Note: Bicriteria scheduling for minimizing flow time and maximum tardiness
Author
Abstract
Suggested Citation
DOI: 10.1002/(SICI)1520-6750(199609)43:63.0.CO;2-6
Download full text from publisher
References listed on IDEAS
- Horace Heck & Stephen Roberts, 1972. "A note on the extension of a result on scheduling with secondary criteria," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 19(2), pages 403-405, June.
- Rosser T. Nelson & Rakesh K. Sarin & Richard L. Daniels, 1986. "Scheduling with Multiple Performance Measures: The One-Machine Case," Management Science, INFORMS, vol. 32(4), pages 464-479, April.
- Azizoglu, Meral & Kondakci, Suna & Kirca, Omer, 1991. "Bicriteria scheduling problem involving total tardiness and total earliness penalties," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 17-24, October.
- Wayne E. Smith, 1956. "Various optimizers for single‐stage production," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 3(1‐2), pages 59-66, March.
- Hamilton Emmons, 1975. "One machine sequencing to minimize mean flow time with minimum number tardy," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 22(3), pages 585-592, September.
- Ali S. Kiran & Ali Tamer Unal, 1991. "A single‐machine problem with multiple criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 721-727, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- M Ozlen & M Azizoğlu, 2011. "Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 152-164, January.
- Mohamed Anis Allouche, 2010. "Manager’s Preferences Modeling within Multi-Criteria Flowshop Scheduling Problem: A Metaheuristic Approach," International Journal of Business Research and Management (IJBRM), Computer Science Journals (CSC Journals), vol. 1(2), pages 33-45, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
- Murat Güngör, 2016. "A note on efficient sequences with respect to total flow time and number of tardy jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(4), pages 346-348, June.
- Subhash C. Sarin & Divya Prakash, 2004. "Equal Processing Time Bicriteria Scheduling on Parallel Machines," Journal of Combinatorial Optimization, Springer, vol. 8(3), pages 227-240, September.
- Chen, Rubing & Yuan, Jinjiang & Ng, C.T. & Cheng, T.C.E., 2021. "Single-machine hierarchical scheduling with release dates and preemption to minimize the total completion time and a regular criterion," European Journal of Operational Research, Elsevier, vol. 293(1), pages 79-92.
- Ali S. Kiran & Ali Tamer Unal, 1991. "A single‐machine problem with multiple criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 721-727, October.
- M. Murat Köksalan, 1999. "A heuristic approach to bicriteria scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 777-789, October.
- Neppalli, Venkata Ranga & Chen, Chuen-Lung & Gupta, Jatinder N. D., 1996. "Genetic algorithms for the two-stage bicriteria flowshop problem," European Journal of Operational Research, Elsevier, vol. 95(2), pages 356-373, December.
- Koksalan Kondakci, Suna & Bekiroglu, Tuncay, 1997. "Scheduling with bicriteria: total flowtime and number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 53(1), pages 91-99, November.
- Ching‐Jong Liao & Cheng‐Hsing Chuang, 1996. "Sequencing with setup time and order tardiness trade‐offs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(7), pages 971-984, October.
- Marieke Quant & Marc Meertens & Hans Reijnierse, 2008.
"Processing games with shared interest,"
Annals of Operations Research, Springer, vol. 158(1), pages 219-228, February.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Other publications TiSEM 016ac415-c70e-453f-acfb-a, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2008. "Processing games with shared interest," Other publications TiSEM e83018e2-d6fb-4829-b6eb-f, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Discussion Paper 2004-126, Tilburg University, Center for Economic Research.
- Lili Liu & Guochun Tang & Baoqiang Fan & Xingpeng Wang, 2015. "Two-person cooperative games on scheduling problems in outpatient pharmacy dispensing process," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 938-948, November.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021.
"Cooperation and Competition in Linear Production and Sequencing Processes,"
Discussion Paper
2021-011, Tilburg University, Center for Economic Research.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021. "Cooperation and Competition in Linear Production and Sequencing Processes," Other publications TiSEM fd7a301b-7ef3-4142-835d-a, Tilburg University, School of Economics and Management.
- Reijnierse, Hans & Borm, Peter & Quant, Marieke & Meertens, Marc, 2010.
"Processing games with restricted capacities,"
European Journal of Operational Research, Elsevier, vol. 202(3), pages 773-780, May.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Other publications TiSEM a769e434-b8c9-4116-8897-f, Tilburg University, School of Economics and Management.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Discussion Paper 2004-83, Tilburg University, Center for Economic Research.
- Borm, Peter & Fiestras-Janeiro, Gloria & Hamers, Herbert & Sanchez, Estela & Voorneveld, Mark, 2002.
"On the convexity of games corresponding to sequencing situations with due dates,"
European Journal of Operational Research, Elsevier, vol. 136(3), pages 616-634, February.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Other publications TiSEM 46a07ce4-57fe-4a08-bcb5-c, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 2002. "On the convexity of games corresponding to sequencing situations with due dates," Other publications TiSEM caf52141-b0aa-42ef-96ed-e, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Discussion Paper 1999-49, Tilburg University, Center for Economic Research.
- Rubing Chen & Jinjiang Yuan, 2020. "Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices," 4OR, Springer, vol. 18(2), pages 177-196, June.
- Ravindran Vijayalakshmi, Vipin & Schröder, Marc & Tamir, Tami, 2024. "Minimizing total completion time with machine-dependent priority lists," European Journal of Operational Research, Elsevier, vol. 315(3), pages 844-854.
- Hanane Krim & Rachid Benmansour & David Duvivier & Daoud Aït-Kadi & Said Hanafi, 2020. "Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance," Computational Optimization and Applications, Springer, vol. 75(1), pages 291-320, January.
- M. Musegaas & P. E. M. Borm & M. Quant, 2018.
"On the convexity of step out–step in sequencing games,"
TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 26(1), pages 68-109, April.
- Musegaas, Marieke & Borm, Peter & Quant, Marieke, 2016. "On the Convexity of Step out - Step in Sequencing Games," Discussion Paper 2016-043, Tilburg University, Center for Economic Research.
- Musegaas, Marieke & Borm, Peter & Quant, Marieke, 2016. "On the Convexity of Step out - Step in Sequencing Games," Other publications TiSEM f8a803f5-1f6a-4ac4-b4f6-7, Tilburg University, School of Economics and Management.
- Musegaas, M. & Borm, P.E.M. & Quant, M., 2015.
"Step out–Step in sequencing games,"
European Journal of Operational Research, Elsevier, vol. 246(3), pages 894-906.
- Musegaas, M. & Borm, P.E.M. & Quant, M., 2014. "Step out - Step in Sequencing Games," Discussion Paper 2014-070, Tilburg University, Center for Economic Research.
- Musegaas, M. & Borm, P.E.M. & Quant, M., 2014. "Step out - Step in Sequencing Games," Other publications TiSEM 68089383-0b91-4cc8-9d03-e, Tilburg University, School of Economics and Management.
- Atay, Ata & Trudeau, Christian, 2024.
"Queueing games with an endogenous number of machines,"
Games and Economic Behavior, Elsevier, vol. 144(C), pages 104-125.
- Ata Atay & Christian Trudeau, 2022. "Queueing games with an endogenous number of machines," Papers 2207.07190, arXiv.org, revised Nov 2022.
- Ata Atay & Christian Trudeau, 2022. "Queueing games with an endogenous number of machines," UB School of Economics Working Papers 2022/429, University of Barcelona School of Economics.
- Ata Atay & Christian Trudeau, 2022. "Queueing games with an endogenous number of machines," Working Papers 2202, University of Windsor, Department of Economics.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:43:y:1996:i:6:p:929-936. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.