IDEAS home Printed from https://ideas.repec.org/p/iim/iimawp/wp01682.html
   My bibliography  Save this paper

A Survey of Mathematical Programming Applications In Integrated Steel Plants

Author

Listed:
  • Fourer, Robert
  • Dutta, Goutam

Abstract

Mathematical programming techniques were used in the steel industry as early as 1958, and many applications of optimization in steel production have been reported since then. In this survey, we summarize published applications in the largest steel plants by type, including national steel planning, product mix optimization, blending, scheduling, set covering, and cutting stock.

Suggested Citation

  • Fourer, Robert & Dutta, Goutam, 2000. "A Survey of Mathematical Programming Applications In Integrated Steel Plants," IIMA Working Papers WP2000-06-01, Indian Institute of Management Ahmedabad, Research and Publication Department.
  • Handle: RePEc:iim:iimawp:wp01682
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Christoph Meyer & Matthias G. Wichmann & Thomas S. Spengler, 2016. "Management of recycling operations for iron and steel making slags," Journal of Business Economics, Springer, vol. 86(7), pages 773-808, October.
    2. Slotnick, Susan A., 2011. "Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size," European Journal of Operational Research, Elsevier, vol. 210(3), pages 527-536, May.
    3. Cochran, Jeffery K. & Marquez Uribe, Alberto, 2005. "A set covering formulation for agile capacity planning within supply chains," International Journal of Production Economics, Elsevier, vol. 95(2), pages 139-149, February.
    4. Singer, Marcos & Donoso, Patricio, 2006. "Strategic decision-making at a steel manufacturer assisted by linear programming," Journal of Business Research, Elsevier, vol. 59(3), pages 387-390, March.
    5. Singer, Marcos & Donoso, Patricio, 2008. "Empirical validation of an activity-based optimization system," International Journal of Production Economics, Elsevier, vol. 113(1), pages 335-345, May.
    6. Fröhling, Magnus & Schwaderer, Frank & Bartusch, Hauke & Rentz, Otto, 2010. "Integrated planning of transportation and recycling for multiple plants based on process simulation," European Journal of Operational Research, Elsevier, vol. 207(2), pages 958-970, December.
    7. As'ad, Rami & Demirli, Kudret, 2010. "Production scheduling in steel rolling mills with demand substitution: Rolling horizon implementation and approximations," International Journal of Production Economics, Elsevier, vol. 126(2), pages 361-369, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:iim:iimawp:wp01682. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://edirc.repec.org/data/eciimin.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.