IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v190y2008i1p136-155.html
   My bibliography  Save this article

On the tradeoff between optimal order-base-stock levels and demand lead-times

Author

Listed:
  • Liberopoulos, George

Abstract

We investigate the tradeoff between finished-goods inventory and advance demand information for a model of a single-stage make-to-stock supplier who uses an order-base-stock replenishment policy to meet customer orders that arrive a fixed demand lead-time in advance of their due-dates. We show that if the replenishment orders arrive in the order that they are placed, then the tradeoff between the optimal order-base-stock level and the demand lead-time is "exhaustive", in the sense that the optimal order-base-stock level drops all the way to zero if the demand lead-time is sufficiently long. We then provide a sufficient condition under which this tradeoff is linear. We verify that this condition is satisfied for the case where the supply process is modeled as an M/M/1 queue. We also show that the tradeoff between the optimal order-base-stock level and the demand lead-time is linear for the case where the supply process is modeled as an M/D/1 queue. More specifically, for this case, we show that the optimal order-base-stock level decreases by one unit if the demand lead-time increases by an amount equal to the supplier's constant processing time. Finally, we show that the tradeoff between the optimal order-base-stock level and the demand lead-time is exhaustive but not linear in the case where the supply process is modeled as an M/D/[infinity] queue. We illustrate these results with a numerical example.

Suggested Citation

  • Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
  • Handle: RePEc:eee:ejores:v:190:y:2008:i:1:p:136-155
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00554-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    2. Tan, Tarkan & Gullu, Refik & Erkip, Nesim, 2007. "Modelling imperfect advance demand information and analysis of optimal inventory policies," European Journal of Operational Research, Elsevier, vol. 177(2), pages 897-923, March.
    3. Xinxin Hu & Izak Duenyas (Advisor) & Roman Kapuscinski (Advisor), 2003. "Advance Demand Information and Safety Capacity as a Hedge Against Demand and Capacity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 55-58.
    4. Wijngaard, J., 2004. "The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case," European Journal of Operational Research, Elsevier, vol. 159(1), pages 95-109, November.
    5. Özalp Özer, 2003. "Replenishment Strategies for Distribution Systems Under Advance Demand Information," Management Science, INFORMS, vol. 49(3), pages 255-272, March.
    6. Bourland, Karla E. & Powell, Stephen G. & Pyke, David F., 1996. "Exploiting timely demand information to reduce inventories," European Journal of Operational Research, Elsevier, vol. 92(2), pages 239-253, July.
    7. Özalp Özer & Wei Wei, 2004. "Inventory Control with Limited Capacity and Advance Demand Information," Operations Research, INFORMS, vol. 52(6), pages 988-1000, December.
    8. Fangruo Chen, 2001. "Market Segmentation, Advanced Demand Information, and Supply Chain Performance," Manufacturing & Service Operations Management, INFORMS, vol. 3(1), pages 53-67, February.
    9. L. Beril Toktay & Lawrence M. Wein, 2001. "Analysis of a Forecasting-Production-Inventory System with Stationary Demand," Management Science, INFORMS, vol. 47(9), pages 1268-1281, September.
    10. J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
    11. Rema Hariharan & Paul Zipkin, 1995. "Customer-Order Information, Leadtimes, and Inventories," Management Science, INFORMS, vol. 41(10), pages 1599-1607, October.
    12. Guillermo Gallego & Özalp Özer, 2001. "Integrating Replenishment Decisions with Advance Demand Information," Management Science, INFORMS, vol. 47(10), pages 1344-1360, October.
    13. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    14. Johan Marklund, 2006. "Controlling Inventories in Divergent Supply Chains with Advance-Order Information," Operations Research, INFORMS, vol. 54(5), pages 988-1010, October.
    15. DeCroix, Gregory A. & Mookerjee, Vijay S., 1997. "Purchasing demand information in a stochastic-demand inventory system," European Journal of Operational Research, Elsevier, vol. 102(1), pages 36-57, October.
    16. Fikri Karaesmen & George Liberopoulos & Yves Dallery, 2004. "The Value of Advance Demand Information in Production/Inventory Systems," Annals of Operations Research, Springer, vol. 126(1), pages 135-157, February.
    17. Guillermo Gallego & Özalp Özer, 2003. "Optimal Replenishment Policies for Multiechelon Inventory Problems Under Advance Demand Information," Manufacturing & Service Operations Management, INFORMS, vol. 5(2), pages 157-175, February.
    18. van Donselaar, Karel & Rock Kopczak, Laura & Wouters, Marc, 2001. "The use of advance demand information in a project-based supply chain," European Journal of Operational Research, Elsevier, vol. 130(3), pages 519-538, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Altendorfer, Klaus & Minner, Stefan, 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates," European Journal of Operational Research, Elsevier, vol. 213(1), pages 134-146, August.
    2. Iida, Tetsuo, 2015. "Benefits of leadtime information and of its combination with demand forecast information," International Journal of Production Economics, Elsevier, vol. 163(C), pages 146-156.
    3. Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
    4. Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
    2. Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
    3. Alım, Muzaffer & Beullens, Patrick, 2022. "Improving inventory system performance by selective purchasing of buyers’ willingness to wait," European Journal of Operational Research, Elsevier, vol. 300(1), pages 124-136.
    4. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    5. Alexandar Angelus & Özalp Özer, 2016. "Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information," Operations Research, INFORMS, vol. 64(6), pages 1338-1371, December.
    6. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    7. Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
    8. Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
    9. Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
    10. Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020. "Spare parts inventory control based on maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    11. Iida, Tetsuo, 2015. "Benefits of leadtime information and of its combination with demand forecast information," International Journal of Production Economics, Elsevier, vol. 163(C), pages 146-156.
    12. Kaijie Zhu & Ulrich W. Thonemann, 2004. "Modeling the Benefits of Sharing Future Demand Information," Operations Research, INFORMS, vol. 52(1), pages 136-147, February.
    13. Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
    14. Long Gao & Susan H. Xu & Michael O. Ball, 2012. "Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast," Management Science, INFORMS, vol. 58(4), pages 770-790, April.
    15. Tang, Dong, 2011. "Managing finished-goods inventory under capacitated delayed differentiation," Omega, Elsevier, vol. 39(5), pages 481-492, October.
    16. Tan, Tarkan & Güllü, Refik & Erkip, Nesim, 2009. "Using imperfect advance demand information in ordering and rationing decisions," International Journal of Production Economics, Elsevier, vol. 121(2), pages 665-677, October.
    17. Felix Papier & Ulrich W. Thonemann, 2010. "Capacity Rationing in Stochastic Rental Systems with Advance Demand Information," Operations Research, INFORMS, vol. 58(2), pages 274-288, April.
    18. Kogan, Konstantin & Herbon, Avi, 2008. "Production under periodic demand update prior to a single selling season: A decomposition approach," European Journal of Operational Research, Elsevier, vol. 184(1), pages 133-146, January.
    19. Tan, Tarkan & Gullu, Refik & Erkip, Nesim, 2007. "Modelling imperfect advance demand information and analysis of optimal inventory policies," European Journal of Operational Research, Elsevier, vol. 177(2), pages 897-923, March.
    20. Anantaram Balakrishnan & Joseph Geunes & Michael S. Pangburn, 2004. "Coordinating Supply Chains by Controlling Upstream Variability Propagation," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 163-183, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:190:y:2008:i:1:p:136-155. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.