A heuristic solution for fuzzy mixed-model line balancing problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Allan L. Gutjahr & George L. Nemhauser, 1964. "An Algorithm for the Line Balancing Problem," Management Science, INFORMS, vol. 11(2), pages 308-315, November.
- Scholl, Armin, 1995.
"Balancing and sequencing of assembly lines,"
Publications of Darmstadt Technical University, Institute for Business Studies (BWL)
9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Scholl, Armin, 1999. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 10881, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Gokcen, Hadi & Erel, Erdal, 1997. "A goal programming approach to mixed-model assembly line balancing problem," International Journal of Production Economics, Elsevier, vol. 48(2), pages 177-185, January.
- J. L. C. Macaskill, 1972. "Production-Line Balances for Mixed-Model Lines," Management Science, INFORMS, vol. 19(4-Part-1), pages 423-434, December.
- Steven T. Hackman & Michael J. Magazine & T. S. Wee, 1989. "Fast, Effective Algorithms for Simple Assembly Line Balancing Problems," Operations Research, INFORMS, vol. 37(6), pages 916-924, December.
- B. Roy & Ph. Vincke, 1984. "Relational Systems of Preference with One or More Pseudo-Criteria: Some New Concepts and Results," Management Science, INFORMS, vol. 30(11), pages 1323-1335, November.
- .Ilker Baybars, 1986. "A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem," Management Science, INFORMS, vol. 32(8), pages 909-932, August.
- Erel, Erdal & Gokcen, Hadi, 1999. "Shortest-route formulation of mixed-model assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 116(1), pages 194-204, July.
- Amen, Matthias, 2000.
"Heuristic methods for cost-oriented assembly line balancing: A survey,"
International Journal of Production Economics, Elsevier, vol. 68(1), pages 1-14, October.
- Matthias Amen, 2003. "Heuristic methods for cost-oriented assembly line balancing: a survey," GE, Growth, Math methods 0309003, University Library of Munich, Germany, revised 09 Sep 2003.
- E. M. Mansoor, 1967. "Communications to the Editor--Improvement on Gutjahr and Nemhauser's Algorithm for the Line Balancing Problem," Management Science, INFORMS, vol. 14(3), pages 250-254, November.
- Kabir, Md. Alamgir & Tabucanon, Mario T., 1995. "Batch-model assembly line balancing: A multiattribute decision making approach," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 193-201, October.
- van Zante-de Fokkert, Jannet I. & de Kok, Ton G., 1997. "The mixed and multi model line balancing problem: a comparison," European Journal of Operational Research, Elsevier, vol. 100(3), pages 399-412, August.
- McMullen, Patrick R. & Frazier, Gregory V., 1997. "A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 177-190, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007.
"A classification of assembly line balancing problems,"
European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "A classification of assembly line balancing problems," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 12/2006, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- M. H. Alavidoost & M. H. Fazel Zarandi & Mosahar Tarimoradi & Yaser Nemati, 2017. "Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 313-336, February.
- Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
- Pirogov, Aleksandr & Gurevsky, Evgeny & Rossi, André & Dolgui, Alexandre, 2021. "Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions," European Journal of Operational Research, Elsevier, vol. 290(3), pages 946-955.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Becker, Christian & Scholl, Armin, 2006.
"A survey on problems and methods in generalized assembly line balancing,"
European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
- Armin Scholl & Christian Becker, 2003. "A survey on problems and methods in generalized assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 21/2003, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008.
"Assembly line balancing: Which model to use when,"
International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Assembly line balancing: Which model to use when?," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 23/2006, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007.
"A classification of assembly line balancing problems,"
European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "A classification of assembly line balancing problems," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 12/2006, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- Scholl, Armin & Becker, Christian, 2006.
"State-of-the-art exact and heuristic solution procedures for simple assembly line balancing,"
European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
- Armin Scholl & Christian Becker, 2003. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 20/2003, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- Karabati, Selcuk & Sayin, Serpil, 2003. "Assembly line balancing in a mixed-model sequencing environment with synchronous transfers," European Journal of Operational Research, Elsevier, vol. 149(2), pages 417-429, September.
- Boysen, Nils & Fliedner, Malte, 2008. "A versatile algorithm for assembly line balancing," European Journal of Operational Research, Elsevier, vol. 184(1), pages 39-56, January.
- Amen, Matthias, 2006. "Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds," European Journal of Operational Research, Elsevier, vol. 168(3), pages 747-770, February.
- Sternatz, Johannes, 2014. "Enhanced multi-Hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry," European Journal of Operational Research, Elsevier, vol. 235(3), pages 740-754.
- Scholl, Armin & Becker, Christian, 2005.
"A note on "An exact method for cost-oriented assembly line balancing","
International Journal of Production Economics, Elsevier, vol. 97(3), pages 343-352, September.
- Armin Scholl & Christian Becker, 2003. "A note on "An exact method for cost-oriented assembly line balancing"," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 22/2003, Friedrich Schiller University of Jena, School of of Economics and Business Administration.
- Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
- Hager Triki & Ahmed Mellouli & Faouzi Masmoudi, 2017. "A multi-objective genetic algorithm for assembly line resource assignment and balancing problem of type 2 (ALRABP-2)," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 371-385, February.
- Ibrahim Kucukkoc & Kadir Buyukozkan & Sule Itir Satoglu & David Z. Zhang, 2019. "A mathematical model and artificial bee colony algorithm for the lexicographic bottleneck mixed-model assembly line balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 30(8), pages 2913-2925, December.
- Scholl, Armin & Fliedner, Malte & Boysen, Nils, 2010. "Absalom: Balancing assembly lines with assignment restrictions," European Journal of Operational Research, Elsevier, vol. 200(3), pages 688-701, February.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009.
"Sequencing mixed-model assembly lines: Survey, classification and model critique,"
European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2007. "Sequencing mixed-model assembly lines: Survey, classification and model critique," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 02/2007, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Bukchin, Joseph & Masin, Michael, 2004. "Multi-objective design of team oriented assembly systems," European Journal of Operational Research, Elsevier, vol. 156(2), pages 326-352, July.
- Emel Kızılkaya Aydoğan & Yılmaz Delice & Uğur Özcan & Cevriye Gencer & Özkan Bali, 2019. "Balancing stochastic U-lines using particle swarm optimization," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 97-111, January.
- Franco Guerriero & John Miltenburg, 2003. "The stochastic U‐line balancing problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 31-57, February.
- Bukchin, Yossi & Rabinowitch, Ithai, 2006. "A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 492-508, October.
- Bautista, Joaquin & Pereira, Jordi, 2007. "Ant algorithms for a time and space constrained assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 177(3), pages 2016-2032, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:168:y:2006:i:3:p:798-810. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.