IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v101y2006i1p53-62.html
   My bibliography  Save this article

Multi-level, multi-stage capacity-constrained production-inventory systems in discrete time with non-zero lead times using MRP theory

Author

Listed:
  • Grubbstrom, Robert W.
  • Thu Thuy Huynh, Thi

Abstract

No abstract is available for this item.

Suggested Citation

  • Grubbstrom, Robert W. & Thu Thuy Huynh, Thi, 2006. "Multi-level, multi-stage capacity-constrained production-inventory systems in discrete time with non-zero lead times using MRP theory," International Journal of Production Economics, Elsevier, vol. 101(1), pages 53-62, May.
  • Handle: RePEc:eee:proeco:v:101:y:2006:i:1:p:53-62
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(05)00132-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Grubbstrom, Robert W. & Wang, Zhiping, 2003. "A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems," International Journal of Production Economics, Elsevier, vol. 81(1), pages 483-494, January.
    2. Maes, Johan & McClain, John O. & Van Wassenhove, Luk N., 1991. "Multilevel capacitated lotsizing complexity and LP-based heuristics," European Journal of Operational Research, Elsevier, vol. 53(2), pages 131-148, July.
    3. Ozdamar, Linet & Barbarosoglu, Gulay, 2000. "An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 68(3), pages 319-331, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Danijel Kovačić & Ludvik Bogataj, 2011. "Multistage reverse logistics of assembly systems in extended MRP Theory consisting of all material flows," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(3), pages 337-357, September.
    2. Hennet, Jean-Claude & Mahjoub, Sonia, 2010. "Toward the fair sharing of profit in a supply network formation," International Journal of Production Economics, Elsevier, vol. 127(1), pages 112-120, September.
    3. Defersha, Fantahun M. & Chen, Mingyuan, 2008. "A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality," European Journal of Operational Research, Elsevier, vol. 187(1), pages 46-69, May.
    4. Beullens, Patrick & Janssens, Gerrit K., 2011. "Holding costs under push or pull conditions - The impact of the Anchor Point," European Journal of Operational Research, Elsevier, vol. 215(1), pages 115-125, November.
    5. Sarkar, Biswajit & Guchhait, Rekha & Sarkar, Mitali & Cárdenas-Barrón, Leopoldo Eduardo, 2019. "How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework?," International Journal of Production Economics, Elsevier, vol. 213(C), pages 243-257.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Berretta, Regina & Rodrigues, Luiz Fernando, 2004. "A memetic algorithm for a multistage capacitated lot-sizing problem," International Journal of Production Economics, Elsevier, vol. 87(1), pages 67-81, January.
    2. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    3. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    4. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
    5. Almeder, Christian, 2010. "A hybrid optimization approach for multi-level capacitated lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 200(2), pages 599-606, January.
    6. Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.
    7. Almeder, Christian & Klabjan, Diego & Traxler, Renate & Almada-Lobo, Bernardo, 2015. "Lead time considerations for the multi-level capacitated lot-sizing problem," European Journal of Operational Research, Elsevier, vol. 241(3), pages 727-738.
    8. Merce, C. & Fontan, G., 2003. "MIP-based heuristics for capacitated lotsizing problems," International Journal of Production Economics, Elsevier, vol. 85(1), pages 97-111, July.
    9. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    10. Lawrence C. Leung & Yer Van Hui & Yong Wang & Gang Chen, 2009. "A 0--1 LP Model for the Integration and Consolidation of Air Cargo Shipments," Operations Research, INFORMS, vol. 57(2), pages 402-412, April.
    11. Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
    12. Simon Thevenin & Yossiri Adulyasak & Jean-François Cordeau, 2022. "Stochastic Dual Dynamic Programming for Multiechelon Lot Sizing with Component Substitution," INFORMS Journal on Computing, INFORMS, vol. 34(6), pages 3151-3169, November.
    13. Elena Katok & Dennis Ott, 2000. "Using Mixed-Integer Programming to Reduce Label Changes in the Coors Aluminum Can Plant," Interfaces, INFORMS, vol. 30(2), pages 1-12, April.
    14. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    15. Marcos Mansano Furlan & Maristela Oliveira Santos, 2017. "BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 929-944, April.
    16. Drexl, Andreas & Fleischmann, B. & Günther, H.-O. & Stadtler, H. & Tempelmeier, H., 1993. "Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 315, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
    18. Almada-Lobo, Bernardo & Oliveira, José F. & Carravilla, Maria Antónia, 2008. "Production planning and scheduling in the glass container industry: A VNS approach," International Journal of Production Economics, Elsevier, vol. 114(1), pages 363-375, July.
    19. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.
    20. Sônia Poltroniere & Kelly Poldi & Franklina Toledo & Marcos Arenales, 2008. "A coupling cutting stock-lot sizing problem in the paper industry," Annals of Operations Research, Springer, vol. 157(1), pages 91-104, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:101:y:2006:i:1:p:53-62. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.