IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v173y2018icp1-11.html
   My bibliography  Save this article

Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance

Author

Listed:
  • Gouiaa-Mtibaa, A.
  • Dellagi, S.
  • Achour, Z.
  • Erray, W.

Abstract

We consider a manufacturing system subject to an increasing random failure rate and producing conforming and non-conforming items. Two types of non-defective products are considered: high quality items noted first-rate products and substandard quality items noted second-rate products. Rework activities are proposed for second-rate and non-conforming products in order to improve their quality conditions and sell them at the best price. In order to slow down the degradation process of the manufacturing system and reduce its impact on the quality of output products, a new improved imperfect preventive maintenance (PM) policy with minimal repair at failures is established. It consists in performing a given number of imperfect PM actions before undertaking a perfect one. This study consists in developing an analytical model to determine simultaneously the optimal values of two decision variables: the number of produced batches before performing the imperfect PM, and the number of imperfect PM actions to undertake before applying a perfect one by maximizing the total expected profit taking into account the selling price and production, maintenance and reworking costs. Numerical examples and a sensitivity study are presented to illustrate the use of the proposed model and the obtained results.

Suggested Citation

  • Gouiaa-Mtibaa, A. & Dellagi, S. & Achour, Z. & Erray, W., 2018. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 1-11.
  • Handle: RePEc:eee:reensy:v:173:y:2018:i:c:p:1-11
    DOI: 10.1016/j.ress.2017.12.020
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832017306762
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2017.12.020?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ben Mabrouk, A. & Chelbi, A. & Radhoui, M., 2016. "Optimal imperfect maintenance strategy for leased equipment," International Journal of Production Economics, Elsevier, vol. 178(C), pages 57-64.
    2. Linderman, Kevin & McKone-Sweet, Kathleen E. & Anderson, John C., 2005. "An integrated systems approach to process control and maintenance," European Journal of Operational Research, Elsevier, vol. 164(2), pages 324-340, July.
    3. Shijin Wang, 2013. "Integrated model of production planning and imperfect preventive maintenance policy for single machine system," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 18(2), pages 140-156.
    4. Pham, Hoang & Wang, Hongzhou, 1996. "Imperfect maintenance," European Journal of Operational Research, Elsevier, vol. 94(3), pages 425-438, November.
    5. Chelbi, Anis & Ait-Kadi, Daoud, 2004. "Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance," European Journal of Operational Research, Elsevier, vol. 156(3), pages 712-718, August.
    6. Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
    7. Gabriella Budai & Rommert Dekker & Robin P. Nicolai, 2008. "Maintenance and Production: A Review of Planning Models," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 13, pages 321-344, Springer.
    8. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(1), pages 248-260, March.
    9. Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
    10. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    11. Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(2), pages 493-505, April.
    12. Robert Inman & Dennis Blumenfeld & Ningjian Huang & Jingshan Li & Jing Li, 2013. "Survey of recent advances on the interface between production system design and quality," IISE Transactions, Taylor & Francis Journals, vol. 45(6), pages 557-574.
    13. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    14. Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
    15. Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lin, Danping & Jin, Baoping & Chang, Daofang, 2020. "A PSO approach for the integrated maintenance model," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    2. Baishakhi Ganguly & Bikash Koli Dey & Sarla Pareek & Biswajit Sarkar, 2023. "Cost-Effective Imperfect Production-Inventory System under Variable Production Rate and Remanufacturing," Mathematics, MDPI, vol. 11(15), pages 1-24, August.
    3. Love, Peter E.D. & Matthews, Jane, 2020. "Quality, requisite imagination and resilience: Managing risk and uncertainty in construction," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    4. Basim S. O. Alsaedi, 2024. "A Sustainable Supply Chain Model with Variable Production Rate and Remanufacturing for Imperfect Production Inventory System under Learning in Fuzzy Environment," Mathematics, MDPI, vol. 12(18), pages 1-49, September.
    5. Boumallessa, Zeineb & Chouikhi, Houssam & Elleuch, Mounir & Bentaher, Hatem, 2023. "Modeling and optimizing the maintenance schedule using dynamic quality and machine condition monitors in an unreliable single production system," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
    6. Sinisterra, Wilfrido Quiñones & Cavalcante, Cristiano Alexandre Virgínio, 2020. "An integrated model of production scheduling and inspection planning for resumable jobs," International Journal of Production Economics, Elsevier, vol. 227(C).
    7. Raj Kumar Bachar & Shaktipada Bhuniya & Santanu Kumar Ghosh & Biswajit Sarkar, 2022. "Controllable Energy Consumption in a Sustainable Smart Manufacturing Model Considering Superior Service, Flexible Demand, and Partial Outsourcing," Mathematics, MDPI, vol. 10(23), pages 1-29, November.
    8. Rubén Jesús Pérez-López & Jesús Everardo Olguín Tiznado & María Mojarro Magaña & Claudia Camargo Wilson & Juan Andrés López Barreras & Jorge Luis García-Alcaraz, 2019. "Information Sharing with ICT in Production Systems and Operational Performance," Sustainability, MDPI, vol. 11(13), pages 1-18, July.
    9. Rasay, Hasan & Taghipour, Sharareh & Sharifi, Mani, 2022. "An integrated Maintenance and Statistical Process Control Model for a Deteriorating Production Process," Reliability Engineering and System Safety, Elsevier, vol. 228(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
    2. Liao, Gwo-Liang & Sheu, Shey-Huei, 2011. "Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 130(1), pages 118-124, March.
    3. B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
    4. Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    5. Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
    6. Chang Wook Kang & Misbah Ullah & Mitali Sarkar & Muhammad Omair & Biswajit Sarkar, 2019. "A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders," Mathematics, MDPI, vol. 7(5), pages 1-18, May.
    7. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
    8. Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
    9. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    10. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    11. Chen, Shan Huo & Chang, Shu Man, 2008. "Optimization of fuzzy production inventory model with unrepairable defective products," International Journal of Production Economics, Elsevier, vol. 113(2), pages 887-894, June.
    12. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    13. Sraboni Mandal & Danish Ali Khan, 2015. "Integrated inventory model with uniform demand for one vendor one customer," International Journal of Business Performance and Supply Chain Modelling, Inderscience Enterprises Ltd, vol. 7(1), pages 36-52.
    14. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    15. El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
    16. Amalesh Kumar Manna & Leopoldo Eduardo Cárdenas-Barrón & Jayanta Kumar Dey & Shyamal Kumar Mondal & Ali Akbar Shaikh & Armando Céspedes-Mota & Gerardo Treviño-Garza, 2022. "A Fuzzy Imperfect Production Inventory Model Based on Fuzzy Differential and Fuzzy Integral Method," JRFM, MDPI, vol. 15(6), pages 1-19, May.
    17. Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
    18. Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
    19. Alamri, Adel A. & Syntetos, Aris A., 2018. "Beyond LIFO and FIFO: Exploring an Allocation-In-Fraction-Out (AIFO) policy in a two-warehouse inventory model," International Journal of Production Economics, Elsevier, vol. 206(C), pages 33-45.
    20. Bikash Koli Dey & Hyesung Seok, 2024. "Intelligent inventory management with autonomation and service strategy," Journal of Intelligent Manufacturing, Springer, vol. 35(1), pages 307-330, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:173:y:2018:i:c:p:1-11. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.