A model for advanced planning systems dedicated to the Engineer-To-Order context
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2022.108557
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2021. "Exploring systemic factors creating uncertainty in complex engineer-to-order supply chains: Case studies from Norwegian shipbuilding first tier suppliers," International Journal of Production Economics, Elsevier, vol. 240(C).
- Ilenia Zennaro & Serena Finco & Daria Battini & Alessandro Persona, 2019. "Big size highly customised product manufacturing systems: a literature review and future research agenda," International Journal of Production Research, Taylor & Francis Journals, vol. 57(15-16), pages 5362-5385, August.
- Sara Markworth Johnsen & Lars Hvam, 2019. "Understanding the impact of non-standard customisations in an engineer-to-order context: A case study," International Journal of Production Research, Taylor & Francis Journals, vol. 57(21), pages 6780-6794, November.
- Bertrand, J. W. M. & Muntslag, D. R., 1993. "Production control in engineer-to-order firms," International Journal of Production Economics, Elsevier, vol. 30(1), pages 3-22, July.
- Georges Baydoun & Alain Haït & Robert Pellerin & Bernard Clément & Guillaume Bouvignies, 2016. "A rough-cut capacity planning model with overlapping," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(2), pages 335-364, March.
- Luh, Peter B. & Liu, Feng & Moser, Bryan, 1999. "Scheduling of design projects with uncertain number of iterations," European Journal of Operational Research, Elsevier, vol. 113(3), pages 575-592, March.
- Cannas, Violetta G. & Gosling, Jonathan & Pero, Margherita & Rossi, Tommaso, 2020. "Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry," International Journal of Production Economics, Elsevier, vol. 228(C).
- Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2016. "Tactical capacity planning in a real-world ETO industry case: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 180(C), pages 158-171.
- Pellerin, Robert & Perrier, Nathalie & Berthaut, François, 2020. "A survey of hybrid metaheuristics for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 280(2), pages 395-416.
- Vaagen, Hajnalka & Kaut, Michal & Wallace, Stein W., 2017. "The impact of design uncertainty in engineer-to-order project planning," European Journal of Operational Research, Elsevier, vol. 261(3), pages 1098-1109.
- Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2024. "Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm," International Journal of Production Economics, Elsevier, vol. 267(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2024. "Integrated planning and scheduling of engineer-to-order projects using a Lamarckian Layered Genetic Algorithm," International Journal of Production Economics, Elsevier, vol. 267(C).
- Cannas, Violetta Giada & Gosling, Jonathan, 2021. "A decade of engineering-to-order (2010–2020): Progress and emerging themes," International Journal of Production Economics, Elsevier, vol. 241(C).
- Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2023. "Rearticulating supply chain design and operation principles to mitigate uncertainty in the Norwegian engineer-to-order shipbuilding sector," International Journal of Production Economics, Elsevier, vol. 262(C).
- Centobelli, Piera & Cerchione, Roberto & Maglietta, Amedeo & Oropallo, Eugenio, 2023. "Sailing through a digital and resilient shipbuilding supply chain: An empirical investigation," Journal of Business Research, Elsevier, vol. 158(C).
- Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
- Gláucya Daú & Annibal Scavarda & Luiz Felipe Scavarda & Vivianne Julianelli Taveira Portugal, 2019. "The Healthcare Sustainable Supply Chain 4.0: The Circular Economy Transition Conceptual Framework with the Corporate Social Responsibility Mirror," Sustainability, MDPI, vol. 11(12), pages 1-19, June.
- Fernanda Saidelles Bataglin & Daniela Dietz Viana & Carlos Torres Formoso, 2022. "Design Principles and Prescriptions for Planning and Controlling Engineer-to-Order Industrialized Building Systems," Sustainability, MDPI, vol. 14(24), pages 1-22, December.
- Alexander Rokoss & Marius Syberg & Laura Tomidei & Christian Hülsing & Jochen Deuse & Matthias Schmidt, 2024. "Case study on delivery time determination using a machine learning approach in small batch production companies," Journal of Intelligent Manufacturing, Springer, vol. 35(8), pages 3937-3958, December.
- Kaut, Michal & Vaagen, Hajnalka & Wallace, Stein W., 2021. "The combined impact of stochastic and correlated activity durations and design uncertainty on project plans," International Journal of Production Economics, Elsevier, vol. 233(C).
- Brachmann, Robert & Kolisch, Rainer, 2021. "The impact of flexibility on engineer-to-order production planning," International Journal of Production Economics, Elsevier, vol. 239(C).
- Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.
- Daniela D. Viana & Iris D. Tommelein & Carlos T. Formoso, 2017. "Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization," Energies, MDPI, vol. 10(10), pages 1-17, October.
- Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
- Camur, Mustafa C. & Sharkey, Thomas C. & Vogiatzis, Chrysafis, 2023. "The stochastic pseudo-star degree centrality problem," European Journal of Operational Research, Elsevier, vol. 308(2), pages 525-539.
- Junlong Peng & Mengyao Wang & Chao Peng & Ke Hu, 2022. "Research on extremely short construction period of engineering project based on labor balance under resource tolerance," PLOS ONE, Public Library of Science, vol. 17(3), pages 1-18, March.
- Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
- Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
- Rahman Torba & Stéphane Dauzère-Pérès & Claude Yugma & Cédric Gallais & Juliette Pouzet, 2024. "Solving a real-life multi-skill resource-constrained multi-project scheduling problem," Annals of Operations Research, Springer, vol. 338(1), pages 69-114, July.
- Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
- Xabier A. Martin & Rosa Herrero & Angel A. Juan & Javier Panadero, 2024. "An Agile Adaptive Biased-Randomized Discrete-Event Heuristic for the Resource-Constrained Project Scheduling Problem," Mathematics, MDPI, vol. 12(12), pages 1-21, June.
More about this item
Keywords
Engineer to order; ETO; Integrated planning and scheduling; Design uncertainty; Concurrent engineering;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:252:y:2022:i:c:s0925527322001505. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.