A Mathematical Programming Approach to a Deterministic Kanban System
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.33.4.427
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Savsar, Mehmet & Al-Jawini, Abdullah, 1995. "Simulation analysis of just-in-time production systems," International Journal of Production Economics, Elsevier, vol. 42(1), pages 67-78, November.
- Venky Nagar & Madhav V. Rajan & Richard Saouma, 2009. "The Incentive Value of Inventory and Cross‐training in Modern Manufacturing," Journal of Accounting Research, Wiley Blackwell, vol. 47(4), pages 991-1025, September.
- de Souza, Mauricio C. & de Carvalho, Carlos R.V. & Brizon, Wellington B., 2008. "Packing items to feed assembly lines," European Journal of Operational Research, Elsevier, vol. 184(2), pages 480-489, January.
- Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
- Ou, Jihong & Jiang, Jiong, 1997. "Yield comparison of push and pull control methods on production systems with unreliable machines," International Journal of Production Economics, Elsevier, vol. 50(1), pages 1-12, May.
- Defersha, Fantahun M. & Chen, Mingyuan, 2008. "A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality," European Journal of Operational Research, Elsevier, vol. 187(1), pages 46-69, May.
- Moattar Husseini, S.M. & O'Brien, C. & Hosseini, S.T., 2006. "A method to enhance volume flexibility in JIT production control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 653-665, December.
- Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
- Herer, Yale T. & Shalom, Levi, 2000. "The Kanban assignment problem - A non-integral approach," European Journal of Operational Research, Elsevier, vol. 120(2), pages 260-276, January.
- Francesco Lolli & Rita Gamberini & Claudio Giberti & Bianca Rimini & Federica Bondi, 2016. "A simulative approach for evaluating alternative feeding scenarios in a kanban system," International Journal of Production Research, Taylor & Francis Journals, vol. 54(14), pages 4228-4239, July.
- Houmin Yan & Xun Yu Zhou & G. Yin, 1999. "Approximating an Optimal Production Policy in a Continuous Flow Line: Recurrence and Asymptotic Properties," Operations Research, INFORMS, vol. 47(4), pages 535-549, August.
- Drexl, Andreas & Kimms, Alf, 1997. "Sequencing JIT mixed-model assembly lines under station load- and part usage-constraints," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 460, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
More about this item
Keywords
just-in-time manufacturing: Kanban; inventory/production: deterministic models; programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:33:y:1987:i:4:p:427-441. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.