Balancing Mixed Model Lines with In-Process Inventories
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.31.9.1161
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Bukchin, Joseph & Masin, Michael, 2004. "Multi-objective design of team oriented assembly systems," European Journal of Operational Research, Elsevier, vol. 156(2), pages 326-352, July.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007.
"A classification of assembly line balancing problems,"
European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "A classification of assembly line balancing problems," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 12/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Bukchin, Joseph & Darel, Ezey & Rubinovitz, Jacob, 1997. "Team-oriented assembly system design: A new approach," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 47-57, August.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008.
"Assembly line balancing: Which model to use when,"
International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2006. "Assembly line balancing: Which model to use when?," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 23/2006, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Becker, Christian & Scholl, Armin, 2006.
"A survey on problems and methods in generalized assembly line balancing,"
European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
- Armin Scholl & Christian Becker, 2003. "A survey on problems and methods in generalized assembly line balancing," Jenaer Schriften zur Wirtschaftswissenschaft (Expired!) 21/2003, Friedrich-Schiller-Universität Jena, Wirtschaftswissenschaftliche Fakultät.
- Erel, Erdal & Gokcen, Hadi, 1999. "Shortest-route formulation of mixed-model assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 116(1), pages 194-204, July.
- Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
- van Zante-de Fokkert, Jannet I. & de Kok, Ton G., 1997. "The mixed and multi model line balancing problem: a comparison," European Journal of Operational Research, Elsevier, vol. 100(3), pages 399-412, August.
- Kim, Yeo Keun & Kim, Jae Yun & Kim, Yeongho, 2006. "An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines," European Journal of Operational Research, Elsevier, vol. 168(3), pages 838-852, February.
More about this item
Keywords
inventory/production; deterministic models; multi-echelon; production/scheduling; line balancing; lot-sizing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:31:y:1985:i:9:p:1161-1174. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.