Optimal production run time for two-stage production system with imperfect processes and allowable shortages
Author
Abstract
Suggested Citation
DOI: 10.1007/s10100-010-0143-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hill, Roger M., 2000. "On optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 66(2), pages 149-158, June.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
- Kim, DaeSoo, 1999. "Optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 58(3), pages 221-234, January.
- Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
- Darwish, M.A. & Ben-Daya, M., 2007. "Effect of inspection errors and preventive maintenance on a two-stage production inventory system," International Journal of Production Economics, Elsevier, vol. 107(1), pages 301-313, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rung-Hung Su & Ming-Wei Weng & Yung-Fu Huang, 2020. "Innovative maintenance problem in a two-stage production-inventory system with imperfect processes," Annals of Operations Research, Springer, vol. 287(1), pages 379-401, April.
- Chen, Cheng-Kang & Lo, Chih-Chung & Weng, Tzu-Chun, 2017. "Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period," European Journal of Operational Research, Elsevier, vol. 259(2), pages 401-412.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
- Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
- Darwish, M.A. & Ben-Daya, M., 2007. "Effect of inspection errors and preventive maintenance on a two-stage production inventory system," International Journal of Production Economics, Elsevier, vol. 107(1), pages 301-313, May.
- Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
- Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
- Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
- Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
- Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Chiu, Singa Wang & Liang, Gang-Ming & Chiu, Yuan-Shyi Peter & Chiu, Tiffany, 2019. "Production planning incorporating issues of reliability and backlogging with service level constraint," Operations Research Perspectives, Elsevier, vol. 6(C).
- Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
- Zequeira, Romulo I. & Valdes, Jose E. & Berenguer, Christophe, 2008. "Optimal buffer inventory and opportunistic preventive maintenance under random production capacity availability," International Journal of Production Economics, Elsevier, vol. 111(2), pages 686-696, February.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
- Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
More about this item
Keywords
Inventory; Imperfect production process; Quality improvement; Shortages; Two-stage system;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:19:y:2011:i:4:p:533-545. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.