Systems analysis of project cash flow management strategies
Author
Abstract
Suggested Citation
DOI: 10.1080/01446191003702484
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Russell Kenley, 1999. "Cash farming in building and construction: a stochastic analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 17(3), pages 393-401.
- A. H. Boussabaine & Taha Elhag, 1999. "Applying fuzzy techniques to cash flow analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 17(6), pages 745-755.
- J. Nicholas & G. D. Holt & M. Mihsein, 2000. "Contractor financial credit limits; their derivation and implications for materials suppliers," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 535-545.
- Andrew Agapiou & Roger Flanagan & George Norman & David Notman, 1998. "The changing role of builders merchants in the construction supply chain," Construction Management and Economics, Taylor & Francis Journals, vol. 16(3), pages 351-361.
- A. H. Boussabaine & A. P. Kaka, 1998. "A neural networks approach for cost flow forecasting," Construction Management and Economics, Taylor & Francis Journals, vol. 16(4), pages 471-479.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yi Su & Gunnar Lucko, 2015. "Synthetic cash flow model with singularity functions for unbalanced bidding scenarios," Construction Management and Economics, Taylor & Francis Journals, vol. 33(1), pages 35-54, January.
- He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
- Lucko Gunnar, 2016. "Financial Planning and Management Practices of Electrical Contractors," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1482-1498, December.
- Cheng, Min-Yuan & Cao, Minh-Tu & Herianto, Jason Ghorman, 2020. "Symbiotic organisms search-optimized deep learning technique for mapping construction cash flow considering complexity of project," Chaos, Solitons & Fractals, Elsevier, vol. 138(C).
- Hongtao Xie & Junwei Zheng & Yunhua Zhang & Hongyang Li, 2019. "Effects of Payment Delays at Two Links in Payment Chains on the Progress of Construction Projects: System Dynamic Modeling and Simulation," Sustainability, MDPI, vol. 11(15), pages 1-25, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cheng, Min-Yuan & Cao, Minh-Tu & Herianto, Jason Ghorman, 2020. "Symbiotic organisms search-optimized deep learning technique for mapping construction cash flow considering complexity of project," Chaos, Solitons & Fractals, Elsevier, vol. 138(C).
- Mahir Msawil & Faris Elghaish & Krisanthi Seneviratne & Stephen McIlwaine, 2021. "Developing a Parametric Cash Flow Forecasting Model for Complex Infrastructure Projects: A Comparative Study," Sustainability, MDPI, vol. 13(20), pages 1-26, October.
- Shu-Shun Liu & Chang-Jung Wang, 2009. "Two-stage profit optimization model for linear scheduling problems considering cash flow," Construction Management and Economics, Taylor & Francis Journals, vol. 27(11), pages 1023-1037.
- Xin J. Ge & G. Runeson, 2004. "Modeling Property Prices Using Neural Network Model for Hong Kong," International Real Estate Review, Global Social Science Institute, vol. 7(1), pages 121-138.
- Kamal Dhawan & John E. Tookey & Ali GhaffarianHoseini & Mani Poshdar, 2024. "Monetised sustainability impacts of integrated planning in the manufactured construction products industry: A transport perspective from New Zealand," Journal of Economic Analysis, Anser Press, vol. 3(4), pages 161-185, December.
- Kamal Dhawan & John E. Tookey & Ali GhaffarianHoseini & Mani Poshdar, 2023. "Using Transport to Quantify the Impact of Vertical Integration on the Construction Supply Chain: A New Zealand Assessment," Sustainability, MDPI, vol. 15(2), pages 1-26, January.
- Gul Polat & David Arditi, 2005. "The JIT materials management system in developing countries," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 697-712.
- Wright, Daniel G. & Dey, Prasanta K. & Brammer, John G., 2013. "A fuzzy levelised energy cost method for renewable energy technology assessment," Energy Policy, Elsevier, vol. 62(C), pages 315-323.
- Piasecki Krzysztof & Siwek Joanna, 2015. "Behavioural Present Value Defined as Fuzzy Number – a New Approach," Folia Oeconomica Stetinensia, Sciendo, vol. 15(2), pages 27-41, December.
- Tolga, Ethem & Demircan, Murat Levent & Kahraman, Cengiz, 2005. "Operating system selection using fuzzy replacement analysis and analytic hierarchy process," International Journal of Production Economics, Elsevier, vol. 97(1), pages 89-117, July.
- Dirk Lindebaum & Susan Cartwright, 2010. "A Critical Examination of the Relationship between Emotional Intelligence and Transformational Leadership," Journal of Management Studies, Wiley Blackwell, vol. 47(7), pages 1317-1342, November.
- Mohd. Ahmed & Saeed AlQadhi & Javed Mallick & Nabil Ben Kahla & Hoang Anh Le & Chander Kumar Singh & Hoang Thi Hang, 2022. "Artificial Neural Networks for Sustainable Development of the Construction Industry," Sustainability, MDPI, vol. 14(22), pages 1-21, November.
- Beskese, Ahmet & Kahraman, Cengiz & Irani, Zahir, 2004. "Quantification of flexibility in advanced manufacturing systems using fuzzy concept," International Journal of Production Economics, Elsevier, vol. 89(1), pages 45-56, May.
- A. H. Boussabaine & Taha Elhag, 1999. "Applying fuzzy techniques to cash flow analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 17(6), pages 745-755.
- Hong Chen, 2010. "Using Financial and Macroeconomic Indicators to Forecast Sales of Large Development and Construction Firms," The Journal of Real Estate Finance and Economics, Springer, vol. 40(3), pages 310-331, April.
- da Cunha, Richard Alex & Rangel, Luís Alberto Duncan & Rudolf, Christian A. & Santos, Luiza dos, 2022. "A decision support approach employing the PROMETHEE method and risk factors for critical supply assessment in large-scale projects," Operations Research Perspectives, Elsevier, vol. 9(C).
More about this item
Keywords
Project cash flow; overdraft; cash flow management strategies; system dynamics; scenario analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:28:y:2010:i:4:p:361-376. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.