IDEAS home Printed from https://ideas.repec.org/p/jen/jenasw/2003-21.html
   My bibliography  Save this paper

A survey on problems and methods in generalized assembly line balancing

Author

Listed:
  • Armin Scholl

    (University of Jena, Faculty of Economics)

  • Christian Becker

    (University of Jena, Faculty of Economics)

Abstract

No abstract is available for this item.

Suggested Citation

  • Armin Scholl & Christian Becker, 2003. "A survey on problems and methods in generalized assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 21/2003, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
  • Handle: RePEc:jen:jenasw:2003-21
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Other versions of this item:

    References listed on IDEAS

    as
    1. Reza H. Ahmadi & Sriram Dasu & Christopher S. Tang, 1992. "The Dynamic Line Allocation Problem," Management Science, INFORMS, vol. 38(9), pages 1341-1353, September.
    2. G. J. Miltenburg & J. Wijngaard, 1994. "The U-line Line Balancing Problem," Management Science, INFORMS, vol. 40(10), pages 1378-1388, October.
    3. Miltenburg, John, 1998. "Balancing U-lines in a multiple U-line facility," European Journal of Operational Research, Elsevier, vol. 109(1), pages 1-23, August.
    4. G. M. Buxey, 1974. "Assembly Line Balancing with Multiple Stations," Management Science, INFORMS, vol. 20(6), pages 1010-1021, February.
    5. Dobson, Gregory & Arai Yano, Candace, 1994. "Cyclic scheduling to minimize inventory in a batch flow line," European Journal of Operational Research, Elsevier, vol. 75(2), pages 441-461, June.
    6. Moshe Sniedovich, 1981. "Analysis of a Preference Order Assembly Line Problem," Management Science, INFORMS, vol. 27(9), pages 1067-1080, September.
    7. Anulark Pinnoi & Wilbert E. Wilhelm, 1998. "Assembly System Design: A Branch and Cut Approach," Management Science, INFORMS, vol. 44(1), pages 103-118, January.
    8. Amen, Matthias, 2001. "Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time," International Journal of Production Economics, Elsevier, vol. 69(3), pages 255-264, February.
    9. J. L. C. Macaskill, 1972. "Production-Line Balances for Mixed-Model Lines," Management Science, INFORMS, vol. 19(4-Part-1), pages 423-434, December.
    10. Scholl, Armin & Klein, Robert & Domschke, Wolfgang, 1998. "Pattern based vocabulary building for effectively sequencing mixed model assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9365, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    11. Decker, Maria, 1993. "Capacity smoothing and sequencing for mixed-model lines," International Journal of Production Economics, Elsevier, vol. 30(1), pages 31-42, July.
    12. Chakravarty, Amiya K. & Shtub, Avraham, 1986. "A cost minimization procedure for mixed model production lines with normally distributed task times," European Journal of Operational Research, Elsevier, vol. 23(1), pages 25-36, January.
    13. Amen, Matthias, 2000. "An exact method for cost-oriented assembly line balancing," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 187-195, March.
    14. Fred N. Silverman & John C. Carter, 1986. "A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages," Management Science, INFORMS, vol. 32(4), pages 455-463, April.
    15. van Zante-de Fokkert, Jannet I. & de Kok, Ton G., 1997. "The mixed and multi model line balancing problem: a comparison," European Journal of Operational Research, Elsevier, vol. 100(3), pages 399-412, August.
    16. M. Kilbridge & L. Wester, 1961. "The Balance Delay Problem," Management Science, INFORMS, vol. 8(1), pages 69-84, October.
    17. Stephen C. Graves & Bruce W. Lamar, 1983. "An Integer Programming Procedure for Assembly System Design Problems," Operations Research, INFORMS, vol. 31(3), pages 522-545, June.
    18. Edward P. C. Kao & Maurice Queyranne, 1982. "On Dynamic Programming Methods for Assembly Line Balancing," Operations Research, INFORMS, vol. 30(2), pages 375-390, April.
    19. Edward P. C. Kao, 1976. "A Preference Order Dynamic Program for Stochastic Assembly Line Balancing," Management Science, INFORMS, vol. 22(10), pages 1097-1104, June.
    20. Amen, Matthias, 2000. "Heuristic methods for cost-oriented assembly line balancing: A survey," International Journal of Production Economics, Elsevier, vol. 68(1), pages 1-14, October.
    21. McMullen, Patrick R. & Frazier, Gregory V., 1997. "A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 177-190, September.
    22. Wafik H. Iskander & Jar Chou, 1990. "Unbalanced production line scheduling with partial job specialization," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 789-805, October.
    23. Scholl, Armin & Klein, Robert, 1997. "SALOME. a bidirectional branch and bound procedure for assembly line balancing," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 7890, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    24. R Pastor & C Andrés & A Duran & M Pérez, 2002. "Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(12), pages 1317-1323, December.
    25. Bukchin, Joseph & Masin, Michael, 2004. "Multi-objective design of team oriented assembly systems," European Journal of Operational Research, Elsevier, vol. 156(2), pages 326-352, July.
    26. Thomas R. Hoffmann, 1963. "Assembly Line Balancing with a Precedence Matrix," Management Science, INFORMS, vol. 9(4), pages 551-562, July.
    27. Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
    28. Peter A. Pinto & David G. Dannenbring & Basheer M. Khumawala, 1983. "Assembly Line Balancing with Processing Alternatives: An Application," Management Science, INFORMS, vol. 29(7), pages 817-830, July.
    29. Erel, Erdal & Gokcen, Hadi, 1999. "Shortest-route formulation of mixed-model assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 116(1), pages 194-204, July.
    30. Linus Schrage & Kenneth R. Baker, 1978. "Dynamic Programming Solution of Sequencing Problems with Precedence Constraints," Operations Research, INFORMS, vol. 26(3), pages 444-449, June.
    31. Nick T. Thomopoulos, 1970. "Mixed Model Line Balancing with Smoothed Station Assignments," Management Science, INFORMS, vol. 16(9), pages 593-603, May.
    32. Domschke, Wolfgang & Scholl, Armin & Voß, S., 1997. "Produktionsplanung: ablauforganisatorische Aspekte. 2. Aufl," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 619, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    33. Robert L. Carraway, 1989. "A Dynamic Programming Approach to Stochastic Assembly Line Balancing," Management Science, INFORMS, vol. 35(4), pages 459-471, April.
    34. Roger V. Johnson, 1983. "A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities," Management Science, INFORMS, vol. 29(11), pages 1309-1324, November.
    35. Lutz, CM & Davis, KR & Turner III, CF, 1994. "Development of operator assignment schedules: A DSS approach," Omega, Elsevier, vol. 22(1), pages 57-67, January.
    36. Scholl, Armin, 1995. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    37. Frederick S. Hillier & Kut C. So & Ronald W. Boling, 1993. "Notes: Toward Characterizing the Optimal Allocation of Storage Space in Production Line Systems with Variable Processing Times," Management Science, INFORMS, vol. 39(1), pages 126-133, January.
    38. Amiya K. Chakravarty & Avraham Shtub, 1985. "Balancing Mixed Model Lines with In-Process Inventories," Management Science, INFORMS, vol. 31(9), pages 1161-1174, September.
    39. A. M. Geoffrion & G. W. Graves, 1976. "Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/ LP Approach," Operations Research, INFORMS, vol. 24(4), pages 595-610, August.
    40. .Ilker Baybars, 1986. "A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem," Management Science, INFORMS, vol. 32(8), pages 909-932, August.
    41. Bukchin, Joseph & Darel, Ezey & Rubinovitz, Jacob, 1997. "Team-oriented assembly system design: A new approach," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 47-57, August.
    42. Sarin, Subhash C. & Erel, Erdal & Dar-El, Ezey M., 1999. "A methodology for solving single-model, stochastic assembly line balancing problem," Omega, Elsevier, vol. 27(5), pages 525-535, October.
    43. Gokcen, Hadi & Faruk Baykoc, O., 1999. "A new line remedial policy for the paced lines with stochastic task times," International Journal of Production Economics, Elsevier, vol. 58(2), pages 191-197, January.
    44. Armin Scholl & Robert Klein, 1997. "SALOME: A Bidirectional Branch-and-Bound Procedure for Assembly Line Balancing," INFORMS Journal on Computing, INFORMS, vol. 9(4), pages 319-334, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007. "A classification of assembly line balancing problems," European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
    2. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008. "Assembly line balancing: Which model to use when," International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
    3. Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
    4. Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
    5. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    6. Sternatz, Johannes, 2014. "Enhanced multi-Hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry," European Journal of Operational Research, Elsevier, vol. 235(3), pages 740-754.
    7. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    8. Marcus Ritt & Alysson M. Costa & Cristóbal Miralles, 2016. "The assembly line worker assignment and balancing problem with stochastic worker availability," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 907-922, February.
    9. Aase, Gerald R. & Olson, John R. & Schniederjans, Marc J., 2004. "U-shaped assembly line layouts and their impact on labor productivity: An experimental study," European Journal of Operational Research, Elsevier, vol. 156(3), pages 698-711, August.
    10. Scholl, Armin & Fliedner, Malte & Boysen, Nils, 2010. "Absalom: Balancing assembly lines with assignment restrictions," European Journal of Operational Research, Elsevier, vol. 200(3), pages 688-701, February.
    11. Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
    12. Diefenbach, Johannes & Stolletz, Raik, 2022. "Stochastic assembly line balancing: General bounds and reliability-based branch-and-bound algorithm," European Journal of Operational Research, Elsevier, vol. 302(2), pages 589-605.
    13. Hop, Nguyen Van, 2006. "A heuristic solution for fuzzy mixed-model line balancing problem," European Journal of Operational Research, Elsevier, vol. 168(3), pages 798-810, February.
    14. Bukchin, Yossi & Rabinowitch, Ithai, 2006. "A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 492-508, October.
    15. Sprecher, Arno, 2000. "SALBLIB: Challenging instances for assembly line balancing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 526, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    16. Franco Guerriero & John Miltenburg, 2003. "The stochastic U‐line balancing problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 31-57, February.
    17. Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.
    18. Scholl, Armin & Becker, Christian, 2005. "A note on "An exact method for cost-oriented assembly line balancing"," International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
    19. Lopes, Thiago Cantos & Pastre, Giuliano Vidal & Michels, Adalberto Sato & Magatão, Leandro, 2020. "Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization," Omega, Elsevier, vol. 95(C).
    20. Bukchin, Joseph & Masin, Michael, 2004. "Multi-objective design of team oriented assembly systems," European Journal of Operational Research, Elsevier, vol. 156(2), pages 326-352, July.

    More about this item

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:jen:jenasw:2003-21. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Markus Pasche (email available below). General contact details of provider: https://www.wiwi.uni-jena.de/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.