Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2015.07.030
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
- Karmarkar, Uday S. & Kekre, Sham & Kekre, Sunder, 1992. "Multi-item batching heuristics for minimization of queueing delays," European Journal of Operational Research, Elsevier, vol. 58(1), pages 99-111, April.
- Ward Whitt, 1982. "Approximating a Point Process by a Renewal Process, I: Two Basic Methods," Operations Research, INFORMS, vol. 30(1), pages 125-147, February.
- J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
- Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
- Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
- Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
- Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
- Candace Arai Yano, 1987. "Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs," Management Science, INFORMS, vol. 33(1), pages 95-106, January.
- Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Karumbathil Rasmi & Machuveettil Joseph Jacob & Alexander S. Rumyantsev & Achyutha Krishnamoorthy, 2021. "A Multi-Server Heterogeneous Queuing-Inventory System with Class-Dependent Inventory Access," Mathematics, MDPI, vol. 9(9), pages 1-23, May.
- Hnaien, Faicel & Afsar, Hasan Murat, 2017. "Robust single-item lot-sizing problems with discrete-scenario lead time," International Journal of Production Economics, Elsevier, vol. 185(C), pages 223-229.
- Tanja Mlinar & Philippe Chevalier, 2016.
"Pooling heterogeneous products for manufacturing environments,"
4OR, Springer, vol. 14(2), pages 173-200, June.
- MLINAR, Tanja & CHEVALIER, Philippe, 2016. "Pooling Heterogeneous Products for Manufacturing Environments," LIDAM Reprints CORE 2744, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
- Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- Yajaira Cardona-Valdés & Samuel Nucamendi-Guillén & Rodrigo E. Peimbert-García & Gustavo Macedo-Barragán & Eduardo Díaz-Medina, 2020. "A New Formulation for the Capacitated Lot Sizing Problem with Batch Ordering Allowing Shortages," Mathematics, MDPI, vol. 8(6), pages 1-16, June.
- Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
- Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
- Süral, Haldun & Denizel, Meltem & Van Wassenhove, Luk N., 2009. "Lagrangean relaxation based heuristics for lot sizing with setup times," European Journal of Operational Research, Elsevier, vol. 194(1), pages 51-63, April.
- Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
- Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
- Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
- Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
- Helber, Stefan & Sahling, Florian, 2010.
"A fix-and-optimize approach for the multi-level capacitated lot sizing problem,"
International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
- Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Milne, R. John & Mahapatra, Santosh & Wang, Chi-Tai, 2015. "Optimizing planned lead times for enhancing performance of MRP systems," International Journal of Production Economics, Elsevier, vol. 167(C), pages 220-231.
- Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
- Klaus Altendorfer & Thomas Felberbauer & Herbert Jodlbauer, 2018. "Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand," Papers 1812.00773, arXiv.org.
- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
- Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
More about this item
Keywords
Lot sizing; Planned lead time; Random required lead times; MTS production; Stochastic modeling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:478-488. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.