IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v87y1995i1p132-141.html
   My bibliography  Save this article

Setup cost stability region for the multi-level dynamic lot sizing problem

Author

Listed:
  • Voros, Jozsef

Abstract

No abstract is available for this item.

Suggested Citation

  • Voros, Jozsef, 1995. "Setup cost stability region for the multi-level dynamic lot sizing problem," European Journal of Operational Research, Elsevier, vol. 87(1), pages 132-141, November.
  • Handle: RePEc:eee:ejores:v:87:y:1995:i:1:p:132-141
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(95)00118-A
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Richter, Knut, 1987. "Stability of the constant cost dynamic lot size model," European Journal of Operational Research, Elsevier, vol. 31(1), pages 61-65, July.
    2. Suresh Chand & Suresh P. Sethi, 1990. "A Dynamic Lot Sizing Model with Learning in Setups," Operations Research, INFORMS, vol. 38(4), pages 644-655, August.
    3. Richter, Knut & Voros, Jozsef, 1989. "On the stability region for multi-level inventory problems," European Journal of Operational Research, Elsevier, vol. 41(2), pages 169-173, July.
    4. Willard I. Zangwill, 1969. "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach," Management Science, INFORMS, vol. 15(9), pages 506-527, May.
    5. Stephen F. Love, 1972. "A Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 18(5-Part-1), pages 327-338, January.
    6. Panayotis Afentakis & Bezalel Gavish & Uday Karmarkar, 1984. "Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Science, INFORMS, vol. 30(2), pages 222-239, February.
    7. Chand, Suresh & Voros, Jozsef, 1992. "Setup cost stability region for the dynamic lot sizing problem with backlogging," European Journal of Operational Research, Elsevier, vol. 58(1), pages 68-77, April.
    8. Suresh Chand, 1983. "Rolling Horizon Procedures for the Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 29(2), pages 237-249, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Konstantaras, I. & Papachristos, S., 2007. "Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options," European Journal of Operational Research, Elsevier, vol. 178(2), pages 433-448, April.
    2. Voros, Jozsef, 2002. "On the relaxation of multi-level dynamic lot-sizing models," International Journal of Production Economics, Elsevier, vol. 77(1), pages 53-61, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Voros, Jozsef, 2002. "On the relaxation of multi-level dynamic lot-sizing models," International Journal of Production Economics, Elsevier, vol. 77(1), pages 53-61, May.
    2. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    3. Hoesel, C. P. M. Van & Wagelmans, A. P. M., 2000. "Parametric analysis of setup cost in the economic lot-sizing model without speculative motives," International Journal of Production Economics, Elsevier, vol. 66(1), pages 13-22, June.
    4. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    5. Ioannis Ganas & Sotirios Papachristos, 2005. "The Single-Product Lot-Sizing Problem with Constant Parameters and Backlogging: Exact Results, a New Solution, and All Parameter Stability Regions," Operations Research, INFORMS, vol. 53(1), pages 170-176, February.
    6. Chu, Chi-Leung & Leon, V. Jorge, 2009. "Scalable methodology for supply chain inventory coordination with private information," European Journal of Operational Research, Elsevier, vol. 195(1), pages 262-279, May.
    7. Joseph Geunes & H. Edwin Romeijn & Kevin Taaffe, 2006. "Requirements Planning with Pricing and Order Selection Flexibility," Operations Research, INFORMS, vol. 54(2), pages 394-401, April.
    8. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
    9. Kerkkamp, R.B.O. & van den Heuvel, W. & Wagelmans, A.P.M., 2019. "Two-echelon lot-sizing with asymmetric information and continuous type space," Omega, Elsevier, vol. 87(C), pages 158-176.
    10. Vernon Ning Hsu, 2000. "Dynamic Economic Lot Size Model with Perishable Inventory," Management Science, INFORMS, vol. 46(8), pages 1159-1169, August.
    11. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
    12. Yale T. Herer & Michal Tzur, 2001. "The dynamic transshipment problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 386-408, August.
    13. Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.
    14. Gautier Stauffer, 2018. "Approximation algorithms for k-echelon extensions of the one warehouse multi-retailer problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 88(3), pages 445-473, December.
    15. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    16. Sunil Chopra & M.R. Rao & Chih‐Yang Tsai, 1997. "Computational study of the multiechelon production planning problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 1-19, February.
    17. Merzifonluoglu, Yasemin & Geunes, Joseph, 2006. "Uncapacitated production and location planning models with demand fulfillment flexibility," International Journal of Production Economics, Elsevier, vol. 102(2), pages 199-216, August.
    18. Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
    19. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
    20. Awi Federgruen & Michal Tzur, 1999. "Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 463-486, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:87:y:1995:i:1:p:132-141. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.