IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v172y2006i3p838-854.html
   My bibliography  Save this article

A multi-objective resource allocation problem in PERT networks

Author

Listed:
  • Azaron, Amir
  • Katagiri, Hideki
  • Sakawa, Masatoshi
  • Kato, Kosuke
  • Memariani, Azizollah

Abstract

No abstract is available for this item.

Suggested Citation

  • Azaron, Amir & Katagiri, Hideki & Sakawa, Masatoshi & Kato, Kosuke & Memariani, Azizollah, 2006. "A multi-objective resource allocation problem in PERT networks," European Journal of Operational Research, Elsevier, vol. 172(3), pages 838-854, August.
  • Handle: RePEc:eee:ejores:v:172:y:2006:i:3:p:838-854
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(05)00004-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Salah E. Elmaghraby, 1967. "On the Expected Duration of PERT Type Networks," Management Science, INFORMS, vol. 13(5), pages 299-306, January.
    2. Jan Weogon glarz, 1981. "Project Scheduling with Continuously-Divisible, Doubly Constrained Resources," Management Science, INFORMS, vol. 27(9), pages 1040-1053, September.
    3. Azaron, Amir & Fatemi Ghomi, S. M. T., 2003. "Optimal control of service rates and arrivals in Jackson networks," European Journal of Operational Research, Elsevier, vol. 147(1), pages 17-31, May.
    4. Kent H. Tseng & Man-Tung T. Hsiao, 1995. "Optimal Control of Arrivals to Token Ring Networks with Exhaustive Service Discipline," Operations Research, INFORMS, vol. 43(1), pages 89-101, February.
    5. D. R. Fulkerson, 1961. "A Network Flow Computation for Project Cost Curves," Management Science, INFORMS, vol. 7(2), pages 167-178, January.
    6. A. Charnes & W. W. Cooper & G. L. Thompson, 1964. "Critical Path Analyses Via Chance Constrained and Stochastic Programming," Operations Research, INFORMS, vol. 12(3), pages 460-470, June.
    7. Fatemi Ghomi, S. M. T. & Rabbani, M., 2003. "A new structural mechanism for reducibility of stochastic PERT networks," European Journal of Operational Research, Elsevier, vol. 145(2), pages 394-402, March.
    8. Sigal, C.E. & Pritsker, A.A.B. & Solberg, J.J., 1979. "The use of cutsets in Monte Carlo analysis of stochastic networks," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 21(4), pages 376-384.
    9. E. B. Berman, 1964. "Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions," Management Science, INFORMS, vol. 10(4), pages 734-745, July.
    10. Tavares, L. Valadares, 1987. "Optimal resource profiles for program scheduling," European Journal of Operational Research, Elsevier, vol. 29(1), pages 83-90, April.
    11. L. R. Lamberson & R. R. Hocking, 1970. "Optimum Time Compression in Project Scheduling," Management Science, INFORMS, vol. 16(10), pages 597-606, June.
    12. Shioyama, Tadayoshi, 1991. "Optimal control of a queuing network system with two types of customers," European Journal of Operational Research, Elsevier, vol. 52(3), pages 367-372, June.
    13. C. Perry & I. D. Greig, 1975. "Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis," Management Science, INFORMS, vol. 21(12), pages 1477-1480, August.
    14. V. G. Kulkarni & V. G. Adlakha, 1986. "Markov and Markov-Regenerative pert Networks," Operations Research, INFORMS, vol. 34(5), pages 769-781, October.
    15. J. J. Martin, 1965. "Distribution of the Time Through a Directed, Acyclic Network," Operations Research, INFORMS, vol. 13(1), pages 46-66, February.
    16. James E. Falk & Joel L. Horowitz, 1972. "Critical Path Problems with Concave Cost-Time Curves," Management Science, INFORMS, vol. 19(4-Part-1), pages 446-455, December.
    17. D. R. Fulkerson, 1962. "Expected Critical Path Lengths in PERT Networks," Operations Research, INFORMS, vol. 10(6), pages 808-817, December.
    18. Mark B. Garman, 1972. "More on Conditioned Sampling in the Simulation of Stochastic Networks," Management Science, INFORMS, vol. 19(1), pages 90-95, September.
    19. Elmaghraby, Salah E., 1993. "Resource allocation via dynamic programming in activity networks," European Journal of Operational Research, Elsevier, vol. 64(2), pages 199-215, January.
    20. Fatemi Ghomi, S. M. T. & Hashemin, S. S., 1999. "A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network," European Journal of Operational Research, Elsevier, vol. 114(3), pages 610-625, May.
    21. John M. Burt, Jr. & Mark B. Garman, 1971. "Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis," Management Science, INFORMS, vol. 18(3), pages 207-217, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 119-140, September.
    2. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 1-22, September.
    3. Godinho, Pedro & Branco, Fernando G., 2012. "Adaptive policies for multi-mode project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 216(3), pages 553-562.
    4. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
    5. Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2007. "Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1186-1200, August.
    6. Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
    7. Hahn, Eugene David, 2008. "Mixture densities for project management activity times: A robust approach to PERT," European Journal of Operational Research, Elsevier, vol. 188(2), pages 450-459, July.
    8. Azaron, Amir & Fatemi Ghomi, S.M.T., 2008. "Lower bound for the mean project completion time in dynamic PERT networks," European Journal of Operational Research, Elsevier, vol. 186(1), pages 120-127, April.
    9. Nelson, Richard Graham & Azaron, Amir & Aref, Samin, 2016. "The use of a GERT based method to model concurrent product development processes," European Journal of Operational Research, Elsevier, vol. 250(2), pages 566-578.
    10. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Amir Azaron & Hideki Katagiri & Masatoshi Sakawa, 2007. "Time-cost trade-off via optimal control theory in Markov PERT networks," Annals of Operations Research, Springer, vol. 150(1), pages 47-64, March.
    2. Azaron, Amir & Fatemi Ghomi, S.M.T., 2008. "Lower bound for the mean project completion time in dynamic PERT networks," European Journal of Operational Research, Elsevier, vol. 186(1), pages 120-127, April.
    3. Azaron, Amir & Fynes, Brian & Modarres, Mohammad, 2011. "Due date assignment in repetitive projects," International Journal of Production Economics, Elsevier, vol. 129(1), pages 79-85, January.
    4. Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2007. "Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1186-1200, August.
    5. Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
    6. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Longest path analysis in networks of queues: Dynamic scheduling problems," European Journal of Operational Research, Elsevier, vol. 174(1), pages 132-149, October.
    7. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
    8. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
    9. Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
    10. R L Bregman, 2009. "Preemptive expediting to improve project due date performance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 120-129, January.
    11. Fatemi Ghomi, S. M. T. & Hashemin, S. S., 1999. "A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network," European Journal of Operational Research, Elsevier, vol. 114(3), pages 610-625, May.
    12. S. Selcuk Erenguc & Taeho Ahn & Daniel G. Conway, 2001. "The resource constrained project scheduling problem with multiple crashable modes: An exact solution method," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 107-127, March.
    13. Ahn, Taeho & Erenguc, S. Selcuk, 1998. "The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure," European Journal of Operational Research, Elsevier, vol. 107(2), pages 250-259, June.
    14. Tetsuo Iida, 2000. "Computing bounds on project duration distributions for stochastic PERT networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(7), pages 559-580, October.
    15. Masoud Arjmand & Amir Abbas Najafi & Majid Ebrahimzadeh, 2020. "Evolutionary algorithms for multi-objective stochastic resource availability cost problem," OPSEARCH, Springer;Operational Research Society of India, vol. 57(3), pages 935-985, September.
    16. Lee, Heejung & Suh, Hyo-Won, 2008. "Estimating the duration of stochastic workflow for product development process," International Journal of Production Economics, Elsevier, vol. 111(1), pages 105-117, January.
    17. Choi, Byung-Cheon & Park, Myoung-Ju, 2015. "A continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs," European Journal of Operational Research, Elsevier, vol. 244(3), pages 748-752.
    18. Tavares, L. V., 2002. "A review of the contribution of Operational Research to Project Management," European Journal of Operational Research, Elsevier, vol. 136(1), pages 1-18, January.
    19. Davaadorjin Monhor, 2011. "A new probabilistic approach to the path criticality in stochastic PERT," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 19(4), pages 615-633, December.
    20. Gary Mitchell, 2010. "On Calculating Activity Slack in Stochastic Project Networks," American Journal of Economics and Business Administration, Science Publications, vol. 2(1), pages 78-85, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:172:y:2006:i:3:p:838-854. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.