A review of the contribution of Operational Research to Project Management
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Salah E. Elmaghraby, 1967. "On the Expected Duration of PERT Type Networks," Management Science, INFORMS, vol. 13(5), pages 299-306, January.
- Jan Weogon glarz, 1981. "Project Scheduling with Continuously-Divisible, Doubly Constrained Resources," Management Science, INFORMS, vol. 27(9), pages 1040-1053, September.
- Valadares Tavares, Luis & Weglarz, Jan, 1990. "Project management and scheduling: A permanent challenge for OR," European Journal of Operational Research, Elsevier, vol. 49(1), pages 1-2, November.
- Tavares, L. Valadares, 1987. "Optimal resource profiles for program scheduling," European Journal of Operational Research, Elsevier, vol. 29(1), pages 83-90, April.
- Agrawal, M. K. & Elmaghraby, S. E. & Herroelen, W. S., 1996. ": A generator of testsets for project activity nets," European Journal of Operational Research, Elsevier, vol. 90(2), pages 376-382, April.
- Elmaghraby, Salah E., 1990. "Project bidding under deterministic and probabilistic activity durations," European Journal of Operational Research, Elsevier, vol. 49(1), pages 14-34, November.
- Valadares Tavares, L., 1990. "A multi-stage non-deterministic model for project scheduling under resources constraints," European Journal of Operational Research, Elsevier, vol. 49(1), pages 92-101, November.
- Tavares, L. Valadares, 1994. "A stochastic model to control project duration and expenditure," European Journal of Operational Research, Elsevier, vol. 78(2), pages 262-266, October.
- E. Demeulemeester & B. Dodin & W. Herroelen, 1993. "A Random Activity Network Generator," Operations Research, INFORMS, vol. 41(5), pages 972-980, October.
- Elmaghraby, Salah E. & Herroelen, Willy S., 1990. "The scheduling of activities to maximize the net present value of projects," European Journal of Operational Research, Elsevier, vol. 49(1), pages 35-49, November.
- Erik L. Demeulemeester & Willy S. Herroelen, 1997. "A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem," Operations Research, INFORMS, vol. 45(2), pages 201-212, April.
- Boctor, Fayer F., 1990. "Some efficient multi-heuristic procedures for resource-constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 49(1), pages 3-13, November.
- Speranza, M. Grazia & Vercellis, Carlo, 1993. "Hierarchical models for multi-project planning and scheduling," European Journal of Operational Research, Elsevier, vol. 64(2), pages 312-325, January.
- Brucker, Peter & Knust, Sigrid & Schoo, Arno & Thiele, Olaf, 1998. "A branch and bound algorithm for the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 107(2), pages 272-288, June.
- Harhalakis, George, 1990. "Special features of precedence network charts," European Journal of Operational Research, Elsevier, vol. 49(1), pages 50-59, November.
- Ahn, Taeho & Erenguc, S. Selcuk, 1998. "The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure," European Journal of Operational Research, Elsevier, vol. 107(2), pages 250-259, June.
- Elmaghraby, Salah E., 1993. "Resource allocation via dynamic programming in activity networks," European Journal of Operational Research, Elsevier, vol. 64(2), pages 199-215, January.
- Elmaghraby, Salah E., 1995. "Activity nets: A guided tour through some recent developments," European Journal of Operational Research, Elsevier, vol. 82(3), pages 383-408, May.
- Tavares, L. Valadares & Antunes Ferreira, J. A. & Silva Coelho, J., 1998. "On the optimal management of project risk," European Journal of Operational Research, Elsevier, vol. 107(2), pages 451-469, June.
- Bianco, L. & Dell'Olmo, P. & Grazia Speranza, M., 1998. "Heuristics for multimode scheduling problems with dedicated resources," European Journal of Operational Research, Elsevier, vol. 107(2), pages 260-271, June.
- Sprecher, Arno & Drexl, Andreas, 1998. "Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm," European Journal of Operational Research, Elsevier, vol. 107(2), pages 431-450, June.
- Ragsdale, C, 1989. "The current state of network simulation in project management theory and practice," Omega, Elsevier, vol. 17(1), pages 21-25.
- James H. Patterson, 1984. "A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem," Management Science, INFORMS, vol. 30(7), pages 854-867, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Shipley, Margaret F. & Johnson, Madeline, 2009. "A fuzzy approach for selecting project membership to achieve cognitive style goals," European Journal of Operational Research, Elsevier, vol. 192(3), pages 918-928, February.
- Kockum, Fredrick & Dacre, Nicholas, 2021. "Project Management Volume, Velocity, Variety: A Big Data Dynamics Approach," SocArXiv k3h9r, Center for Open Science.
- Hartmann, Sönke & Briskorn, Dirk, 2022. "An updated survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 297(1), pages 1-14.
- Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
- Li, Gang & Balakrishnan, Anantaram, 2016. "Models and algorithms for network reduction," European Journal of Operational Research, Elsevier, vol. 248(3), pages 930-942.
- F. Perez & T. Gomez, 2016. "Multiobjective project portfolio selection with fuzzy constraints," Annals of Operations Research, Springer, vol. 245(1), pages 7-29, October.
- Chen, Chung-Yang & Liu, Heng-An & Song, Je-Yi, 2013. "Integrated projects planning in IS departments: A multi-period multi-project selection and assignment approach with a computerized implementation," European Journal of Operational Research, Elsevier, vol. 229(3), pages 683-694.
- H. Dharma Kwon & Steven A. Lippman & Kevin F. McCardle & Christopher S. Tang, 2010. "Project Management Contracts with Delayed Payments," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 692-707, October.
- Dharma Kwon, H. & Lippman, Steven A. & Tang, Christopher S., 2011. "Sourcing decisions of project tasks with exponential completion times: Impact on operating profits," International Journal of Production Economics, Elsevier, vol. 134(1), pages 138-150, November.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Daniel Reich & Leo Lopes, 2011. "Preprocessing Stochastic Shortest-Path Problems with Application to PERT Activity Networks," INFORMS Journal on Computing, INFORMS, vol. 23(3), pages 460-469, August.
- Willy Herroelen & Javier Pajares & Adolfo López-Paredes, 2011. "Foreword," Annals of Operations Research, Springer, vol. 186(1), pages 393-394, June.
- Kennedy, Deanna M. & Sommer, S. Amy & Nguyen, Phuong Anh, 2017. "Optimizing multi-team system behaviors: Insights from modeling team communication," European Journal of Operational Research, Elsevier, vol. 258(1), pages 264-278.
- Shi Chen & Ted Klastorin & Michael R. Wagner, 2021. "Designing practical coordinating contracts in decentralized projects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(2), pages 183-198, March.
- Christos Ellinas & Christos Nicolaides & Naoki Masuda, 2022. "Mitigation strategies against cascading failures within a project activity network," Journal of Computational Social Science, Springer, vol. 5(1), pages 383-400, May.
- Yousry Abdelkader, 2010. "Adjustment of the moments of the project completion times when activity times are exponentially distributed," Annals of Operations Research, Springer, vol. 181(1), pages 503-514, December.
- J Davis & A MacDonald & L White, 2010. "Problem-structuring methods and project management: an example of stakeholder involvement using Hierarchical Process Modelling methodology," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 893-904, June.
- Tony Chen & Ted Klastorin & Michael R. Wagner, 2015. "Incentive Contracts in Serial Stochastic Projects," Manufacturing & Service Operations Management, INFORMS, vol. 17(3), pages 290-301, July.
- Joel Goh & Nicholas G. Hall, 2013. "Total Cost Control in Project Management via Satisficing," Management Science, INFORMS, vol. 59(6), pages 1354-1372, June.
- Dharma Kwon, H. & Lippman, Steven A. & Tang, Christopher S., 2010. "Optimal time-based and cost-based coordinated project contracts with unobservable work rates," International Journal of Production Economics, Elsevier, vol. 126(2), pages 247-254, August.
- Doerner, K.F. & Gutjahr, W.J. & Hartl, R.F. & Strauss, C. & Stummer, C., 2008. "Nature-inspired metaheuristics for multiobjective activity crashing," Omega, Elsevier, vol. 36(6), pages 1019-1037, December.
- Mingers, John & White, Leroy, 2010. "A review of the recent contribution of systems thinking to operational research and management science," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1147-1161, December.
- Gunasekaran, Angappa & Ngai, Eric W.T., 2012. "The future of operations management: An outlook and analysis," International Journal of Production Economics, Elsevier, vol. 135(2), pages 687-701.
- Abdelkader, Yousry H., 2004. "Evaluating project completion times when activity times are Weibull distributed," European Journal of Operational Research, Elsevier, vol. 157(3), pages 704-715, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Herroelen, Willy S. & Van Dommelen, Patrick & Demeulemeester, Erik L., 1997. "Project network models with discounted cash flows a guided tour through recent developments," European Journal of Operational Research, Elsevier, vol. 100(1), pages 97-121, July.
- Azaron, Amir & Katagiri, Hideki & Sakawa, Masatoshi & Kato, Kosuke & Memariani, Azizollah, 2006. "A multi-objective resource allocation problem in PERT networks," European Journal of Operational Research, Elsevier, vol. 172(3), pages 838-854, August.
- Abdollah Arasteh, 2020. "Considering Project Management Activities for Engineering Design Groups," SN Operations Research Forum, Springer, vol. 1(4), pages 1-29, December.
- Chen, Jiaqiong & Askin, Ronald G., 2009. "Project selection, scheduling and resource allocation with time dependent returns," European Journal of Operational Research, Elsevier, vol. 193(1), pages 23-34, February.
- Drexl, Andreas & Nissen, Rudiger & Patterson, James H. & Salewski, Frank, 2000. "ProGen/[pi]x - An instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions," European Journal of Operational Research, Elsevier, vol. 125(1), pages 59-72, August.
- Viana, Ana & Pinho de Sousa, Jorge, 2000. "Using metaheuristics in multiobjective resource constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 120(2), pages 359-374, January.
- Dayal Madhukar & Verma, Sanjay, 2015. "Multi-processor Exact Procedures for Regular Measures of the Multi-mode RCPSP," IIMA Working Papers WP2015-03-25, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Mika, Marek & Waligora, Grzegorz & Weglarz, Jan, 2005. "Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models," European Journal of Operational Research, Elsevier, vol. 164(3), pages 639-668, August.
- Klein, Robert, 2000. "Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects," European Journal of Operational Research, Elsevier, vol. 127(3), pages 619-638, December.
- Amir Azaron & Hideki Katagiri & Masatoshi Sakawa, 2007. "Time-cost trade-off via optimal control theory in Markov PERT networks," Annals of Operations Research, Springer, vol. 150(1), pages 47-64, March.
- He, Naihui & Zhang, David Z. & Yuce, Baris, 2022. "Integrated multi-project planning and scheduling - a multiagent approach," European Journal of Operational Research, Elsevier, vol. 302(2), pages 688-699.
- Schirmer, Andreas & Riesenberg, Sven, 1997. "Parameterized heuristics for project scheduling: Biased random sampling methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 456, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Bouleimen, K. & Lecocq, H., 2003. "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version," European Journal of Operational Research, Elsevier, vol. 149(2), pages 268-281, September.
- Pfeifer, Jeremy & Barker, Kash & Ramirez-Marquez, Jose E. & Morshedlou, Nazanin, 2015. "Quantifying the risk of project delays with a genetic algorithm," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 34-44.
- Van Eynde, Rob & Vanhoucke, Mario, 2022. "New summary measures and datasets for the multi-project scheduling problem," European Journal of Operational Research, Elsevier, vol. 299(3), pages 853-868.
- Ulusoy, Gunduz & Ozdamar, Linet, 1996. "A framework for an interactive project scheduling system under limited resources," European Journal of Operational Research, Elsevier, vol. 90(2), pages 362-375, April.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:136:y:2002:i:1:p:1-18. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.