IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v15y1969i9p506-527.html
   My bibliography  Save this item

A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
  2. Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
  3. Bruno, Giuseppe & Genovese, Andrea & Piccolo, Carmela, 2014. "The capacitated Lot Sizing model: A powerful tool for logistics decision making," International Journal of Production Economics, Elsevier, vol. 155(C), pages 380-390.
  4. Iara Ciurria-Infosino & Daniel Granot & Frieda Granot & Arthur F. Veinott, 2015. "Multicommodity Production Planning: Qualitative Analysis and Applications," Manufacturing & Service Operations Management, INFORMS, vol. 17(4), pages 589-607, October.
  5. Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
  6. S. Selcuk Erenguc, 1988. "Multiproduct dynamic lot‐sizing model with coordinated replenishments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(1), pages 1-22, February.
  7. Jinwen Ou, 2012. "Economic lot sizing with constant capacities and concave inventory costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(7), pages 497-501, October.
  8. Gutierrez, J. & Puerto, J. & Sicilia, J., 2004. "The multiscenario lot size problem with concave costs," European Journal of Operational Research, Elsevier, vol. 156(1), pages 162-182, July.
  9. Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
  10. Romeijn, H.E. & van den Heuvel, W.J. & Geunes, J., 2012. "Mitigating the Cost of Anarchy in Supply Chain Systems," Econometric Institute Research Papers EI 2012-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  11. Wu, Tao & Shi, Leyuan & Geunes, Joseph & AkartunalI, Kerem, 2011. "An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging," European Journal of Operational Research, Elsevier, vol. 214(2), pages 428-441, October.
  12. VAN VYVE, Mathieu & WOLSEY, Laurence & YAMAN, Hande, 2012. "Relaxations for two-level multi-item lot-sizing problem," LIDAM Discussion Papers CORE 2012031, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
  13. Chu, Chi-Leung & Leon, V. Jorge, 2009. "Scalable methodology for supply chain inventory coordination with private information," European Journal of Operational Research, Elsevier, vol. 195(1), pages 262-279, May.
  14. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
  15. Johansen, Soren Glud, 1999. "Lot sizing for varying degrees of demand uncertainty," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 405-414, March.
  16. Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
  17. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
  18. Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
  19. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
  20. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
  21. Joel A. Shapiro & Warren B. Powell, 2006. "A Metastrategy for Large-Scale Resource Management Based on Informational Decomposition," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 43-60, February.
  22. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P.M. Wagelmans, 2002. "Polynomial Time Algorithms for Some Multi-Level Lot-Sizing Problems with Production Capacities," Tinbergen Institute Discussion Papers 02-066/4, Tinbergen Institute.
  23. Arlen Dean & Amirhossein Meisami & Henry Lam & Mark P. Van Oyen & Christopher Stromblad & Nick Kastango, 2022. "Quantile regression forests for individualized surgery scheduling," Health Care Management Science, Springer, vol. 25(4), pages 682-709, December.
  24. Sun, Minghe & Aronson, Jay E. & McKeown, Patrick G. & Drinka, Dennis, 1998. "A tabu search heuristic procedure for the fixed charge transportation problem," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 441-456, April.
  25. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
  26. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
  27. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
  28. Gencer, Cevriye & Erol, Serpil & Erol, Yalcin, 1999. "A decision network algorithm for multi-stage dynamic lot sizing problems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 281-285, September.
  29. Hüseyin Güden & Haldun Süral, 2017. "A polynomial algorithm for the earthwork allocation problem with borrow and waste site selection," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(9), pages 1085-1093, September.
  30. Michael Bastian, 1992. "A perfect lot‐tree procedure for the discounted dynamic lot‐size problem with speculation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 651-668, August.
  31. Aksen, Deniz & Altinkemer, Kemal & Chand, Suresh, 2003. "The single-item lot-sizing problem with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 147(3), pages 558-566, June.
  32. Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
  33. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
  34. V S Tonaki & F M B Toledo, 2010. "An approach for solving the lot-sizing problem of a market-driven foundry," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 108-114, January.
  35. Jian Yang & Boaz Golany & Gang Yu, 2005. "A concave‐cost production planning problem with remanufacturing options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 443-458, August.
  36. Drechsel, J. & Kimms, A., 2010. "Computing core allocations in cooperative games with an application to cooperative procurement," International Journal of Production Economics, Elsevier, vol. 128(1), pages 310-321, November.
  37. Mobini, Zahra & van den Heuvel, Wilco & Wagelmans, Albert, 2019. "Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information," European Journal of Operational Research, Elsevier, vol. 277(2), pages 542-560.
  38. Luis A. Guardiola & Ana Meca & Justo Puerto, 2022. "The effect of consolidated periods in heterogeneous lot-sizing games," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 30(2), pages 380-404, July.
  39. Joseph Geunes & H. Edwin Romeijn & Kevin Taaffe, 2006. "Requirements Planning with Pricing and Order Selection Flexibility," Operations Research, INFORMS, vol. 54(2), pages 394-401, April.
  40. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
  41. Martel, Alain & Diaby, Moustapha & Boctor, Fayez, 1995. "Multiple items procurement under stochastic nonstationary demands," European Journal of Operational Research, Elsevier, vol. 87(1), pages 74-92, November.
  42. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
  43. Ozelkan, Ertunga C. & Cakanyildirim, Metin, 2007. "Resource downgrading," European Journal of Operational Research, Elsevier, vol. 177(1), pages 572-590, February.
  44. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
  45. Kis, Tamás & Kovács, András, 2013. "Exact solution approaches for bilevel lot-sizing," European Journal of Operational Research, Elsevier, vol. 226(2), pages 237-245.
  46. Haugen, Kjetil K. & Lokketangen, Arne & Woodruff, David L., 2001. "Progressive hedging as a meta-heuristic applied to stochastic lot-sizing," European Journal of Operational Research, Elsevier, vol. 132(1), pages 116-122, July.
  47. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
  48. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2019. "Two-echelon lot-sizing with asymmetric information and continuous type space," Omega, Elsevier, vol. 87(C), pages 158-176.
  49. Yale T. Herer & Michal Tzur, 2001. "The dynamic transshipment problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 386-408, August.
  50. Egri, Péter & Kis, Tamás & Kovács, András & Váncza, József, 2014. "An inverse economic lot-sizing approach to eliciting supplier cost parameters," International Journal of Production Economics, Elsevier, vol. 149(C), pages 80-88.
  51. Joe Naoum-Sawaya & Bissan Ghaddar, 2017. "Cutting plane approach for the maximum flow interdiction problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1553-1569, December.
  52. Yuchen Jiang & Juan Xu & Siqian Shen & Cong Shi, 2017. "Production planning problems with joint service-level guarantee: a computational study," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 38-58, January.
  53. Ho-Yin Mak & Ying Rong & Jiawei Zhang, 2015. "Appointment Scheduling with Limited Distributional Information," Management Science, INFORMS, vol. 61(2), pages 316-334, February.
  54. Tempelmeier, Horst, 2007. "On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints," European Journal of Operational Research, Elsevier, vol. 181(1), pages 184-194, August.
  55. Gautier Stauffer, 2018. "Approximation algorithms for k-echelon extensions of the one warehouse multi-retailer problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 88(3), pages 445-473, December.
  56. Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
  57. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  58. Jesus Cunha & Rafael Melo, 2016. "On reformulations for the one-warehouse multi-retailer problem," Annals of Operations Research, Springer, vol. 238(1), pages 99-122, March.
  59. S. Çetinkaya & M. Parlar, 1998. "Nonlinear Programming Analysis to Estimate Implicit Inventory Backorder Costs," Journal of Optimization Theory and Applications, Springer, vol. 97(1), pages 71-92, April.
  60. Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
  61. A. Pessoa & R. Sadykov & E. Uchoa & F. Vanderbeck, 2018. "Automation and Combination of Linear-Programming Based Stabilization Techniques in Column Generation," INFORMS Journal on Computing, INFORMS, vol. 30(2), pages 339-360, May.
  62. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
  63. Kajjoune, Oussama & Aouam, Tarik & Zouadi, Tarik & Ranjan, Ravi Prakash, 2023. "Dynamic lot-sizing in a two-stage supply chain with liquidity constraints and financing options," International Journal of Production Economics, Elsevier, vol. 258(C).
  64. Luis A. Guardiola & Ana Meca & Justo Puerto, 2021. "Unitary Owen Points in Cooperative Lot-Sizing Models with Backlogging," Mathematics, MDPI, vol. 9(8), pages 1-19, April.
  65. Liberopoulos, George & Tsikis, Isidoros & Delikouras, Stefanos, 2010. "Backorder penalty cost coefficient "b": What could it be?," International Journal of Production Economics, Elsevier, vol. 123(1), pages 166-178, January.
  66. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
  67. Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
  68. Hwang, Hark-Chin & Kang, Jangha, 2016. "Two-phase algorithm for the lot-sizing problem with backlogging for stepwise transportation cost without speculative motives," Omega, Elsevier, vol. 59(PB), pages 238-250.
  69. Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
  70. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  71. Jesus O. Cunha & Rafael A. Melo, 2016. "On reformulations for the one-warehouse multi-retailer problem," Annals of Operations Research, Springer, vol. 238(1), pages 99-122, March.
  72. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
  73. Oğuz Solyalı & Haldun Süral, 2012. "The one-warehouse multi-retailer problem: reformulation, classification, and computational results," Annals of Operations Research, Springer, vol. 196(1), pages 517-541, July.
  74. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
  75. Liu, X. & Tu, Yl., 2008. "Production planning with limited inventory capacity and allowed stockout," International Journal of Production Economics, Elsevier, vol. 111(1), pages 180-191, January.
  76. Kovács, András & Egri, Péter & Kis, Tamás & Váncza, József, 2013. "Inventory control in supply chains: Alternative approaches to a two-stage lot-sizing problem," International Journal of Production Economics, Elsevier, vol. 143(2), pages 385-394.
  77. Geunes, Joseph & Romeijn, H. Edwin & van den Heuvel, Wilco, 2016. "Improving the efficiency of decentralized supply chains with fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 252(3), pages 815-828.
  78. Elhafsi, Mohsen, 2002. "A production planning model for an unreliable production facility: Case of finite horizon and single demand," European Journal of Operational Research, Elsevier, vol. 143(1), pages 94-114, November.
  79. Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.
  80. Gruson, Matthieu & Cordeau, Jean-François & Jans, Raf, 2018. "The impact of service level constraints in deterministic lot sizing with backlogging," Omega, Elsevier, vol. 79(C), pages 91-103.
  81. Blanchini, Franco & Rinaldi, Franca & Ukovich, Walter, 1996. "A dynamic game model for distribution problems with non-stochastic uncertainty," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 479-487, August.
  82. Voros, Jozsef, 2002. "On the relaxation of multi-level dynamic lot-sizing models," International Journal of Production Economics, Elsevier, vol. 77(1), pages 53-61, May.
  83. Og̀uz Solyalı & Haldun Süral & Meltem Denizel, 2010. "The one‐warehouse multiretailer problem with an order‐up‐to level inventory policy," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(7), pages 653-666, October.
  84. Hwang, Hark-Chin & Kang, Jangha, 2020. "The two-level lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 90(C).
  85. Gerald Brown & Joseph Keegan & Brian Vigus & Kevin Wood, 2001. "The Kellogg Company Optimizes Production, Inventory, and Distribution," Interfaces, INFORMS, vol. 31(6), pages 1-15, December.
  86. Chen, Zhen & Rossi, Roberto, 2021. "A dynamic ordering policy for a stochastic inventory problem with cash constraints," Omega, Elsevier, vol. 102(C).
  87. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
  88. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
  89. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
  90. Awi Federgruen & Michal Tzur, 1999. "Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 463-486, August.
  91. Merzifonluoglu, Yasemin & Geunes, Joseph, 2006. "Uncapacitated production and location planning models with demand fulfillment flexibility," International Journal of Production Economics, Elsevier, vol. 102(2), pages 199-216, August.
  92. Bhattacharjee, Sudip & Ramesh, R., 2000. "A multi-period profit maximizing model for retail supply chain management: An integration of demand and supply-side mechanisms," European Journal of Operational Research, Elsevier, vol. 122(3), pages 584-601, May.
  93. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.