Inventory management with variable lead-time dependent procurement cost
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
- ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.
- Das, Sanchoy K. & Abdel-Malek, Layek, 2003. "Modeling the flexibility of order quantities and lead-times in supply chains," International Journal of Production Economics, Elsevier, vol. 85(2), pages 171-181, August.
- Disney, S. M. & Towill, D. R., 2003. "On the bullwhip and inventory variance produced by an ordering policy," Omega, Elsevier, vol. 31(3), pages 157-167, June.
- Pan, Jason Chao-Hsien & Lo, Ming-Cheng & Hsiao, Yu-Cheng, 2004. "Optimal reorder point inventory models with variable lead time and backorder discount considerations," European Journal of Operational Research, Elsevier, vol. 158(2), pages 488-505, October.
- T L Urban, 2000. "Reorder level determination with serially-correlated demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(6), pages 762-768, June.
- Apostolos Burnetas & Stephen Gilbert, 2001. "Future Capacity Procurements Under Unknown Demand and Increasing Costs," Management Science, INFORMS, vol. 47(7), pages 979-992, July.
- Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
- Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Hsieh, Ying-Jiun, 2011. "Demand switching criteria for multiple products: An inventory cost analysis," Omega, Elsevier, vol. 39(2), pages 130-137, April.
- Fu, Ke & Xu, Jiayan & Miao, Zhaowei, 2013. "Newsvendor with multiple options of expediting," European Journal of Operational Research, Elsevier, vol. 226(1), pages 94-99.
- Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
- M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
- Glock, Christoph H. & Rekik, Yacine & Ries, Jörg M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," European Journal of Operational Research, Elsevier, vol. 285(1), pages 247-262.
- Haider Ali & Reshma Nasreen & Neetu Arneja & Chandra K. Jaggi, 2023. "Optimization of a periodically assessing model with manageable lead time under SLC with back order rebate for deteriorating items," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 241-266, February.
- Hsun Chuan Cho & Ying Jiun Hsieh & Lan Ying Huang, 2018. "Capturing the Risk-Pooling Effect through Inventory Planning and Demand Switching," Sustainability, MDPI, vol. 10(11), pages 1-14, November.
- Ramasesh, Ranga V., 2010. "Lot-sizing decisions under limited-time price incentives: A review," Omega, Elsevier, vol. 38(3-4), pages 118-135, June.
- Cui, Yaodong & Gu, Tianlong & Hu, Wei, 2009. "A cutting-and-inventory control problem in the manufacturing industry of stainless steel wares," Omega, Elsevier, vol. 37(4), pages 864-875, August.
- Fang, Xin & Zhang, Cheng & Robb, David J. & Blackburn, Joseph D., 2013. "Decision support for lead time and demand variability reduction," Omega, Elsevier, vol. 41(2), pages 390-396.
- Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
- Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
- S. R. Chakravarthy & Arunava Maity & U. C. Gupta, 2017. "An ‘(s, S)’ inventory in a queueing system with batch service facility," Annals of Operations Research, Springer, vol. 258(2), pages 263-283, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
- Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
- M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
- Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
- Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
- Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
- Chaharsooghi, S. Kamal & Heydari, Jafar, 2010. "LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?," International Journal of Production Economics, Elsevier, vol. 124(2), pages 475-481, April.
- Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
- Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
- Wu, Zhengping & Zhai, Xin & Liu, Zhongyi, 2015. "The inventory billboard effect on the lead-time decision," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 45-53.
- Naim, Mohamed M. & Gosling, Jonathan, 2011. "On leanness, agility and leagile supply chains," International Journal of Production Economics, Elsevier, vol. 131(1), pages 342-354, May.
- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- Cannella, S. & Ciancimino, E. & Ashayeri, J., 2010. "On the Significance of Demand and Inventory Smoothing Interventions in Supply Chain," Other publications TiSEM 03de2e58-4ef5-40a3-96e1-6, Tilburg University, School of Economics and Management.
- Trapero, Juan R. & Cardós, Manuel & Kourentzes, Nikolaos, 2019. "Empirical safety stock estimation based on kernel and GARCH models," Omega, Elsevier, vol. 84(C), pages 199-211.
- Leng, Mingming & Parlar, Mahmut, 2009. "Lead-time reduction in a two-level supply chain: Non-cooperative equilibria vs. coordination with a profit-sharing contract," International Journal of Production Economics, Elsevier, vol. 118(2), pages 521-544, April.
- Chaharsooghi, S. Kamal & Heydari, Jafar, 2010. "Supply chain coordination for the joint determination of order quantity and reorder point using credit option," European Journal of Operational Research, Elsevier, vol. 204(1), pages 86-95, July.
- Lee, Jun-Yeon & Schwarz, Leroy B., 2009. "Leadtime management in a periodic-review inventory system: A state-dependent base-stock policy," European Journal of Operational Research, Elsevier, vol. 199(1), pages 122-129, November.
- Kumar, Anupam & Evers, Philip T., 2015. "Setting safety stock based on imprecise records," International Journal of Production Economics, Elsevier, vol. 169(C), pages 68-75.
- Chandra, Charu & Grabis, Janis, 2005. "Application of multi-steps forecasting for restraining the bullwhip effect and improving inventory performance under autoregressive demand," European Journal of Operational Research, Elsevier, vol. 166(2), pages 337-350, October.
- Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
More about this item
Keywords
Inventory control Variable lead-time Sensitivity analysis;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:36:y:2008:i:5:p:877-887. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.