IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v22y1976i11p1268-1272.html
   My bibliography  Save this item

Maximal Closure of a Graph and Applications to Combinatorial Problems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Cornillier, Fabien, 2020. "A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application," Omega, Elsevier, vol. 94(C).
  2. J. Spouge & H. Wan & W.J. Wilbur, 2003. "Least Squares Isotonic Regression in Two Dimensions," Journal of Optimization Theory and Applications, Springer, vol. 117(3), pages 585-605, June.
  3. Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
  4. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan & Asad, Mohammad Waqar Ali, 2020. "Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation," Resources Policy, Elsevier, vol. 66(C).
  5. Csapó, Gergely & Müller, Rudolf, 2013. "Optimal mechanism design for the private supply of a public good," Games and Economic Behavior, Elsevier, vol. 80(C), pages 229-242.
  6. ,, 2014. "Persuasion and dynamic communication," Theoretical Economics, Econometric Society, vol. 9(1), January.
  7. Dorit Hochbaum, 2007. "Complexity and algorithms for nonlinear optimization problems," Annals of Operations Research, Springer, vol. 153(1), pages 257-296, September.
  8. José R. Correa & Andreas S. Schulz, 2005. "Single-Machine Scheduling with Precedence Constraints," Mathematics of Operations Research, INFORMS, vol. 30(4), pages 1005-1021, November.
  9. Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan, 2021. "Open-pit mining complex optimization under uncertainty with integrated cut-off grade based destination policies," Resources Policy, Elsevier, vol. 70(C).
  10. Dorit S. Hochbaum, 2004. "50th Anniversary Article: Selection, Provisioning, Shared Fixed Costs, Maximum Closure, and Implications on Algorithmic Methods Today," Management Science, INFORMS, vol. 50(6), pages 709-723, June.
  11. Chatterjee, Snehamoy & Sethi, Manas Ranjan & Asad, Mohammad Waqar Ali, 2016. "Production phase and ultimate pit limit design under commodity price uncertainty," European Journal of Operational Research, Elsevier, vol. 248(2), pages 658-667.
  12. Whittle, D. & Brazil, M. & Grossman, P.A. & Rubinstein, J.H. & Thomas, D.A., 2018. "Combined optimisation of an open-pit mine outline and the transition depth to underground mining," European Journal of Operational Research, Elsevier, vol. 268(2), pages 624-634.
  13. Domenico Moramarco & Umutcan Salman, 2023. "Equal opportunities in many-to-one matching markets," Working Papers 649, ECINEQ, Society for the Study of Economic Inequality.
  14. Thomas Schmitt & Bruce Faaland, 2004. "Scheduling recurrent construction," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(8), pages 1102-1128, December.
  15. Dorit S. Hochbaum & Anna Chen, 2000. "Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem," Operations Research, INFORMS, vol. 48(6), pages 894-914, December.
  16. Gonczarowski, Yannai A. & Nisan, Noam & Ostrovsky, Rafail & Rosenbaum, Will, 2019. "A stable marriage requires communication," Games and Economic Behavior, Elsevier, vol. 118(C), pages 626-647.
  17. Hochbaum, Dorit S., 2002. "Solving integer programs over monotone inequalities in three variables: A framework for half integrality and good approximations," European Journal of Operational Research, Elsevier, vol. 140(2), pages 291-321, July.
  18. Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni, 2023. "A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context," Resources Policy, Elsevier, vol. 83(C).
  19. Madziwa, Lawrence & Pillalamarry, Mallikarjun & Chatterjee, Snehamoy, 2023. "Integrating stochastic mine planning model with ARDL commodity price forecasting," Resources Policy, Elsevier, vol. 85(PB).
  20. Dorit S. Hochbaum, 2003. "Efficient Algorithms for the Inverse Spanning-Tree Problem," Operations Research, INFORMS, vol. 51(5), pages 785-797, October.
  21. Joseph G. Szmerekovsky & George L. Vairaktarakis, 2006. "Maximizing project cash availability," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(4), pages 272-284, June.
  22. François Margot & Maurice Queyranne & Yaoguang Wang, 2003. "Decompositions, Network Flows, and a Precedence Constrained Single-Machine Scheduling Problem," Operations Research, INFORMS, vol. 51(6), pages 981-992, December.
  23. Esmaeili, Ahmadreza & Hamidi, Jafar Khademi & Mousavi, Amin, 2023. "Determination of sublevel stoping layout using a network flow algorithm and the MRMR classification system," Resources Policy, Elsevier, vol. 80(C).
  24. Gary Kochenberger & Jin-Kao Hao & Fred Glover & Mark Lewis & Zhipeng Lü & Haibo Wang & Yang Wang, 2014. "The unconstrained binary quadratic programming problem: a survey," Journal of Combinatorial Optimization, Springer, vol. 28(1), pages 58-81, July.
  25. Queyranne, M. & Wolsey, L.A., 2015. "Modeling poset convex subsets," LIDAM Discussion Papers CORE 2015049, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  26. Zhi-Ming Chen & Cheng-Hsiung Lee & Hung-Lin Lai, 2022. "Speedup the optimization of maximal closure of a node-weighted directed acyclic graph," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1413-1437, December.
  27. Nancel-Penard, Pierre & Morales, Nelson & Cornillier, Fabien, 2022. "A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1088-1099.
  28. Yasrebi, Amir Bijan & Hezarkhani, Ardeshir & Afzal, Peyman, 2017. "Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection," Resources Policy, Elsevier, vol. 53(C), pages 384-393.
  29. Zhang, Jian & Dimitrakopoulos, Roussos G., 2017. "A dynamic-material-value-based decomposition method for optimizing a mineral value chain with uncertainty," European Journal of Operational Research, Elsevier, vol. 258(2), pages 617-625.
  30. Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Peypouquet, Juan & Reyes, Patricio, 2016. "Aggregation heuristic for the open-pit block scheduling problem," European Journal of Operational Research, Elsevier, vol. 249(3), pages 1169-1177.
  31. Underwood, Robert & Tolwinski, Boleslaw, 1998. "A mathematical programming viewpoint for solving the ultimate pit problem," European Journal of Operational Research, Elsevier, vol. 107(1), pages 96-107, May.
  32. Dorit S. Hochbaum, 2008. "The Pseudoflow Algorithm: A New Algorithm for the Maximum-Flow Problem," Operations Research, INFORMS, vol. 56(4), pages 992-1009, August.
  33. Rostami, Salim & Creemers, Stefan & Wei, Wenchao & Leus, Roel, 2019. "Sequential testing of n-out-of-n systems: Precedence theorems and exact methods," European Journal of Operational Research, Elsevier, vol. 274(3), pages 876-885.
  34. Pavlos Eirinakis & Dimitrios Magos & Ioannis Mourtos & Panayiotis Miliotis, 2012. "Finding All Stable Pairs and Solutions to the Many-to-Many Stable Matching Problem," INFORMS Journal on Computing, INFORMS, vol. 24(2), pages 245-259, May.
  35. Devendra Joshi & Premkumar Chithaluru & Aman Singh & Arvind Yadav & Dalia H. Elkamchouchi & Jose Breñosa & Divya Anand, 2022. "An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value," Mathematics, MDPI, vol. 10(21), pages 1-22, November.
  36. M. Vanhoucke, 2006. "An efficient hybrid search algorithm for various optimization problems," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 06/365, Ghent University, Faculty of Economics and Business Administration.
  37. Bala G. Chandran & Dorit S. Hochbaum, 2009. "A Computational Study of the Pseudoflow and Push-Relabel Algorithms for the Maximum Flow Problem," Operations Research, INFORMS, vol. 57(2), pages 358-376, April.
  38. Bradley Sturt, 2021. "A nonparametric algorithm for optimal stopping based on robust optimization," Papers 2103.03300, arXiv.org, revised Mar 2023.
  39. Madziwa, Lawrence & Pillalamarry, Mallikarjun & Chatterjee, Snehamoy, 2023. "Integrating flexibility in open pit mine planning to survive commodity price decline," Resources Policy, Elsevier, vol. 81(C).
  40. Buelga Díaz, Arturo & Diego Álvarez, Isidro & Castañón Fernández, César & Krzemień, Alicja & Iglesias Rodríguez, Francisco Javier, 2021. "Calculating ultimate pit limits and determining pushbacks in open-pit mining projects," Resources Policy, Elsevier, vol. 72(C).
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.