My bibliography
Save this item
A Review of Production Scheduling
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- El Mehdi, Er Raqabi & Ilyas, Himmich & Nizar, El Hachemi & Issmaïl, El Hallaoui & François, Soumis, 2023. "Incremental LNS framework for integrated production, inventory, and vessel scheduling: Application to a global supply chain," Omega, Elsevier, vol. 116(C).
- Lingye Tan & Tiong Lee Kong & Ziyang Zhang & Ahmed Sayed M. Metwally & Shubham Sharma & Kanta Prasad Sharma & Sayed M. Eldin & Dominik Zimon, 2023. "Scheduling and Controlling Production in an Internet of Things Environment for Industry 4.0: An Analysis and Systematic Review of Scientific Metrological Data," Sustainability, MDPI, vol. 15(9), pages 1-37, May.
- Khalil Tliba & Thierno M. L. Diallo & Olivia Penas & Romdhane Ben Khalifa & Noureddine Ben Yahia & Jean-Yves Choley, 2023. "Digital twin-driven dynamic scheduling of a hybrid flow shop," Journal of Intelligent Manufacturing, Springer, vol. 34(5), pages 2281-2306, June.
- Tang, Christopher S., 2010. "A review of marketing-operations interface models: From co-existence to coordination and collaboration," International Journal of Production Economics, Elsevier, vol. 125(1), pages 22-40, May.
- Jayashankar M. Swaminathan & Thomas R. Nitsch, 2007. "Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point," Interfaces, INFORMS, vol. 37(4), pages 324-333, August.
- David J. Robb & Thomas R. Rohleder, 1996. "An evaluation of scheduling heuristics for dynamic single‐processor scheduling with early/tardy costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(3), pages 349-364, April.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
- Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
- Lindau, Roger A., 1997. "Automatic data capture and its impact on productivity," International Journal of Production Economics, Elsevier, vol. 52(1-2), pages 91-103, October.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
- Ilkyeong Moon & Sanghyup Lee & Moonsoo Shin & Kwangyeol Ryu, 2016. "Evolutionary resource assignment for workload-based production scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 375-388, April.
- K Katsaliaki & N Mustafee & Y K Dwivedi & T Williams & J M Wilson, 2010. "A profile of OR research and practice published in the Journal of the Operational Research Society," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 82-94, January.
- Dong, Yachao & Maravelias, Christos T., 2021. "Terminal inventory level constraints for online production scheduling," European Journal of Operational Research, Elsevier, vol. 295(1), pages 102-117.
- Akturk, M. Selim & Gorgulu, Elif, 1999. "Match-up scheduling under a machine breakdown," European Journal of Operational Research, Elsevier, vol. 112(1), pages 81-97, January.
- Yingling, Jon C. & Goh, Chon-Huat & Ganguli, Rajive, 1999. "Analysis of the twisting department at Superior Cable Corporation: A case study," European Journal of Operational Research, Elsevier, vol. 115(1), pages 19-35, May.
- Stef Moons & Katrien Ramaekers & An Caris & Yasemin Arda, 2018. "Integration of order picking and vehicle routing in a B2C e-commerce context," Flexible Services and Manufacturing Journal, Springer, vol. 30(4), pages 813-843, December.
- Raja Awais Liaqait & Shermeen Hamid & Salman Sagheer Warsi & Azfar Khalid, 2021. "A Critical Analysis of Job Shop Scheduling in Context of Industry 4.0," Sustainability, MDPI, vol. 13(14), pages 1-19, July.
- Wiers, V. C. S., 1997. "A review of the applicability of OR and AI scheduling techniques in practice," Omega, Elsevier, vol. 25(2), pages 145-153, April.
- van Kessel, Paul J. & Freeman, Floris C. & Santos, Bruno F., 2023. "Airline maintenance task rescheduling in a disruptive environment," European Journal of Operational Research, Elsevier, vol. 308(2), pages 605-621.
- Jian Zhang & Guofu Ding & Yisheng Zou & Shengfeng Qin & Jianlin Fu, 2019. "Review of job shop scheduling research and its new perspectives under Industry 4.0," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1809-1830, April.
- Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
- Ruiz, Ruben & Maroto, Concepcion, 2006. "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," European Journal of Operational Research, Elsevier, vol. 169(3), pages 781-800, March.
- Agliari, Anna & Diligenti, Mauro & Zavanella, Lucio, 1995. "Variable priority dispatching rules: An analytical approach," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 51-58, October.
- Ho, Johnny C. & Chang, Yih-Long, 1995. "Minimizing the number of tardy jobs for m parallel machines," European Journal of Operational Research, Elsevier, vol. 84(2), pages 343-355, July.
- Seifert, Ralf W. & Morito, Susumu, 2001. "Cooperative dispatching - exploiting the flexibility of an FMS by means of incremental optimization," European Journal of Operational Research, Elsevier, vol. 129(1), pages 116-133, February.
- Lagodimos, A. G. & Mihiotis, A. N. & Kosmidis, V. C., 2004. "Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations," International Journal of Production Economics, Elsevier, vol. 90(3), pages 345-359, August.
- Ying Zhang & Jayashankar M. Swaminathan, 2020. "Improved Crop Productivity Through Optimized Planting Schedules," Manufacturing & Service Operations Management, INFORMS, vol. 22(6), pages 1165-1180, November.
- Saravanan Kesavan & Bradley R. Staats & Wendell Gilland, 2014. "Volume Flexibility in Services: The Costs and Benefits of Flexible Labor Resources," Management Science, INFORMS, vol. 60(8), pages 1884-1906, August.
- Pflughoeft, K. A. & Hutchinson, G. K. & Nazareth, D. L., 1996. "Intelligent decision support for flexible manufacturing: Design and implementation of a knowledge-based simulator," Omega, Elsevier, vol. 24(3), pages 347-360, June.
- Golenko-Ginzburg, Dimitri & Kesler, Shmuel & Landsman, Zinoviy, 1995. "Industrial job-shop scheduling with random operations and different priorities," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 185-195, August.
- Mili Mehrotra & William Schmidt, 2021. "The Value of Supply Chain Disruption Duration Information," Production and Operations Management, Production and Operations Management Society, vol. 30(9), pages 3015-3035, September.
- Framinan, Jose M. & Ruiz, Rubén, 2010. "Architecture of manufacturing scheduling systems: Literature review and an integrated proposal," European Journal of Operational Research, Elsevier, vol. 205(2), pages 237-246, September.
- Michael J. Fry & Roman Kapuscinski & Tava Lennon Olsen, 2001. "Coordinating Production and Delivery Under a (z, Z)-Type Vendor-Managed Inventory Contract," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 151-173, August.
- Wang, Juite, 2004. "A fuzzy robust scheduling approach for product development projects," European Journal of Operational Research, Elsevier, vol. 152(1), pages 180-194, January.
- Maglaras, Constantinos & Van Mieghem, Jan A., 2005. "Queueing systems with leadtime constraints: A fluid-model approach for admission and sequencing control," European Journal of Operational Research, Elsevier, vol. 167(1), pages 179-207, November.
- Young-Chae Hong & Amy Cohn & Stephen Gorga & Edmond O’Brien & William Pozehl & Jennifer Zank, 2019. "Using Optimization Techniques and Multidisciplinary Collaboration to Solve a Challenging Real-World Residency Scheduling Problem," Interfaces, INFORMS, vol. 49(3), pages 201-212, May.
- Berghman, Lotte & Kergosien, Yannick & Billaut, Jean-Charles, 2023. "A review on integrated scheduling and outbound vehicle routing problems," European Journal of Operational Research, Elsevier, vol. 311(1), pages 1-23.
- Franca, Paulo M. & Mendes, Alexandre & Moscato, Pablo, 2001. "A memetic algorithm for the total tardiness single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 132(1), pages 224-242, July.
- Ersin Körpeoğlu & Zachary Kurtz & Fatma Kılınç-Karzan & Sunder Kekre & Pat A. Basu, 2014. "Business Analytics Assists Transitioning Traditional Medicine to Telemedicine at Virtual Radiologic," Interfaces, INFORMS, vol. 44(4), pages 393-410, August.
- Torres, Nelson & Greivel, Gus & Betz, Joshua & Moreno, Eduardo & Newman, Alexandra & Thomas, Brian, 2024. "Optimizing steel coil production schedules under continuous casting and hot rolling," European Journal of Operational Research, Elsevier, vol. 314(2), pages 496-508.
- Fragnière, Emmanuel & Gondzio, Jacek & Yang, Xi, 2010. "Operations risk management by optimally planning the qualified workforce capacity," European Journal of Operational Research, Elsevier, vol. 202(2), pages 518-527, April.
- Tan, Keah-Choon & Narasimhan, Ram & Rubin, Paul A. & Ragatz, Gary L., 2000. "A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times," Omega, Elsevier, vol. 28(3), pages 313-326, June.
- Graves, Stephen C., 1983. "Scheduling of re-entrant flow shops," Working papers 1438-83., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Barış Ata, 2006. "Dynamic Control of a Multiclass Queue with Thin Arrival Streams," Operations Research, INFORMS, vol. 54(5), pages 876-892, October.
- Victor Portougal & David J. Robb, 2000. "Production Scheduling Theory: Just Where Is It Applicable?," Interfaces, INFORMS, vol. 30(6), pages 64-76, December.
- Agarwal, Anurag & Colak, Selcuk & Jacob, Varghese S. & Pirkul, Hasan, 2006. "Heuristics and augmented neural networks for task scheduling with non-identical machines," European Journal of Operational Research, Elsevier, vol. 175(1), pages 296-317, November.
- Fátima Pilar & Eliana Costa e Silva & Ana Borges, 2023. "Optimizing Vehicle Repairs Scheduling Using Mixed Integer Linear Programming: A Case Study in the Portuguese Automobile Sector," Mathematics, MDPI, vol. 11(11), pages 1-23, June.
- Tan, K. C. & Narasimhan, R., 1997. "Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach," Omega, Elsevier, vol. 25(6), pages 619-634, December.
- Nicolás Álvarez-Gil & Rafael Rosillo & David de la Fuente & Raúl Pino, 2021. "A discrete firefly algorithm for solving the flexible job-shop scheduling problem in a make-to-order manufacturing system," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1353-1374, December.
- Lagodimos, A. G. & Leopoulos, V., 2000. "Greedy heuristic algorithms for manpower shift planning," International Journal of Production Economics, Elsevier, vol. 68(1), pages 95-106, October.
- Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
- Miguel A. González & Juan José Palacios & Camino R. Vela & Alejandro Hernández-Arauzo, 2017. "Scatter search for minimizing weighted tardiness in a single machine scheduling with setups," Journal of Heuristics, Springer, vol. 23(2), pages 81-110, June.