IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v95y2005i3p317-326.html
   My bibliography  Save this article

A mixed integer programming model for a two line CONWIP-based production and assembly system

Author

Listed:
  • Cao, Dong
  • Chen, Mingyuan

Abstract

No abstract is available for this item.

Suggested Citation

  • Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
  • Handle: RePEc:eee:proeco:v:95:y:2005:i:3:p:317-326
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00010-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gabriel R. Bitran & Li Chang, 1987. "A Mathematical Programming Approach to a Deterministic Kanban System," Management Science, INFORMS, vol. 33(4), pages 427-441, April.
    2. Mark L. Spearman, 1992. "Customer Service in Pull Production Systems," Operations Research, INFORMS, vol. 40(5), pages 948-958, October.
    3. Price, Wilson & Gravel, Marc & Nsakanda, Aaron Luntala, 1994. "A review of optimisation models of Kanban-based production systems," European Journal of Operational Research, Elsevier, vol. 75(1), pages 1-12, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yang, Taho & Fu, Hsin-Pin & Yang, Kuang-Yi, 2007. "An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy--A case study," International Journal of Production Economics, Elsevier, vol. 107(1), pages 104-114, May.
    2. Park, Chan-Woo & Lee, Hyo-Seong, 2013. "Performance evaluation of a multi-product CONWIP assembly system with correlated external demands," International Journal of Production Economics, Elsevier, vol. 144(1), pages 334-344.
    3. Matthias Thürer & Nuno O. Fernandes & Mark Stevenson & Ting Qu, 2017. "On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4695-4711, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
    2. Defersha, Fantahun M. & Chen, Mingyuan, 2008. "A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality," European Journal of Operational Research, Elsevier, vol. 187(1), pages 46-69, May.
    3. Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
    4. Arabatzis, Garyfallos & Petridis, Konstantinos & Galatsidas, Spyros & Ioannou, Konstantinos, 2013. "A demand scenario based fuelwood supply chain: A conceptual model," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 687-697.
    5. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    6. Seki, Yoichi & Hoshino, Naoto, 1999. "Transient behavior of a single-stage kanban system based on the queueing model," International Journal of Production Economics, Elsevier, vol. 60(1), pages 369-374, April.
    7. Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
    8. Savsar, Mehmet & Al-Jawini, Abdullah, 1995. "Simulation analysis of just-in-time production systems," International Journal of Production Economics, Elsevier, vol. 42(1), pages 67-78, November.
    9. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    10. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    11. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    12. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
    13. Drexl, Andreas & Kimms, Alf, 1997. "Sequencing JIT mixed-model assembly lines under station load- and part usage-constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 460, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    14. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Other publications TiSEM ac7da569-7495-4fc4-a4e1-0, Tilburg University, School of Economics and Management.
    15. Venky Nagar & Madhav V. Rajan & Richard Saouma, 2009. "The Incentive Value of Inventory and Cross‐training in Modern Manufacturing," Journal of Accounting Research, Wiley Blackwell, vol. 47(4), pages 991-1025, September.
    16. Asefeh Hasani Goodarzi & Seyed Hessameddin Zegordi, 2020. "Vehicle routing problem in a kanban controlled supply chain system considering cross-docking strategy," Operational Research, Springer, vol. 20(4), pages 2397-2425, December.
    17. Sharadapriyadarshini, B. & Rajendran, Chandrasekharan, 1997. "Heuristics for scheduling in a Kanban system with dual blocking mechanisms," European Journal of Operational Research, Elsevier, vol. 103(3), pages 439-452, December.
    18. Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Discussion Paper 1998-31, Tilburg University, Center for Economic Research.
    19. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    20. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:95:y:2005:i:3:p:317-326. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.