Rework in relational engineer-to-order production systems: An ‘error-as-process’ archetype
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2024.109310
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2023. "Rearticulating supply chain design and operation principles to mitigate uncertainty in the Norwegian engineer-to-order shipbuilding sector," International Journal of Production Economics, Elsevier, vol. 262(C).
- Zhou, Yuxuan & Wang, Xun & Naim, Mohamed M. & Gosling, Jonathan, 2022. "A system dynamics archetype to mitigate rework effects in engineer-to-order supply chains," International Journal of Production Economics, Elsevier, vol. 250(C).
- Li, Lingjia & Shan, Shuo & Dai, Jing & Che, Wen & Shou, Yongyi, 2022. "The impact of green supply chain management on green innovation: A meta-analysis from the inter-organizational learning perspective," International Journal of Production Economics, Elsevier, vol. 250(C).
- Mahmoud Efatmaneshnik & Shraga Shoval, 2023. "Stochastic modelling of process scheduling for reduced rework cost and scrap," International Journal of Production Research, Taylor & Francis Journals, vol. 61(1), pages 219-237, January.
- Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
- Swapnil Bhalla & Erlend Alfnes & Hans-Henrik Hvolby, 2023. "Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review," International Journal of Production Research, Taylor & Francis Journals, vol. 61(7), pages 2339-2371, April.
- Gosling, Jonathan & Naim, Mohamed M., 2009. "Engineer-to-order supply chain management: A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 122(2), pages 741-754, December.
- John W. Gardner*, 2020. "Managing Production Yields and Rework through Feedback on Speed, Quality, and Quantity," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2182-2209, September.
- Anna-Maija Hietajärvi & Kirsi Aaltonen, 2018. "The formation of a collaborative project identity in an infrastructure alliance project," Construction Management and Economics, Taylor & Francis Journals, vol. 36(1), pages 1-21, January.
- Chen, Zhenzhen & Zhu, Wanshan & Crama, Pascale, 2023. "Subcontracting and rework cost sharing in engineering–procurement–construction projects," International Journal of Production Economics, Elsevier, vol. 262(C).
- P. E. D. Love & H. Li, 2000. "Overcoming the problems associated with quality certification," Construction Management and Economics, Taylor & Francis Journals, vol. 18(2), pages 139-149.
- Love, Peter E.D. & Matthews, Jane, 2020. "Quality, requisite imagination and resilience: Managing risk and uncertainty in construction," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Cannas, Violetta Giada & Gosling, Jonathan, 2021. "A decade of engineering-to-order (2010–2020): Progress and emerging themes," International Journal of Production Economics, Elsevier, vol. 241(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Seyoung Park & Eun Ryung Lee & Sungchul Lee & Geonwoo Kim, 2019. "Dantzig Type Optimization Method with Applications to Portfolio Selection," Sustainability, MDPI, vol. 11(11), pages 1-32, June.
- Pero, Margherita & Stößlein, Martin & Cigolini, Roberto, 2015. "Linking product modularity to supply chain integration in the construction and shipbuilding industries," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 602-615.
- Sofia Patsali, 2019. "Opening the black box of university-suppliers' co-invention: some field study evidence," Working Papers of BETA 2019-46, Bureau d'Economie Théorique et Appliquée, UDS, Strasbourg.
- Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
- Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
- Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
- Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
- W. Pearn & R. Su & M. Weng & C. Hsu, 2011. "Optimal production run time for two-stage production system with imperfect processes and allowable shortages," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 533-545, December.
- Varun Karamshetty & Harwin De Vries & Luk N. Van Wassenhove & Sarah Dewilde & Warnyta Minnaard & Dennis Ongarora & Kennedy Abuga & Prashant Yadav, 2022. "Inventory Management Practices in Private Healthcare Facilities in Nairobi County," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 828-846, February.
- Mitali Sarkar & Li Pan & Bikash Koli Dey & Biswajit Sarkar, 2020. "Does the Autonomation Policy Really Help in a Smart Production System for Controlling Defective Production?," Mathematics, MDPI, vol. 8(7), pages 1-21, July.
- Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
- Liu, Guoli & Li, Feng & Yang, Xianyan & Qiu, Shuang, 2020. "The multi-stage multi-product batch-sizing problem in the steel industry," Applied Mathematics and Computation, Elsevier, vol. 369(C).
- Dekkers, Rob & Chang, C.M. & Kreutzfeldt, Jochen, 2013. "The interface between “product design and engineering” and manufacturing: A review of the literature and empirical evidence," International Journal of Production Economics, Elsevier, vol. 144(1), pages 316-333.
- Zhang, Linda L., 2015. "A literature review on multitype platforming and framework for future research," International Journal of Production Economics, Elsevier, vol. 168(C), pages 1-12.
- Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
- XiaoLi Zhang & Jelle de Vries & René de Koster & ChenGuang Liu, 2022. "Fast and Faultless? Quantity and Quality Feedback in Order Picking," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1536-1559, April.
- Anand Gurumurthy & Gunjan Soni & Surya Prakash & Gaurav Kumar Badhotiya, 2013. "Review on Supply Chain Management Research—An Indian Perspective," IIM Kozhikode Society & Management Review, , vol. 2(1), pages 1-19, January.
- Oliveira, Gilson Adamczuk & Tan, Kim Hua & Guedes, Bruno Turmina, 2018. "Lean and green approach: An evaluation tool for new product development focused on small and medium enterprises," International Journal of Production Economics, Elsevier, vol. 205(C), pages 62-73.
- Gouiaa-Mtibaa, A. & Dellagi, S. & Achour, Z. & Erray, W., 2018. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 1-11.
- John Wiredu & Qian Yang & Agyemang Kwasi Sampene & Bright Akwasi Gyamfi & Simplice A. Asongu, 2024.
"The effect of green supply chain management practices on corporate environmental performance: Does supply chain competitive advantage matter?,"
Business Strategy and the Environment, Wiley Blackwell, vol. 33(3), pages 2578-2599, March.
- John Wiredu & Qian Yang & Agyemang Kwasi Sampene & Bright Akwasi Gyamfi & Simplice A. Asongu, 2023. "The effect of green supply chain management practices on corporate environmental performance. Does supply chain competitive advantage matter?," Working Papers 23/063, European Xtramile Centre of African Studies (EXCAS).
- John Wiredu & Qian Yang & Agyemang Kwasi Sampene & Bright Akwasi Gyamfi & Simplice A. Asongu, 2023. "The effect of green supply chain management practices on corporate environmental performance. Does supply chain competitive advantage matter?," Working Papers of the African Governance and Development Institute. 23/063, African Governance and Development Institute..
More about this item
Keywords
Alliance; Archetype; Error; Engineer-to-order; Infrastructure projects; Rework;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:274:y:2024:i:c:s0925527324001671. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.