IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v182y2007i3p1251-1262.html
   My bibliography  Save this article

Hotelling's T2 charts with variable sample size and control limit

Author

Listed:
  • Chen, Yan-Kwang
  • Hsieh, Kun-Lin

Abstract

No abstract is available for this item.

Suggested Citation

  • Chen, Yan-Kwang & Hsieh, Kun-Lin, 2007. "Hotelling's T2 charts with variable sample size and control limit," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1251-1262, November.
  • Handle: RePEc:eee:ejores:v:182:y:2007:i:3:p:1251-1262
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00980-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. He, David & Grigoryan, Arsen, 2006. "Joint statistical design of double sampling and s charts," European Journal of Operational Research, Elsevier, vol. 168(1), pages 122-142, January.
    2. Chen, Yan-Kwang, 2004. "Economic design of control charts for non-normal data using variable sampling policy," International Journal of Production Economics, Elsevier, vol. 92(1), pages 61-74, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Haridy, Salah & Wu, Zhang & Lee, Ka Man & Bhuiyan, Nadia, 2013. "Optimal average sample number of the SPRT chart for monitoring fraction nonconforming," European Journal of Operational Research, Elsevier, vol. 229(2), pages 411-421.
    2. Asghar Seif & Alireza Faraz & C�dric Heuchenne & Erwin Saniga & M. B. Moghadam, 2011. "A modified economic-statistical design of the T-super-2 control chart with variable sample sizes and control limits," Journal of Applied Statistics, Taylor & Francis Journals, vol. 38(11), pages 2459-2469, January.
    3. Jose Ruiz-Tamayo & Jose Antonio Vazquez-Lopez & Edgar Augusto Ruelas-Santoyo & Aidee Hernandez-Lopez & Ismael Lopez-Juarez & Armando Javier Rios-Lira, 2021. "Multivariate Pattern Recognition in MSPC Using Bayesian Inference," Mathematics, MDPI, vol. 9(4), pages 1-18, February.
    4. Mitra, Amitava & Lee, Kang Bok & Chakraborti, Subhabrata, 2019. "An adaptive exponentially weighted moving average-type control chart to monitor the process mean," European Journal of Operational Research, Elsevier, vol. 279(3), pages 902-911.
    5. Lee, Pei-Hsi, 2011. "Adaptive R charts with variable parameters," Computational Statistics & Data Analysis, Elsevier, vol. 55(5), pages 2003-2010, May.
    6. Alireza Faraz & Giovanni Celano & Erwin Saniga & C. Heuchenne & S. Fichera, 2014. "The variable parameters T $$^{2}$$ 2 chart with run rules," Statistical Papers, Springer, vol. 55(4), pages 933-950, November.
    7. Leoni, Roberto Campos & Costa, Antonio Fernando Branco & Machado, Marcela Aparecida Guerreiro, 2015. "The effect of the autocorrelation on the performance of the T2 chart," European Journal of Operational Research, Elsevier, vol. 247(1), pages 155-165.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Iziy Azamsadat & Sadeghpour Gildeh Bahram & Monabbati Ehsan, 2017. "Comparison Between the Economic-Statistical Design of Double and Triple Sampling X¯\bar{X} Control Charts," Stochastics and Quality Control, De Gruyter, vol. 32(1), pages 49-61, June.
    2. Torng, Chau-Chen & Lee, Pei-Hsi & Liao, Nai-Yi, 2009. "An economic-statistical design of double sampling control chart," International Journal of Production Economics, Elsevier, vol. 120(2), pages 495-500, August.
    3. Naderkhani, Farnoosh & Makis, Viliam, 2016. "Economic design of multivariate Bayesian control chart with two sampling intervals," International Journal of Production Economics, Elsevier, vol. 174(C), pages 29-42.
    4. Lim, S.L. & Khoo, Michael B.C. & Teoh, W.L. & Xie, M., 2015. "Optimal designs of the variable sample size and sampling interval X¯ chart when process parameters are estimated," International Journal of Production Economics, Elsevier, vol. 166(C), pages 20-35.
    5. Liu, J.Y. & Xie, M. & Goh, T.N. & Liu, Q.H. & Yang, Z.H., 2006. "Cumulative count of conforming chart with variable sampling intervals," International Journal of Production Economics, Elsevier, vol. 101(2), pages 286-297, June.
    6. Xiao, Xiao & Jiang, Wei & Luo, Jianwen, 2019. "Combining process and product information for quality improvement," International Journal of Production Economics, Elsevier, vol. 207(C), pages 130-143.
    7. Chen, Yan-Kwang, 2007. "Adaptive sampling enhancement for Hotelling's T2 charts," European Journal of Operational Research, Elsevier, vol. 178(3), pages 841-857, May.
    8. Ho, Linda Lee & Trindade, Anderson Laécio Galindo, 2009. "Economic design of an X chart for short-run production," International Journal of Production Economics, Elsevier, vol. 120(2), pages 613-624, August.
    9. Machado, Marcela A.G. & Costa, Antonio F.B., 2008. "The double sampling and the EWMA charts based on the sample variances," International Journal of Production Economics, Elsevier, vol. 114(1), pages 134-148, July.
    10. Chen, Yan-Kwang & Hsieh, Kun-Lin & Chang, Cheng-Chang, 2007. "Economic design of the VSSI control charts for correlated data," International Journal of Production Economics, Elsevier, vol. 107(2), pages 528-539, June.
    11. De Magalhães, M.S. & Costa, A.F.B. & Moura Neto, F.D., 2009. "A hierarchy of adaptive control charts," International Journal of Production Economics, Elsevier, vol. 119(2), pages 271-283, June.
    12. Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
    13. Muhammad Riaz & Ronald Does, 2009. "A process variability control chart," Computational Statistics, Springer, vol. 24(2), pages 345-368, May.
    14. Lee, Pei-Hsi, 2013. "Joint statistical design of X¯ and s charts with combined double sampling and variable sampling interval," European Journal of Operational Research, Elsevier, vol. 225(2), pages 285-297.
    15. Mukherjee, Amitava & Sen, Rudra, 2018. "Optimal design of Shewhart–Lepage type schemes and its application in monitoring service quality," European Journal of Operational Research, Elsevier, vol. 266(1), pages 147-167.
    16. Yang, Yit-Ming & Su, Chia-Yi & Pearn, W.L., 2010. "Economic design of x¯-control charts for continuous flow process with multiple assignable causes," International Journal of Production Economics, Elsevier, vol. 128(1), pages 110-117, November.
    17. M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
    18. Wu, Zhang & Yang, Mei & Khoo, Michael B.C. & Yu, Fong-Jung, 2010. "Optimization designs and performance comparison of two CUSUM schemes for monitoring process shifts in mean and variance," European Journal of Operational Research, Elsevier, vol. 205(1), pages 136-150, August.
    19. Xurxo Rigueira & María Araújo & Javier Martínez & Paulino José García-Nieto & Iago Ocarranza, 2022. "Functional Data Analysis for the Detection of Outliers and Study of the Effects of the COVID-19 Pandemic on Air Quality: A Case Study in Gijón, Spain," Mathematics, MDPI, vol. 10(14), pages 1-27, July.
    20. Lee, Pei-Hsi & Torng, Chau-Chen & Liao, Li-Fang, 2012. "An economic design of combined double sampling and variable sampling interval X¯ control chart," International Journal of Production Economics, Elsevier, vol. 138(1), pages 102-106.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:182:y:2007:i:3:p:1251-1262. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.