An evaluation of scheduling heuristics for dynamic single‐processor scheduling with early/tardy costs
Author
Abstract
Suggested Citation
DOI: 10.1002/(SICI)1520-6750(199604)43:33.0.CO;2-9
Download full text from publisher
References listed on IDEAS
- Taillard, E., 1990. "Some efficient heuristic methods for the flow shop sequencing problem," European Journal of Operational Research, Elsevier, vol. 47(1), pages 65-74, July.
- Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
- Stephen C. Graves, 1981. "A Review of Production Scheduling," Operations Research, INFORMS, vol. 29(4), pages 646-675, August.
- J. Steve Davis & John J. Kanet, 1993. "Single‐machine scheduling with early and tardy completion costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(1), pages 85-101, February.
- Morton, T.E. & Singh, M., 1988. "Implicit Costs And Prices For Resources With Busy Periods," GSIA Working Papers 88-89-02, Carnegie Mellon University, Tepper School of Business.
- Peng Si Ow & Thomas E. Morton, 1989. "The Single Machine Early/Tardy Problem," Management Science, INFORMS, vol. 35(2), pages 177-191, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
- Schaller, Jeffrey & Valente, Jorge M.S., 2020. "Minimizing total earliness and tardiness in a nowait flow shop," International Journal of Production Economics, Elsevier, vol. 224(C).
- Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
- Jaw‐Yeh Chen & Sheng‐Fuu Lin, 2002. "Minimizing weighted earliness and tardiness penalties in single‐machine scheduling with idle time permitted," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(8), pages 760-780, December.
- James, R. J. W. & Buchanan, J. T., 1997. "A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem," European Journal of Operational Research, Elsevier, vol. 102(3), pages 513-527, November.
- N Nekoiemehr & G Moslehi, 2011. "Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1403-1412, July.
- Franca, Paulo M. & Mendes, Alexandre & Moscato, Pablo, 2001. "A memetic algorithm for the total tardiness single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 132(1), pages 224-242, July.
- Valente, Jorge M.S. & Alves, Rui A.F.S., 2007. "Heuristics for the early/tardy scheduling problem with release dates," International Journal of Production Economics, Elsevier, vol. 106(1), pages 261-274, March.
- repec:dgr:rugsom:95a37 is not listed on IDEAS
- John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
- Mazzini, Renata & Armentano, Vinicius A., 2001. "A heuristic for single machine scheduling with early and tardy costs," European Journal of Operational Research, Elsevier, vol. 128(1), pages 129-146, January.
- Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
- Kate, H.A. ten & Wijngaard, J. & Zijm, W.H.M., 1995. "Minimizing weighted total earliness, total tardiness and setup costs," Research Report 95A37, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Ventura, Jose A. & Radhakrishnan, Sanjay, 2003. "Single machine scheduling with symmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 144(3), pages 598-612, February.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Koulamas, Christos, 1996. "Single-machine scheduling with time windows and earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 91(1), pages 190-202, May.
- Victor Portougal & David J. Robb, 2000. "Production Scheduling Theory: Just Where Is It Applicable?," Interfaces, INFORMS, vol. 30(6), pages 64-76, December.
- James, R. J. W. & Buchanan, J. T., 1998. "Performance enhancements to tabu search for the early/tardy scheduling problem," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 254-265, April.
- George Li, 1997. "Single machine earliness and tardiness scheduling," European Journal of Operational Research, Elsevier, vol. 96(3), pages 546-558, February.
- Ho, Johnny C. & Chang, Yih-Long, 1995. "Minimizing the number of tardy jobs for m parallel machines," European Journal of Operational Research, Elsevier, vol. 84(2), pages 343-355, July.
- Pathumnakul, Supachai & Egbelu, Pius J., 2005. "Algorithm for minimizing weighted earliness penalty in single-machine problem," European Journal of Operational Research, Elsevier, vol. 161(3), pages 780-796, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:43:y:1996:i:3:p:349-364. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.