Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts
Author
Abstract
Suggested Citation
DOI: 10.1007/s12351-018-0424-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Linderman, Kevin & McKone-Sweet, Kathleen E. & Anderson, John C., 2005. "An integrated systems approach to process control and maintenance," European Journal of Operational Research, Elsevier, vol. 164(2), pages 324-340, July.
- Lin, Yu-Chang & Chou, Chao-Yu, 2007. "Non-normality and the variable parameters control charts," European Journal of Operational Research, Elsevier, vol. 176(1), pages 361-373, January.
- Maoyuan Zhou, 2017. "Variable sample size and variable sampling interval Shewhart control chart with estimated parameters," Operational Research, Springer, vol. 17(1), pages 17-37, April.
- Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
- F L Chen & C H Yeh, 2011. "Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(4), pages 750-759, April.
- Lin, Yu-Chang & Chou, Chao-Yu, 2005. "On the design of variable sample size and sampling intervals charts under non-normality," International Journal of Production Economics, Elsevier, vol. 96(2), pages 249-261, May.
- Chen, Huifen & Cheng, Yuyen, 2007. "Non-normality effects on the economic-statistical design of charts with Weibull in-control time," European Journal of Operational Research, Elsevier, vol. 176(2), pages 986-998, January.
- Ben-Daya, M. & Rahim, M. A., 2000. "Effect of maintenance on the economic design of -control chart," European Journal of Operational Research, Elsevier, vol. 120(1), pages 131-143, January.
- Chen, Yun-Shiow & Yang, Yit-Ming, 2002. "Economic design of -control charts with Weibull in-control times when there are multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 77(1), pages 17-23, May.
- M. A. Rahim & P. K. Banerjee, 1993. "A generalized model for the economic design of x̄control charts for production systems with increasing failure rate and early replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(6), pages 787-809, October.
- Hajaj Al-Oraini & M. A. Rahim, 2003. "Economic statistical design of x ¥ control charts for systems with gamma ( 5 ,2) in-control times," Journal of Applied Statistics, Taylor & Francis Journals, vol. 30(4), pages 397-409.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- M. Abolmohammadi & A. Seif & M. H. Behzadi & M. B. Moghadam, 2021. "Economic statistical design of adaptive $$\bar{X}$$ X ¯ control charts based on quality loss functions," Operational Research, Springer, vol. 21(2), pages 1041-1080, June.
- F L Chen & C H Yeh, 2011. "Economic statistical design for x-bar control charts under non-normal distributed data with Weibull in-control time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(4), pages 750-759, April.
- Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Ching-Hsin Wang & Feng-Chia Li, 2020. "Economic design under gamma shock model of the control chart for sustainable operations," Annals of Operations Research, Springer, vol. 290(1), pages 169-190, July.
- Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
- Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
- Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
- Panagiotidou, Sofia & Nenes, George, 2009. "An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart," Reliability Engineering and System Safety, Elsevier, vol. 94(3), pages 732-741.
- De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
- Ho, Linda Lee & Quinino, Roberto C., 2012. "Integrating on-line process control and imperfect corrective maintenance: An economical design," European Journal of Operational Research, Elsevier, vol. 222(2), pages 253-262.
- Deloux, E. & Castanier, B. & Bérenguer, C., 2009. "Predictive maintenance policy for a gradually deteriorating system subject to stress," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 418-431.
- Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
- Zhou, Wenhui & Zheng, Zhibin & Xie, Wei, 2017. "A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff," European Journal of Operational Research, Elsevier, vol. 261(2), pages 613-625.
- Yin, Hui & Zhang, Guojun & Zhu, Haiping & Deng, Yuhao & He, Fei, 2015. "An integrated model of statistical process control and maintenance based on the delayed monitoring," Reliability Engineering and System Safety, Elsevier, vol. 133(C), pages 323-333.
- Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2011. "Variable parameter and double sampling charts in the presence of correlation: The Markov chain approach," International Journal of Production Economics, Elsevier, vol. 130(2), pages 224-229, April.
- Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
- Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Hans Buhl & Maximilian Röglinger & Stefan Stöckl & Kathrin Braunwarth, 2011. "Value Orientation in Process Management," Business & Information Systems Engineering: The International Journal of WIRTSCHAFTSINFORMATIK, Springer;Gesellschaft für Informatik e.V. (GI), vol. 3(3), pages 163-172, June.
- Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
More about this item
Keywords
Non-normal distributed data; Imperfect maintenance; Truncated production cycle; Deteriorating process; Integrated hazard over sampling intervals;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:20:y:2020:i:4:d:10.1007_s12351-018-0424-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.