The dynamic transshipment problem
Author
Abstract
Suggested Citation
DOI: 10.1002/nav.1025
Download full text from publisher
References listed on IDEAS
- Lawrence W. Robinson, 1990. "Optimal and Approximate Policies in Multiperiod, Multilocation Inventory Models with Transshipments," Operations Research, INFORMS, vol. 38(2), pages 278-295, April.
- Uday S. Karmarkar, 1981. "The Multiperiod Multilocation Inventory Problem," Operations Research, INFORMS, vol. 29(2), pages 215-228, April.
- T. W. Archibald & S. A. E. Sassen & L. C. Thomas, 1997. "An Optimal Policy for a Two Depot Inventory Problem with Stock Transfer," Management Science, INFORMS, vol. 43(2), pages 173-183, February.
- Uday S. Karmarkar, 1979. "Convex/stochastic programming and multilocation inventory problems," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 26(1), pages 1-19, March.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Willard I. Zangwill, 1969. "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System--A Network Approach," Management Science, INFORMS, vol. 15(9), pages 506-527, May.
- Stephen F. Love, 1972. "A Facilities in Series Inventory Model with Nested Schedules," Management Science, INFORMS, vol. 18(5-Part-1), pages 327-338, January.
- Uday S. Karmarkar, 1987. "The Multilocation Multiperiod Inventory Problem: Bounds and Approximations," Management Science, INFORMS, vol. 33(1), pages 86-94, January.
- Barry A. Pasternack & Zvi Drezner, 1991. "Optimal inventory policies for substitutable commodities with stochastic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 221-240, April.
- Dev Joneja, 1990. "The Joint Replenishment Problem: New Heuristics and Worst Case Performance Bounds," Operations Research, INFORMS, vol. 38(4), pages 711-723, August.
- Stephen C. Allen, 1958. "Redistribution of total stock over several user locations," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 5(4), pages 337-345, December.
- S. G. Allen, 1962. "Computation for the Redistribution Model with Set-Up Charge," Management Science, INFORMS, vol. 8(4), pages 482-489, July.
- Awi Federgruen & Michal Tzur, 1991. "A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time," Management Science, INFORMS, vol. 37(8), pages 909-925, August.
- Alok Aggarwal & James K. Park, 1993. "Improved Algorithms for Economic Lot Size Problems," Operations Research, INFORMS, vol. 41(3), pages 549-571, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2019. "Optimal lateral transshipment policies for a two location inventory problem with multiple demand classes," European Journal of Operational Research, Elsevier, vol. 272(2), pages 481-495.
- Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
- Rakiz, Asma & Absi, Nabil & Fenies, Pierre, 2023. "Comparing approaches for a multi-level planning problem in a mining industry," International Journal of Production Economics, Elsevier, vol. 265(C).
- Andy Wei‐Di Wu & David Ming‐Huang Chiang, 2011. "Fashion products with asymmetric sales horizons," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(5), pages 490-506, August.
- Cem Deniz Caglar Bozkir & O. Erhun Kundakcioglu & Andrea C. Henry, 2022. "Hospital service levels during drug shortages: Stocking and transshipment policies for pharmaceutical inventory," Journal of Global Optimization, Springer, vol. 83(3), pages 565-584, July.
- Cavagnini, Rossana & Bertazzi, Luca & Maggioni, Francesca, 2022. "A rolling horizon approach for a multi-stage stochastic fixed-charge transportation problem with transshipment," European Journal of Operational Research, Elsevier, vol. 301(3), pages 912-922.
- Maxime C. Cohen & Ngai-Hang Zachary Leung & Kiran Panchamgam & Georgia Perakis & Anthony Smith, 2017. "The Impact of Linear Optimization on Promotion Planning," Operations Research, INFORMS, vol. 65(2), pages 446-468, April.
- Naderi, Siamak & Kilic, Kemal & Dasci, Abdullah, 2020. "A deterministic model for the transshipment problem of a fast fashion retailer under capacity constraints," International Journal of Production Economics, Elsevier, vol. 227(C).
- Andrew Lim & Zhaowei Miao & Brian Rodrigues & Zhou Xu, 2005. "Transshipment through crossdocks with inventory and time windows," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(8), pages 724-733, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
- Awi Federgruen & Michal Tzur, 1999. "Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 463-486, August.
- Minjiao Zhang & Simge Küçükyavuz & Hande Yaman, 2012. "A Polyhedral Study of Multiechelon Lot Sizing with Intermediate Demands," Operations Research, INFORMS, vol. 60(4), pages 918-935, August.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
- Romeijn, H.E. & van den Heuvel, W.J. & Geunes, J., 2012. "Mitigating the Cost of Anarchy in Supply Chain Systems," Econometric Institute Research Papers EI 2012-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Chung-Lun Li & Qingying Li, 2016. "Polynomial-Time Solvability of Dynamic Lot Size Problems," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(03), pages 1-20, June.
- Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2013. "Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem," Operations Research, INFORMS, vol. 61(2), pages 469-482, April.
- Azaron, Amir & Tang, Ou & Tavakkoli-Moghaddam, Reza, 2009. "Dynamic lot sizing problem with continuous-time Markovian production cost," International Journal of Production Economics, Elsevier, vol. 120(2), pages 607-612, August.
- Hark-Chin Hwang & Wilco van den Heuvel & Albert P. M. Wagelmans, 2023. "Multilevel Lot-Sizing with Inventory Bounds," INFORMS Journal on Computing, INFORMS, vol. 35(6), pages 1470-1490, November.
- Hwang, Hark-Chin & Kang, Jangha, 2020. "The two-level lot-sizing problem with outbound shipment," Omega, Elsevier, vol. 90(C).
- Goisque, Guillaume & Rapine, Christophe, 2017. "An efficient algorithm for the 2-level capacitated lot-sizing problem with identical capacities at both levels," European Journal of Operational Research, Elsevier, vol. 261(3), pages 918-928.
- Laurence A. Wolsey, 2002. "Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation," Management Science, INFORMS, vol. 48(12), pages 1587-1602, December.
- Ozelkan, Ertunga C. & Cakanyildirim, Metin, 2007. "Resource downgrading," European Journal of Operational Research, Elsevier, vol. 177(1), pages 572-590, February.
- Geunes, Joseph & Romeijn, H. Edwin & van den Heuvel, Wilco, 2016. "Improving the efficiency of decentralized supply chains with fixed ordering costs," European Journal of Operational Research, Elsevier, vol. 252(3), pages 815-828.
- Qi Feng & Chengzhang Li & Mengshi Lu & Jeyaveerasingam George Shanthikumar, 2022. "Dynamic Substitution for Selling Multiple Products under Supply and Demand Uncertainties," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1645-1662, April.
- Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
- Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:48:y:2001:i:5:p:386-408. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.