A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.
- Mingyuan Chen, 1998. "A mathematical programming model for system reconfiguration in a dynamic cellular manufacturing environment," Annals of Operations Research, Springer, vol. 77(0), pages 109-128, January.
- Herer, Yale T. & Shalom, Levi, 2000. "The Kanban assignment problem - A non-integral approach," European Journal of Operational Research, Elsevier, vol. 120(2), pages 260-276, January.
- Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Gabriel R. Bitran & Li Chang, 1987. "A Mathematical Programming Approach to a Deterministic Kanban System," Management Science, INFORMS, vol. 33(4), pages 427-441, April.
- Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
- Price, Wilson & Gravel, Marc & Nsakanda, Aaron Luntala, 1994. "A review of optimisation models of Kanban-based production systems," European Journal of Operational Research, Elsevier, vol. 75(1), pages 1-12, May.
- Grubbstrom, Robert W. & Thu Thuy Huynh, Thi, 2006. "Multi-level, multi-stage capacity-constrained production-inventory systems in discrete time with non-zero lead times using MRP theory," International Journal of Production Economics, Elsevier, vol. 101(1), pages 53-62, May.
- Berretta, Regina & Rodrigues, Luiz Fernando, 2004. "A memetic algorithm for a multistage capacitated lot-sizing problem," International Journal of Production Economics, Elsevier, vol. 87(1), pages 67-81, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mohammad Mohammadi, 2017. "The Tradeoff between Outsourcing and Using More Factories in a Distributed Flow Shop System," ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, Faculty of Economic Cybernetics, Statistics and Informatics, vol. 51(4), pages 279-295.
- Boutsinas, Basilis, 2013. "Machine-part cell formation using biclustering," European Journal of Operational Research, Elsevier, vol. 230(3), pages 563-572.
- Papaioannou, Grammatoula & Wilson, John M., 2010. "The evolution of cell formation problem methodologies based on recent studies (1997-2008): Review and directions for future research," European Journal of Operational Research, Elsevier, vol. 206(3), pages 509-521, November.
- Hanxin Feng & Tangbin Xia & Wen Da & Lifeng Xi & Ershun Pan, 2019. "Concurrent design of cell formation and scheduling with consideration of duplicate machines and alternative process routings," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 275-289, January.
- Ting Qu & Matthias Thürer & Junhao Wang & Zongzhong Wang & Huan Fu & Congdong Li & George Q. Huang, 2017. "System dynamics analysis for an Internet-of-Things-enabled production logistics system," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2622-2649, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
- Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
- Chen, Cheng-Kang & Lo, Chih-Chung & Liao, Yi-Xiang, 2008. "Optimal lot size with learning consideration on an imperfect production system with allowable shortages," International Journal of Production Economics, Elsevier, vol. 113(1), pages 459-469, May.
- M. Jaber & Z. Givi, 2015. "Imperfect production process with learning and forgetting effects," Computational Management Science, Springer, vol. 12(1), pages 129-152, January.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2008. "Production lot sizing with process deterioration and machine breakdown," European Journal of Operational Research, Elsevier, vol. 185(2), pages 606-618, March.
- Hsieh, Chung-Chi & Lee, Zong-Zhe, 2005. "Joint determination of production run length and number of standbys in a deteriorating production process," European Journal of Operational Research, Elsevier, vol. 162(2), pages 359-371, April.
- Nadeau, Marie-Claude & Kar, Ashish & Roth, Richard & Kirchain, Randolph, 2010. "A dynamic process-based cost modeling approach to understand learning effects in manufacturing," International Journal of Production Economics, Elsevier, vol. 128(1), pages 223-234, November.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Jaber, Mohamad Y. & Khan, Mehmood, 2010. "Managing yield by lot splitting in a serial production line with learning, rework and scrap," International Journal of Production Economics, Elsevier, vol. 124(1), pages 32-39, March.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
- Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
- Asefeh Hasani Goodarzi & Seyed Hessameddin Zegordi, 2020. "Vehicle routing problem in a kanban controlled supply chain system considering cross-docking strategy," Operational Research, Springer, vol. 20(4), pages 2397-2425, December.
- Chih‐Hsiung Wang, 2006. "Optimal production and maintenance policy for imperfect production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(2), pages 151-156, March.
- W. Pearn & R. Su & M. Weng & C. Hsu, 2011. "Optimal production run time for two-stage production system with imperfect processes and allowable shortages," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 533-545, December.
- Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
- Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
- Jaber, Mohamad Y. & Guiffrida, Alfred L., 2004. "Learning curves for processes generating defects requiring reworks," European Journal of Operational Research, Elsevier, vol. 159(3), pages 663-672, December.
- Jaber, Mohamad Y. & Bonney, Maurice & Guiffrida, Alfred L., 2010. "Coordinating a three-level supply chain with learning-based continuous improvement," International Journal of Production Economics, Elsevier, vol. 127(1), pages 27-38, September.
- Jaber, Mohamad Y. & Guiffrida, Alfred L., 2008. "Learning curves for imperfect production processes with reworks and process restoration interruptions," European Journal of Operational Research, Elsevier, vol. 189(1), pages 93-104, August.
- R. Patro & Mitali M. Nayak & M. Acharya, 2019. "An EOQ model for fuzzy defective rate with allowable proportionate discount," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 191-215, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:187:y:2008:i:1:p:46-69. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.