IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v241y2021ics0925527321002504.html
   My bibliography  Save this article

A decade of engineering-to-order (2010–2020): Progress and emerging themes

Author

Listed:
  • Cannas, Violetta Giada
  • Gosling, Jonathan

Abstract

In 2009 a literature review on supply chain management in Engineer-to-Order (ETO) situations was published in the International Journal of Production Economics (Gosling and Naim, 2009). The paper has received more than 200 citations from over 100 international journals. The ETO body of knowledge has been particularly relevant to those seeking to mobilise operations and supply chain concepts within the context of complex innovative engineering work. These are all increasingly pressing concerns for many organisations in the contemporary global economy; hence, it is timely to revisit this body of knowledge. Consequently, this study performs a systematic review of the last decade (2010–2020) ETO studies to identify the major advances revealed and develop a future research agenda. The results show that literature, over the last decade, presented new emerging trends related to: (i) ETO definitions through conceptualisation of the engineering flows and integration of engineering/production flows via the two-dimensional decoupling point; (ii) strategies for decoupling positioning, supply chain integration, planning and control, uncertainty/risk management, industry 4.0, exploration of new business models and system design, design automation and engineering management in ETO situations; (iii) applicability of lean within ETO situations. Finally, the paper suggests guiding research questions in relation to linkages between different disciplinary areas, evaluation of the application of new technologies, guidance for managing transitions between decoupling configurations and understanding of the new servitisation trends in ETO situations. In conclusion, the study highlights four research challenges to address: positive science challenge, comparative research challenge, multidisciplinary research challenge, and prescriptive research challenge.

Suggested Citation

  • Cannas, Violetta Giada & Gosling, Jonathan, 2021. "A decade of engineering-to-order (2010–2020): Progress and emerging themes," International Journal of Production Economics, Elsevier, vol. 241(C).
  • Handle: RePEc:eee:proeco:v:241:y:2021:i:c:s0925527321002504
    DOI: 10.1016/j.ijpe.2021.108274
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527321002504
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2021.108274?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Noroozi, Sayeh & Wikner, Joakim, 2017. "Sales and operations planning in the process industry: A literature review," International Journal of Production Economics, Elsevier, vol. 188(C), pages 139-155.
    2. Weng, Jiahua & Mizoguchi, Shota & Akasaka, Shingo & Onari, Hisashi, 2020. "Smart manufacturing operating systems considering parts utilization for engineer-to-order production with make-to-stock parts," International Journal of Production Economics, Elsevier, vol. 220(C).
    3. Masae, Makusee & Glock, Christoph H. & Grosse, Eric H., 2020. "Order picker routing in warehouses: A systematic literature review," International Journal of Production Economics, Elsevier, vol. 224(C).
    4. Vijaya Dixit & Atanu Chaudhuri & Rajiv Kumar Srivastava, 2019. "Assessing value of customer involvement in engineered-to-order shipbuilding projects using fuzzy set and rough set theories," International Journal of Production Research, Taylor & Francis Journals, vol. 57(22), pages 6943-6962, November.
    5. Dekkers, Rob & Chang, C.M. & Kreutzfeldt, Jochen, 2013. "The interface between “product design and engineering” and manufacturing: A review of the literature and empirical evidence," International Journal of Production Economics, Elsevier, vol. 144(1), pages 316-333.
    6. Byeongseop Kim & Yongkuk Jeong & Jong Gye Shin, 2020. "Spatial arrangement using deep reinforcement learning to minimise rearrangement in ship block stockyards," International Journal of Production Research, Taylor & Francis Journals, vol. 58(16), pages 5062-5076, July.
    7. Helena Johnsson, 2013. "Production strategies for pre-engineering in house-building: exploring product development platforms," Construction Management and Economics, Taylor & Francis Journals, vol. 31(9), pages 941-958, September.
    8. Marcello Braglia & Roberto Gabbrielli & Leonardo Marrazzini, 2019. "Overall Task Effectiveness: a new Lean performance indicator in engineer-to-order environment," International Journal of Productivity and Performance Management, Emerald Group Publishing Limited, vol. 68(2), pages 407-422, January.
    9. Pereira, Daniel Filipe & Oliveira, José Fernando & Carravilla, Maria Antónia, 2020. "Tactical sales and operations planning: A holistic framework and a literature review of decision-making models," International Journal of Production Economics, Elsevier, vol. 228(C).
    10. Schoenwitz, Manuel & Potter, Andrew & Gosling, Jonathan & Naim, Mohamed, 2017. "Product, process and customer preference alignment in prefabricated house building," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 79-90.
    11. Sebastian Poeschl & Frank Wirth & Thomas Bauernhansl, 2019. "Strategic process planning for commissioning processes in mechanical engineering," International Journal of Production Research, Taylor & Francis Journals, vol. 57(21), pages 6727-6739, November.
    12. Pero, Margherita & Stößlein, Martin & Cigolini, Roberto, 2015. "Linking product modularity to supply chain integration in the construction and shipbuilding industries," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 602-615.
    13. Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2019. "Engineering and production decoupling configurations: An empirical study in the machinery industry," International Journal of Production Economics, Elsevier, vol. 216(C), pages 173-189.
    14. Gustav Jansson & Helena Johnsson & Dan Engstr�m, 2014. "Platform use in systems building," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 70-82, February.
    15. Ilenia Zennaro & Serena Finco & Daria Battini & Alessandro Persona, 2019. "Big size highly customised product manufacturing systems: a literature review and future research agenda," International Journal of Production Research, Taylor & Francis Journals, vol. 57(15-16), pages 5362-5385, August.
    16. Xianhai Meng, 2019. "Lean management in the context of construction supply chains," International Journal of Production Research, Taylor & Francis Journals, vol. 57(11), pages 3784-3798, June.
    17. Hicks, C. & McGovern, T. & Earl, C. F., 2000. "Supply chain management: A strategic issue in engineer to order manufacturing," International Journal of Production Economics, Elsevier, vol. 65(2), pages 179-190, April.
    18. Mojtaba Bozorgmehr & Leila Tavakoli, 2015. "An EFQM-based supplier evaluation and verification methodology based on product's manufacturing policy and technology intensity: industrial gas turbine industry as a case study," International Journal of Integrated Supply Management, Inderscience Enterprises Ltd, vol. 9(4), pages 276-306.
    19. Oliveira, Gilson Adamczuk & Tan, Kim Hua & Guedes, Bruno Turmina, 2018. "Lean and green approach: An evaluation tool for new product development focused on small and medium enterprises," International Journal of Production Economics, Elsevier, vol. 205(C), pages 62-73.
    20. Ningshuang Zeng & Yan Liu & Chao Mao & Markus König, 2018. "Investigating the Relationship between Construction Supply Chain Integration and Sustainable Use of Material: Evidence from China," Sustainability, MDPI, vol. 10(10), pages 1-17, October.
    21. Gosling, Jonathan & Naim, Mohamed M., 2009. "Engineer-to-order supply chain management: A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 122(2), pages 741-754, December.
    22. Iain Reid & David Bamford & Hossam Ismail, 2019. "Reconciling engineer-to-order uncertainty by supporting front-end decision-making," International Journal of Production Research, Taylor & Francis Journals, vol. 57(21), pages 6856-6874, November.
    23. Ng, Irene & Scharf, Kimberley & Pogrebna, Ganna & Maull, Roger, 2015. "Contextual variety, Internet-of-Things and the choice of tailoring over platform: Mass customisation strategy in supply chain management," International Journal of Production Economics, Elsevier, vol. 159(C), pages 76-87.
    24. Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
    25. Sara Markworth Johnsen & Lars Hvam, 2019. "Understanding the impact of non-standard customisations in an engineer-to-order context: A case study," International Journal of Production Research, Taylor & Francis Journals, vol. 57(21), pages 6780-6794, November.
    26. Marcello Braglia & Marco Frosolini & Mosè Gallo & Leonardo Marrazzini, 2019. "Lean manufacturing tool in engineer-to-order environment: Project cost deployment," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1825-1839, March.
    27. Lin, J. & Naim, M.M. & Purvis, L. & Gosling, J., 2017. "The extension and exploitation of the inventory and order based production control system archetype from 1982 to 2015," International Journal of Production Economics, Elsevier, vol. 194(C), pages 135-152.
    28. Godinho Filho, Moacir & Marchesini, Antonio Gilberto & Riezebos, Jan & Vandaele, Nico & Ganga, Gilberto Miller Devós, 2017. "The application of Quick Response Manufacturing practices in Brazil, Europe, and the USA: An exploratory study," International Journal of Production Economics, Elsevier, vol. 193(C), pages 437-448.
    29. Ben Naylor, J. & Naim, Mohamed M & Berry, Danny, 1999. "Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain," International Journal of Production Economics, Elsevier, vol. 62(1-2), pages 107-118, May.
    30. Cátia Barbosa & Américo Azevedo, 2018. "Hybrid modelling of MTO/ETO manufacturing environments for performance assessment," International Journal of Production Research, Taylor & Francis Journals, vol. 56(15), pages 5147-5171, August.
    31. Natalia Iakymenko & Anita Romsdal & Erlend Alfnes & Marco Semini & Jan Ola Strandhagen, 2020. "Status of engineering change management in the engineer-to-order production environment: insights from a multiple case study," International Journal of Production Research, Taylor & Francis Journals, vol. 58(15), pages 4506-4528, July.
    32. Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
    33. Manuel Schoenwitz & Mohamed Naim & Andrew Potter, 2012. "The nature of choice in mass customized house building," Construction Management and Economics, Taylor & Francis Journals, vol. 30(3), pages 203-219, February.
    34. Jonathan Gosling & Mohamed Naim & Denis Towill & Wessam Abouarghoub & Brian Moone, 2015. "Supplier development initiatives and their impact on the consistency of project performance," Construction Management and Economics, Taylor & Francis Journals, vol. 33(5-6), pages 390-403, June.
    35. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2016. "Tactical capacity planning in a real-world ETO industry case: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 180(C), pages 158-171.
    36. Cátia Barbosa & Américo Azevedo, 2019. "Assessing the impact of performance determinants in complex MTO/ETO supply chains through an extended hybrid modelling approach," International Journal of Production Research, Taylor & Francis Journals, vol. 57(11), pages 3577-3597, June.
    37. Shen, Houcai & Pang, Zhan & Cheng, T.C.E., 2011. "The component procurement problem for the loss-averse manufacturer with spot purchase," International Journal of Production Economics, Elsevier, vol. 132(1), pages 146-153, July.
    38. Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
    39. Olhager, Jan, 2003. "Strategic positioning of the order penetration point," International Journal of Production Economics, Elsevier, vol. 85(3), pages 319-329, September.
    40. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
    41. Risto Silvola & Arto Tolonen & Janne Harkonen & Harri Haapasalo & Tarja Mannisto, 2019. "Defining one product data for a product," International Journal of Business Information Systems, Inderscience Enterprises Ltd, vol. 30(4), pages 489-520.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2019. "Engineering and production decoupling configurations: An empirical study in the machinery industry," International Journal of Production Economics, Elsevier, vol. 216(C), pages 173-189.
    2. Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
    3. Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2022. "A model for advanced planning systems dedicated to the Engineer-To-Order context," International Journal of Production Economics, Elsevier, vol. 252(C).
    4. Brachmann, Robert & Kolisch, Rainer, 2021. "The impact of flexibility on engineer-to-order production planning," International Journal of Production Economics, Elsevier, vol. 239(C).
    5. Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2021. "Exploring systemic factors creating uncertainty in complex engineer-to-order supply chains: Case studies from Norwegian shipbuilding first tier suppliers," International Journal of Production Economics, Elsevier, vol. 240(C).
    6. Schoenwitz, Manuel & Potter, Andrew & Gosling, Jonathan & Naim, Mohamed, 2017. "Product, process and customer preference alignment in prefabricated house building," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 79-90.
    7. Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2024. "Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm," International Journal of Production Economics, Elsevier, vol. 267(C).
    8. Pero, Margherita & Stößlein, Martin & Cigolini, Roberto, 2015. "Linking product modularity to supply chain integration in the construction and shipbuilding industries," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 602-615.
    9. Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
    10. Zhou, Yuxuan & Wang, Xun & Naim, Mohamed M. & Gosling, Jonathan, 2022. "A system dynamics archetype to mitigate rework effects in engineer-to-order supply chains," International Journal of Production Economics, Elsevier, vol. 250(C).
    11. Gosling, Jonathan & Naim, Mohamed M., 2009. "Engineer-to-order supply chain management: A literature review and research agenda," International Journal of Production Economics, Elsevier, vol. 122(2), pages 741-754, December.
    12. Fernanda Saidelles Bataglin & Daniela Dietz Viana & Carlos Torres Formoso, 2022. "Design Principles and Prescriptions for Planning and Controlling Engineer-to-Order Industrialized Building Systems," Sustainability, MDPI, vol. 14(24), pages 1-22, December.
    13. Unai Apaolaza & Aitor Orue & Aitor Lizarralde & Aitor Oyarbide-Zubillaga, 2022. "Competitive Improvement through Integrated Management of Sales and Operations," Sustainability, MDPI, vol. 14(5), pages 1-18, February.
    14. Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
    15. Linda Zhang & Sara Shafiee, 2022. "Developing separate or integrated configurators? A longitudinal case study," Post-Print hal-03707380, HAL.
    16. Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
    17. Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
    18. Gláucya Daú & Annibal Scavarda & Luiz Felipe Scavarda & Vivianne Julianelli Taveira Portugal, 2019. "The Healthcare Sustainable Supply Chain 4.0: The Circular Economy Transition Conceptual Framework with the Corporate Social Responsibility Mirror," Sustainability, MDPI, vol. 11(12), pages 1-19, June.
    19. Marcelo Xavier Seeling & Tobias Kreuter & Luiz Felipe Scavarda & Antônio Márcio Tavares Thomé & Bernd Hellingrath, 2021. "Global sales and operations planning: A multinational manufacturing company perspective," PLOS ONE, Public Library of Science, vol. 16(9), pages 1-22, September.
    20. Dekkers, Rob & Chang, C.M. & Kreutzfeldt, Jochen, 2013. "The interface between “product design and engineering” and manufacturing: A review of the literature and empirical evidence," International Journal of Production Economics, Elsevier, vol. 144(1), pages 316-333.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:241:y:2021:i:c:s0925527321002504. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.