal of Production Economics, Elsevier, vol. 92(1), pages 81-96, November.
    9. Kastsian, Darya & Mönnigmann, Martin, 2011. "Optimization of a vendor managed inventory supply chain with guaranteed stability and robustness," International Journal of Production Economics, Elsevier, vol. 131(2), pages 727-735, June.
    10. Sagawa, Juliana Keiko & Mušič, Gašper, 2019. "Towards the use of bond graphs for manufacturing control: Design of controllers," International Journal of Production Economics, Elsevier, vol. 214(C), pages 53-72.
    11. Rezaei, Jafar & Davoodi, Mansoor, 2011. "Multi-objective models for lot-sizing with supplier selection," International Journal of Production Economics, Elsevier, vol. 130(1), pages 77-86, March.
    12. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:68:y:2000:i:3:p:259-278. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.