A mathematical programming viewpoint for solving the ultimate pit problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jean-Claude Picard, 1976. "Maximal Closure of a Graph and Applications to Combinatorial Problems," Management Science, INFORMS, vol. 22(11), pages 1268-1272, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Noriega, Roberto & Pourrahimian, Yashar & Ben-Awuah, Eugene, 2020. "A two-step mathematical programming framework for undercut horizon optimization in block caving mines," Resources Policy, Elsevier, vol. 65(C).
- Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Cornillier, Fabien, 2020. "A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application," Omega, Elsevier, vol. 94(C).
- Mark Kuchta & Alexandra Newman & Erkan Topal, 2004. "Implementing a Production Schedule at LKAB's Kiruna Mine," Interfaces, INFORMS, vol. 34(2), pages 124-134, April.
- Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
- Samavati, Mehran & Essam, Daryl & Nehring, Micah & Sarker, Ruhul, 2017. "A local branching heuristic for the open pit mine production scheduling problem," European Journal of Operational Research, Elsevier, vol. 257(1), pages 261-271.
- O’Sullivan, Dónal & Newman, Alexandra, 2015. "Optimization-based heuristics for underground mine scheduling," European Journal of Operational Research, Elsevier, vol. 241(1), pages 248-259.
- Jurdziak, Leszek, 2006. "Negocjacje pomiędzy kopalnią węgla brunatnego a elektrownią jako kooperacyjna, dwuetapowa gra dwuosobowa o sumie niezerowej," MPRA Paper 478, University Library of Munich, Germany, revised 20 Feb 2000.
- M Kumral & P A Dowd, 2005. "A simulated annealing approach to mine production scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(8), pages 922-930, August.
- W. Lambert & A. Newman, 2014. "Tailored Lagrangian Relaxation for the open pit block sequencing problem," Annals of Operations Research, Springer, vol. 222(1), pages 419-438, November.
- Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Alexandra Newman, 2013. "MineLib: a library of open pit mining problems," Annals of Operations Research, Springer, vol. 206(1), pages 93-114, July.
- Peter McKenzie & Alexandra M. Newman & Luis Tenorio, 2008. "Front Range Aggregates Optimizes Feeder Movements at Its Quarry," Interfaces, INFORMS, vol. 38(6), pages 436-447, December.
- Burdett, R.L. & Kozan, E., 2014. "An integrated approach for earthwork allocation, sequencing and routing," European Journal of Operational Research, Elsevier, vol. 238(3), pages 741-759.
- Alexandra M. Newman & Enrique Rubio & Rodrigo Caro & Andrés Weintraub & Kelly Eurek, 2010. "A Review of Operations Research in Mine Planning," Interfaces, INFORMS, vol. 40(3), pages 222-245, June.
- King, Barry & Goycoolea, Marcos & Newman, A., 2017. "Optimizing the open pit-to-underground mining transition," European Journal of Operational Research, Elsevier, vol. 257(1), pages 297-309.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
- Chatterjee, Snehamoy & Sethi, Manas Ranjan & Asad, Mohammad Waqar Ali, 2016. "Production phase and ultimate pit limit design under commodity price uncertainty," European Journal of Operational Research, Elsevier, vol. 248(2), pages 658-667.
- Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni, 2023. "A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context," Resources Policy, Elsevier, vol. 83(C).
- Domenico Moramarco & Umutcan Salman, 2023. "Equal opportunities in many-to-one matching markets," Working Papers 649, ECINEQ, Society for the Study of Economic Inequality.
- Dorit S. Hochbaum, 2003. "Efficient Algorithms for the Inverse Spanning-Tree Problem," Operations Research, INFORMS, vol. 51(5), pages 785-797, October.
- Esmaeili, Ahmadreza & Hamidi, Jafar Khademi & Mousavi, Amin, 2023. "Determination of sublevel stoping layout using a network flow algorithm and the MRMR classification system," Resources Policy, Elsevier, vol. 80(C).
- Nancel-Penard, Pierre & Morales, Nelson & Cornillier, Fabien, 2022. "A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: An application to the open-pit mine block sequencing problem," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1088-1099.
- Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Cornillier, Fabien, 2020. "A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application," Omega, Elsevier, vol. 94(C).
- Whittle, D. & Brazil, M. & Grossman, P.A. & Rubinstein, J.H. & Thomas, D.A., 2018. "Combined optimisation of an open-pit mine outline and the transition depth to underground mining," European Journal of Operational Research, Elsevier, vol. 268(2), pages 624-634.
- Madziwa, Lawrence & Pillalamarry, Mallikarjun & Chatterjee, Snehamoy, 2023. "Integrating stochastic mine planning model with ARDL commodity price forecasting," Resources Policy, Elsevier, vol. 85(PB).
- Dorit S. Hochbaum & Anna Chen, 2000. "Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem," Operations Research, INFORMS, vol. 48(6), pages 894-914, December.
- Joseph G. Szmerekovsky & George L. Vairaktarakis, 2006. "Maximizing project cash availability," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(4), pages 272-284, June.
- Madziwa, Lawrence & Pillalamarry, Mallikarjun & Chatterjee, Snehamoy, 2023. "Integrating flexibility in open pit mine planning to survive commodity price decline," Resources Policy, Elsevier, vol. 81(C).
- Csapó, Gergely & Müller, Rudolf, 2013.
"Optimal mechanism design for the private supply of a public good,"
Games and Economic Behavior, Elsevier, vol. 80(C), pages 229-242.
- Csapó, G. & Müller, R.J., 2012. "Optimal mechanism design for the private supply of a public good," Research Memorandum 037, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Gonczarowski, Yannai A. & Nisan, Noam & Ostrovsky, Rafail & Rosenbaum, Will, 2019.
"A stable marriage requires communication,"
Games and Economic Behavior, Elsevier, vol. 118(C), pages 626-647.
- Yannai A. Gonczarowski & Noam Nisan, 2014. "A Stable Marriage Requires Communication," Discussion Paper Series dp667, The Federmann Center for the Study of Rationality, the Hebrew University, Jerusalem.
- Hochbaum, Dorit S., 2002. "Solving integer programs over monotone inequalities in three variables: A framework for half integrality and good approximations," European Journal of Operational Research, Elsevier, vol. 140(2), pages 291-321, July.
- Buelga Díaz, Arturo & Diego Álvarez, Isidro & Castañón Fernández, César & Krzemień, Alicja & Iglesias Rodríguez, Francisco Javier, 2021. "Calculating ultimate pit limits and determining pushbacks in open-pit mining projects," Resources Policy, Elsevier, vol. 72(C).
- Paithankar, Amol & Chatterjee, Snehamoy & Goodfellow, Ryan & Asad, Mohammad Waqar Ali, 2020. "Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation," Resources Policy, Elsevier, vol. 66(C).
- Dorit Hochbaum, 2007. "Complexity and algorithms for nonlinear optimization problems," Annals of Operations Research, Springer, vol. 153(1), pages 257-296, September.
- Yasrebi, Amir Bijan & Hezarkhani, Ardeshir & Afzal, Peyman, 2017. "Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection," Resources Policy, Elsevier, vol. 53(C), pages 384-393.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:107:y:1998:i:1:p:96-107. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.