Setting safety stock based on imprecise records
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2015.07.018
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Braglia, Marcello & Castellano, Davide & Frosolini, Marco, 2014. "Safety stock management in single vendor–single buyer problem under VMI with consignment stock agreement," International Journal of Production Economics, Elsevier, vol. 154(C), pages 16-31.
- Thiel, Daniel & Hovelaque, Vincent & Thi Le Hoa, Vo, 2010.
"Impact of inventory inaccuracy on service-level quality in (Q,R) continuous-review lost-sales inventory models,"
International Journal of Production Economics, Elsevier, vol. 123(2), pages 301-311, February.
- Daniel Thiel & Vincent Hovelaque & Thi Le Hoa Vo, 2010. "Impact of inventory inaccuracy on service-level quality in (Q,R) continuous-review lost-sales inventory models," Post-Print halshs-00478488, HAL.
- Steffen T. Klosterhalfen & Stefan Minner & Sean P. Willems, 2014. "Strategic Safety Stock Placement in Supply Networks with Static Dual Supply," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 204-219, May.
- Altay, Nezih & Litteral, Lewis A. & Rudisill, Frank, 2012. "Effects of correlation on intermittent demand forecasting and stock control," International Journal of Production Economics, Elsevier, vol. 135(1), pages 275-283.
- So, Kut C. & Zheng, Xiaona, 2003. "Impact of supplier's lead time and forecast demand updating on retailer's order quantity variability in a two-level supply chain," International Journal of Production Economics, Elsevier, vol. 86(2), pages 169-179, November.
- T L Urban, 2000. "Reorder level determination with serially-correlated demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(6), pages 762-768, June.
- Gary D. Eppen & R. Kipp Martin, 1988. "Determining Safety Stock in the Presence of Stochastic Lead Time and Demand," Management Science, INFORMS, vol. 34(11), pages 1380-1390, November.
- Salal Humair & John D. Ruark & Brian Tomlin & Sean P. Willems, 2013. "Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization," Interfaces, INFORMS, vol. 43(5), pages 421-434, October.
- Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
- Dolgui, Alexandre & Pashkevich, Maksim, 2008. "Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance," International Journal of Production Economics, Elsevier, vol. 112(2), pages 885-894, April.
- Boute, Robert N. & Disney, Stephen M. & Lambrecht, Marc R. & Houdt, Benny Van, 2014. "Coordinating lead times and safety stocks under autocorrelated demand," European Journal of Operational Research, Elsevier, vol. 232(1), pages 52-63.
- Nicole DeHoratius & Adam J. Mersereau & Linus Schrage, 2008. "Retail Inventory Management When Records Are Inaccurate," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 257-277, November.
- Edward A. Silver, 1981. "Operations Research in Inventory Management: A Review and Critique," Operations Research, INFORMS, vol. 29(4), pages 628-645, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
- Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cannella, Salvatore & Dominguez, Roberto & Framinan, Jose M., 2017. "Inventory record inaccuracy – The impact of structural complexity and lead time variability," Omega, Elsevier, vol. 68(C), pages 123-138.
- Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
- Fan, Tijun & Tao, Feng & Deng, Sheng & Li, Shuxia, 2015. "Impact of RFID technology on supply chain decisions with inventory inaccuracies," International Journal of Production Economics, Elsevier, vol. 159(C), pages 117-125.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Cannella, Salvatore & Framinan, Jose M. & Bruccoleri, Manfredi & Barbosa-Póvoa, Ana Paula & Relvas, Susana, 2015. "The effect of Inventory Record Inaccuracy in Information Exchange Supply Chains," European Journal of Operational Research, Elsevier, vol. 243(1), pages 120-129.
- Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
- Wang, Fuqiang & Fang, Xiaoping & Chen, Xiaohong & Li, Xihua, 2016. "Impact of inventory inaccuracies on products with inventory-dependent demand," International Journal of Production Economics, Elsevier, vol. 177(C), pages 118-130.
- Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2023. "A theoretical validation of the DDMRP reorder policy," Computational Management Science, Springer, vol. 20(1), pages 1-28, December.
- Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Discrete‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 131-153, January.
- Feng Tao & Yanhong Xie & Yao-Yu Wang & Fujun Lai & Kin Keung Lai, 2022. "Contract strategies in competitive supply chains subject to inventory inaccuracy," Annals of Operations Research, Springer, vol. 309(2), pages 641-661, February.
- Agrawal, Paras M. & Sharda, Ramesh, 2012. "Impact of frequency of alignment of physical and information system inventories on out of stocks: A simulation study," International Journal of Production Economics, Elsevier, vol. 136(1), pages 45-55.
- Kök, A. Gürhan & Shang, Kevin H., 2014. "Evaluation of cycle-count policies for supply chains with inventory inaccuracy and implications on RFID investments," European Journal of Operational Research, Elsevier, vol. 237(1), pages 91-105.
- Gumrukcu, Seda & Rossetti, Manuel D. & Buyurgan, Nebil, 2008. "Quantifying the costs of cycle counting in a two-echelon supply chain with multiple items," International Journal of Production Economics, Elsevier, vol. 116(2), pages 263-274, December.
- Feng Tao & Tijun Fan & Kin Keung Lai & Lin Li, 2017. "Impact of RFID technology on inventory control policy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 207-220, February.
- Bandaly, Dia & Satir, Ahmet & Shanker, Latha, 2016. "Impact of lead time variability in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 180(C), pages 88-100.
- Nicole DeHoratius & Ananth Raman, 2008. "Inventory Record Inaccuracy: An Empirical Analysis," Management Science, INFORMS, vol. 54(4), pages 627-641, April.
- Klosterhalfen, Steffen T. & Willems, Sean P. & Dittmar, Daniel, 2023. "Safety stock placement in supply chains with expediting," European Journal of Operational Research, Elsevier, vol. 307(2), pages 745-757.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
- Gel, Esma S. & Erkip, Nesim & Thulaseedas, Anoop, 2010. "Analysis of simple inventory control systems with execution errors: Economic impact under correction opportunities," International Journal of Production Economics, Elsevier, vol. 125(1), pages 153-166, May.
More about this item
Keywords
Inventory record inaccuracy; Safety stocks; Correlated demand and lead time;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:169:y:2015:i:c:p:68-75. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.