IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v68y2020i2p534-551.html
   My bibliography  Save this article

Multiechelon Lot Sizing: New Complexities and Inequalities

Author

Listed:
  • Ming Zhao

    (Lerner College of Business and Economics, University of Delaware, Newark, Delaware 19716)

  • Minjiao Zhang

    (Department of Economics, Finance, and Quantitative Analysis, Michael J. Coles College of Business, Kennesaw State University, Kennesaw, Georgia 30144)

Abstract

We study a multiechelon lot-sizing problem for a serial supply chain that consists of a production level and several transportation levels, where the demands can exist in the production echelon as well as in any transportation echelons. With the presence of stationary production capacity and general cost functions, our model integrates production, inventory, and transportation decisions and generalizes existing literature on many multiechelon lot-sizing models. First, we answer an open question in the literature by showing that multiechelon lot sizing with intermediate demands (MLS) is NP-hard. Second, we develop polynomial time algorithms for both uncapacitated and capacitated MLS with a fixed number of echelons. The run times of our algorithms improve on those of many known algorithms for different MLS models. Third, we present families of valid inequalities for MLS that generalize known inequalities. For the uncapacitated case, we develop a polynomial-time separation algorithm and efficient separation heuristics. Finally, we demonstrate the effectiveness of a branch-and-cut algorithm using proposed inequalities to solve large multi-item MLS problems.

Suggested Citation

  • Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
  • Handle: RePEc:inm:oropre:v:68:y:2020:i:2:p:534-551
    DOI: 10.1287/opre.2019.1867
    as

    Download full text from publisher

    File URL: https://doi.org/10.1287/opre.2019.1867
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.2019.1867?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Francesco Gaglioppa & Lisa A. Miller & Saif Benjaafar, 2008. "Multitask and Multistage Production Planning and Scheduling for Process Industries," Operations Research, INFORMS, vol. 56(4), pages 1010-1025, August.
    2. Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
    3. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
    4. Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
    5. Willard I. Zangwill, 1969. "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach," Management Science, INFORMS, vol. 15(9), pages 506-527, May.
    6. GÜNLÜK, Oktay & POCHET, Yves, 2001. "Mixing mixed-integer inequalities," LIDAM Reprints CORE 1504, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    7. Michael Florian & Morton Klein, 1971. "Deterministic Production Planning with Concave Costs and Capacity Constraints," Management Science, INFORMS, vol. 18(1), pages 12-20, September.
    8. POCHET, Yves & WOLSEY, Laurence A., 1993. "Lot-sizing with constant batches: formulation and valid inequalities," LIDAM Reprints CORE 1066, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    9. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
    10. Ioannis Fragkos & Zeger Degraeve & Bert De Reyck, 2016. "A Horizon Decomposition Approach for the Capacitated Lot-Sizing Problem with Setup Times," INFORMS Journal on Computing, INFORMS, vol. 28(3), pages 465-482, August.
    11. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    12. Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
    13. Stephen F. Love, 1972. "A Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 18(5-Part-1), pages 327-338, January.
    14. Yves Pochet & Laurence A. Wolsey, 1993. "Lot-Sizing with Constant Batches: Formulation and Valid Inequalities," Mathematics of Operations Research, INFORMS, vol. 18(4), pages 767-785, November.
    15. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
    16. VAN VYVE, Mathieu & WOLSEY, Laurence A & YAMAN, Hande, 2014. "Relaxations for two-level multi-item lot-sizing problems," LIDAM Reprints CORE 2611, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    17. BARANY, Imre & VAN ROY, Tony & WOLSEY, Laurence A., 1984. "Uncapacitated lot-sizing: the convex hull of solutions," LIDAM Reprints CORE 605, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    18. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
    19. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
    20. Rardin, Ronald L. & Wolsey, Laurence A., 1993. "Valid inequalities and projecting the multicommodity extended formulation for uncapacitated fixed charge network flow problems," European Journal of Operational Research, Elsevier, vol. 71(1), pages 95-109, November.
    21. Awi Federgruen & Michal Tzur, 1991. "A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time," Management Science, INFORMS, vol. 37(8), pages 909-925, August.
    22. MELO, Rafael A. & WOLSEY, Laurence A., 2010. "Uncapacitated two-level lot-sizing," LIDAM Reprints CORE 2235, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    23. Alok Aggarwal & James K. Park, 1993. "Improved Algorithms for Economic Lot Size Problems," Operations Research, INFORMS, vol. 41(3), pages 549-571, June.
    24. M. Florian & J. K. Lenstra & A. H. G. Rinnooy Kan, 1980. "Deterministic Production Planning: Algorithms and Complexity," Management Science, INFORMS, vol. 26(7), pages 669-679, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Silva, Eduardo M. & Melega, Gislaine M. & Akartunalı, Kerem & de Araujo, Silvio A., 2023. "Formulations and theoretical analysis of the one-dimensional multi-period cutting stock problem with setup cost," European Journal of Operational Research, Elsevier, vol. 304(2), pages 443-460.
    2. Jing, Fuying & Chao, Xiangrui, 2022. "Forecast horizons for a two-echelon dynamic lot-sizing problem," Omega, Elsevier, vol. 110(C).
    3. Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    2. Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
    3. Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
    4. Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
    5. Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
    6. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    7. Hwang, Hark-Chin & Kang, Jangha, 2016. "Two-phase algorithm for the lot-sizing problem with backlogging for stepwise transportation cost without speculative motives," Omega, Elsevier, vol. 59(PB), pages 238-250.
    8. Hark-Chin Hwang, 2010. "Economic Lot-Sizing for Integrated Production and Transportation," Operations Research, INFORMS, vol. 58(2), pages 428-444, April.
    9. Hark-Chin Hwang, 2009. "Inventory Replenishment and Inbound Shipment Scheduling Under a Minimum Replenishment Policy," Transportation Science, INFORMS, vol. 43(2), pages 244-264, May.
    10. Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.
    11. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
    12. VAN VYVE, Mathieu & WOLSEY, Laurence & YAMAN, Hande, 2012. "Relaxations for two-level multi-item lot-sizing problem," LIDAM Discussion Papers CORE 2012031, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    13. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
    14. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
    15. Alper Atamtürk & Dorit S. Hochbaum, 2001. "Capacity Acquisition, Subcontracting, and Lot Sizing," Management Science, INFORMS, vol. 47(8), pages 1081-1100, August.
    16. Hwang, Hark-Chin & Kang, Jangha, 2020. "The two-level lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 90(C).
    17. Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
    18. Farhat, Mlouka & Akbalik, Ayse & Hadj-Alouane, Atidel B. & Sauer, Nathalie, 2019. "Lot sizing problem with batch ordering under periodic buyback contract and lost sales," International Journal of Production Economics, Elsevier, vol. 208(C), pages 500-511.
    19. Mathieu Van Vyve, 2007. "Algorithms for Single-Item Lot-Sizing Problems with Constant Batch Size," Mathematics of Operations Research, INFORMS, vol. 32(3), pages 594-613, August.
    20. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:68:y:2020:i:2:p:534-551. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.