Assembly Line Balancing with Processing Alternatives: An Application
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.29.7.817
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jayaswal, Sachin & Agarwal, Prashant, 2013. "Balancing U-Shaped Assembly Lines with Resource Dependent Task Times: A Simulated Annealing Approach," IIMA Working Papers WP2013-11-06, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Anulark Pinnoi & Wilbert E. Wilhelm, 1998. "Assembly System Design: A Branch and Cut Approach," Management Science, INFORMS, vol. 44(1), pages 103-118, January.
- Jonathan Oesterle & Lionel Amodeo & Farouk Yalaoui, 2019. "A comparative study of Multi-Objective Algorithms for the Assembly Line Balancing and Equipment Selection Problem under consideration of Product Design Alternatives," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1021-1046, March.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007.
"A classification of assembly line balancing problems,"
European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "A classification of assembly line balancing problems," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 12/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Hsiu-Hsueh Kao & Din-Horng Yeh & Yi-Hsien Wang, 2011. "Resource Constrained Assembly Line Balancing Problem Solved with Ranked Positional Weight Rule," Review of Economics & Finance, Better Advances Press, Canada, vol. 1, pages 71-80, November.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008.
"Assembly line balancing: Which model to use when,"
International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Assembly line balancing: Which model to use when?," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 23/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Pinnoi, Anulark & Wilhelm, Wilbert E., 2000. "Valid inequalities for a class of assembly system problems," European Journal of Operational Research, Elsevier, vol. 126(1), pages 31-50, October.
- Lopes, Thiago Cantos & Sikora, C.G.S. & Molina, Rafael Gobbi & Schibelbain, Daniel & Rodrigues, L.C.A. & Magatão, Leandro, 2017. "Balancing a robotic spot welding manufacturing line: An industrial case study," European Journal of Operational Research, Elsevier, vol. 263(3), pages 1033-1048.
- Becker, Christian & Scholl, Armin, 2006.
"A survey on problems and methods in generalized assembly line balancing,"
European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
- Armin Scholl & Christian Becker, 2003. "A survey on problems and methods in generalized assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 21/2003, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Armin Scholl & Nils Boysen & Malte Fliedner, 2009. "Optimally solving the alternative subgraphs assembly line balancing problem," Annals of Operations Research, Springer, vol. 172(1), pages 243-258, November.
- Sotskov, Yuri N. & Dolgui, Alexandre & Portmann, Marie-Claude, 2006. "Stability analysis of an optimal balance for an assembly line with fixed cycle time," European Journal of Operational Research, Elsevier, vol. 168(3), pages 783-797, February.
- Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
- Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
- Gamberi, M. & Gamberini, R. & Manzini, R. & Regattieri, A., 2008. "An analytical model to evaluating the implementation of a batch-production-oriented line," International Journal of Production Economics, Elsevier, vol. 111(2), pages 729-740, February.
- Arianna Alfieri & Gaia Nicosia, 2007. "Minimum cost multi-product flow lines," Annals of Operations Research, Springer, vol. 150(1), pages 31-46, March.
- Araújo, Felipe F.B. & Costa, Alysson M. & Miralles, Cristóbal, 2012. "Two extensions for the ALWABP: Parallel stations and collaborative approach," International Journal of Production Economics, Elsevier, vol. 140(1), pages 483-495.
- Wilbert E. Wilhelm & Radu Gadidov, 2004. "A Branch-and-Cut Approach for a Generic Multiple-Product, Assembly-System Design Problem," INFORMS Journal on Computing, INFORMS, vol. 16(1), pages 39-55, February.
More about this item
Keywords
production/scheduling: line balancing; finance: capital budgeting; programming: integer algorithms; branch and bound;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:29:y:1983:i:7:p:817-830. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.