Case study on delivery time determination using a machine learning approach in small batch production companies
Author
Abstract
Suggested Citation
DOI: 10.1007/s10845-023-02290-2
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ralph Richter & Marius Syberg & Jochen Deuse & Peter Willats & David Lenze, 2023. "Creating lean value streams through proactive variability management," International Journal of Production Research, Taylor & Francis Journals, vol. 61(16), pages 5692-5703, August.
- Adam, Nabil R. & Bertrand, J. Will M. & Morehead, Diane C. & Surkis, Julius, 1993. "Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops," European Journal of Operational Research, Elsevier, vol. 68(2), pages 212-227, July.
- Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2021. "Exploring systemic factors creating uncertainty in complex engineer-to-order supply chains: Case studies from Norwegian shipbuilding first tier suppliers," International Journal of Production Economics, Elsevier, vol. 240(C).
- Andrius Vabalas & Emma Gowen & Ellen Poliakoff & Alexander J Casson, 2019. "Machine learning algorithm validation with a limited sample size," PLOS ONE, Public Library of Science, vol. 14(11), pages 1-20, November.
- Constantin Waubert de Puiseau & Richard Meyes & Tobias Meisen, 2022. "On reliability of reinforcement learning based production scheduling systems: a comparative survey," Journal of Intelligent Manufacturing, Springer, vol. 33(4), pages 911-927, April.
- Swapnil Bhalla & Erlend Alfnes & Hans-Henrik Hvolby, 2023. "Tools and practices for tactical delivery date setting in engineer-to-order environments: a systematic literature review," International Journal of Production Research, Taylor & Francis Journals, vol. 61(7), pages 2339-2371, April.
- Marcello Braglia & Marco Frosolini & Mosè Gallo & Leonardo Marrazzini, 2019. "Lean manufacturing tool in engineer-to-order environment: Project cost deployment," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1825-1839, March.
- Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
- Olhager, Jan, 2003. "Strategic positioning of the order penetration point," International Journal of Production Economics, Elsevier, vol. 85(3), pages 319-329, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Alexandre Dolgui & Hichem Haddou Benderbal & Fabio Sgarbossa & Simon Thevenin, 2024. "Editorial for the special issue: AI and data-driven decisions in manufacturing," Journal of Intelligent Manufacturing, Springer, vol. 35(8), pages 3599-3604, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cannas, Violetta Giada & Gosling, Jonathan, 2021. "A decade of engineering-to-order (2010–2020): Progress and emerging themes," International Journal of Production Economics, Elsevier, vol. 241(C).
- Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2022. "A model for advanced planning systems dedicated to the Engineer-To-Order context," International Journal of Production Economics, Elsevier, vol. 252(C).
- Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2023. "Rearticulating supply chain design and operation principles to mitigate uncertainty in the Norwegian engineer-to-order shipbuilding sector," International Journal of Production Economics, Elsevier, vol. 262(C).
- Ephrem Habyarimana & Faheem S Baloch, 2021. "Machine learning models based on remote and proximal sensing as potential methods for in-season biomass yields prediction in commercial sorghum fields," PLOS ONE, Public Library of Science, vol. 16(3), pages 1-23, March.
- Jammernegg, Werner & Reiner, Gerald, 2007. "Performance improvement of supply chain processes by coordinated inventory and capacity management," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 183-190, July.
- Zbysław Dobrowolski & Grzegorz Drozdowski & Józef Ledzianowski, 2021. "The Competency Niche: An Exploratory Study," Risks, MDPI, vol. 9(11), pages 1-11, October.
- Hoogstra-Klein, Marjanke A. & Meijboom, Kars, 2021. "A qualitative exploration of the wood product supply chain – investigating the possibilities and desirability of an increased demand orientation," Forest Policy and Economics, Elsevier, vol. 133(C).
- Ivanov, Dmitry & Sokolov, Boris, 2013. "Control and system-theoretic identification of the supply chain dynamics domain for planning, analysis and adaptation of performance under uncertainty," European Journal of Operational Research, Elsevier, vol. 224(2), pages 313-323.
- Leandro C. Hermida & E. Michael Gertz & Eytan Ruppin, 2022. "Predicting cancer prognosis and drug response from the tumor microbiome," Nature Communications, Nature, vol. 13(1), pages 1-15, December.
- Jonathan C. M. Wan & Dennis Stephens & Lingqi Luo & James R. White & Caitlin M. Stewart & Benoît Rousseau & Dana W. Y. Tsui & Luis A. Diaz, 2022. "Genome-wide mutational signatures in low-coverage whole genome sequencing of cell-free DNA," Nature Communications, Nature, vol. 13(1), pages 1-12, December.
- Guertler, Benjamin & Spinler, Stefan, 2015. "When does operational risk cause supply chain enterprises to tip? A simulation of intra-organizational dynamics," Omega, Elsevier, vol. 57(PA), pages 54-69.
- Sinha, Shruti & Sankar Rao, Chinta & Kumar, Abhishankar & Venkata Surya, Dadi & Basak, Tanmay, 2024. "Exploring and understanding the microwave-assisted pyrolysis of waste lignocellulose biomass using gradient boosting regression machine learning model," Renewable Energy, Elsevier, vol. 231(C).
- repec:dau:papers:123456789/487 is not listed on IDEAS
- Jan Holmström & Matthias Holweg & Siavash H. Khajavi & Jouni Partanen, 2016. "The direct digital manufacturing (r)evolution: definition of a research agenda," Operations Management Research, Springer, vol. 9(1), pages 1-10, June.
- Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
- Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
- Mihiotis A., 2014. "Management of Supply Chain: X-to-order Concepts vs Make-to-stock Model," International Journal of Business Administration, International Journal of Business Administration, Sciedu Press, vol. 5(3), pages 30-33, May.
- Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
- Helia Yousefnejad & Maryam Esmaeili, 2020. "Tactical production planning in a hybrid MTS/MTO system using Stackelberg game," Operational Research, Springer, vol. 20(3), pages 1791-1809, September.
- Welker, Gera A. & van der Vaart, Taco & Pieter van Donk, Dirk, 2008. "The influence of business conditions on supply chain information-sharing mechanisms: A study among supply chain links of SMEs," International Journal of Production Economics, Elsevier, vol. 113(2), pages 706-720, June.
- Rameshwar Dubey & Saurabh Tiwari, 2010. "Modeling A Global Supply Chain For A Two-Wheeler Manufacturer," Portuguese Journal of Management Studies, ISEG, Universidade de Lisboa, vol. 0(3), pages 331-350.
More about this item
Keywords
Delivery time; Machine learning; Production planning and control; Artificial intelligence; Case study;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:35:y:2024:i:8:d:10.1007_s10845-023-02290-2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.