IDEAS home Printed from https://ideas.repec.org/a/vrs/otamic/v8y2016i1p1482-1498n11.html
   My bibliography  Save this article

Financial Planning and Management Practices of Electrical Contractors

Author

Listed:
  • Lucko Gunnar

    (Department of Civil Engineering, Catholic University of America, Washington, DC 20064, USA.)

Abstract

Contractors must carefully manage their cash outflows (e.g., for materials to enable their work) and inflows (after the work) to be profitable, particularly in an economy that is still recovering from the 2008–2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

Suggested Citation

  • Lucko Gunnar, 2016. "Financial Planning and Management Practices of Electrical Contractors," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1482-1498, December.
  • Handle: RePEc:vrs:otamic:v:8:y:2016:i:1:p:1482-1498:n:11
    DOI: 10.1515/otmcj-2016-0011
    as

    Download full text from publisher

    File URL: https://doi.org/10.1515/otmcj-2016-0011
    Download Restriction: no

    File URL: https://libkey.io/10.1515/otmcj-2016-0011?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Qingbin Cui & Makarand Hastak & Daniel Halpin, 2010. "Systems analysis of project cash flow management strategies," Construction Management and Economics, Taylor & Francis Journals, vol. 28(4), pages 361-376.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hongtao Xie & Junwei Zheng & Yunhua Zhang & Hongyang Li, 2019. "Effects of Payment Delays at Two Links in Payment Chains on the Progress of Construction Projects: System Dynamic Modeling and Simulation," Sustainability, MDPI, vol. 11(15), pages 1-25, July.
    2. Yi Su & Gunnar Lucko, 2015. "Synthetic cash flow model with singularity functions for unbalanced bidding scenarios," Construction Management and Economics, Taylor & Francis Journals, vol. 33(1), pages 35-54, January.
    3. He, Yukang & Jia, Tao & Zheng, Weibo, 2023. "Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty," European Journal of Operational Research, Elsevier, vol. 310(1), pages 34-52.
    4. Cheng, Min-Yuan & Cao, Minh-Tu & Herianto, Jason Ghorman, 2020. "Symbiotic organisms search-optimized deep learning technique for mapping construction cash flow considering complexity of project," Chaos, Solitons & Fractals, Elsevier, vol. 138(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:8:y:2016:i:1:p:1482-1498:n:11. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.