IDEAS home Printed from https://ideas.repec.org/a/spr/opsear/v59y2022i3d10.1007_s12597-022-00579-z.html
   My bibliography  Save this article

Optimizing large scale upgradations involving movable assets

Author

Listed:
  • Swapnesh Subramanian

    (Indian Institute of Technology Bombay)

  • Narayan Rangaraj

    (Indian Institute of Technology Bombay)

Abstract

Product upgradations are common, as it is practical and economical in many cases, compared to complete replacement. Proper planning and scheduling using quantitative techniques can be helpful in the case of large-scale upgradations involving movable assets, like rolling stock. There is a possibility of doing the upgradation of the asset in multiple locations, and there are operational constraints involved in executing the process. In this paper, we propose integer programming models to optimize the execution of these types of upgrades. A case involving retrofitting of bio-toilets in Indian Railways is used as an example. Computations are done for the allocation of movable assets for retrofit in a division of Southern Railways. The central unit decides the number of items to be retrofitted in each facility and facilities to be upgraded based on the output of the optimization model. Subsequently, a model for scheduling retrofitting at a facility is also discussed. There are other problems in the industry involving other movable assets like automobile and naval vessels, where extension of these models can be useful.

Suggested Citation

  • Swapnesh Subramanian & Narayan Rangaraj, 2022. "Optimizing large scale upgradations involving movable assets," OPSEARCH, Springer;Operational Research Society of India, vol. 59(3), pages 930-944, September.
  • Handle: RePEc:spr:opsear:v:59:y:2022:i:3:d:10.1007_s12597-022-00579-z
    DOI: 10.1007/s12597-022-00579-z
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12597-022-00579-z
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12597-022-00579-z?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. G Budai & D Huisman & R Dekker, 2006. "Scheduling preventive railway maintenance activities," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1035-1044, September.
    2. Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005. "Operations Research in passenger railway transportation," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
    3. Arianna Alfieri & Rutger Groot & Leo Kroon & Alexander Schrijver, 2006. "Efficient Circulation of Railway Rolling Stock," Transportation Science, INFORMS, vol. 40(3), pages 378-391, August.
    4. Denise D. Tönissen & Joachim J. Arts & Zuo-Jun (Max) Shen, 2019. "Maintenance Location Routing for Rolling Stock Under Line and Fleet Planning Uncertainty," Transportation Science, INFORMS, vol. 53(5), pages 1252-1270, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
    2. Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
    3. Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
    4. Valentina Cacchiani & Alberto Caprara & Paolo Toth, 2019. "An Effective Peak Period Heuristic for Railway Rolling Stock Planning," Transportation Science, INFORMS, vol. 53(3), pages 746-762, May.
    5. Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2018. "Reducing Passenger Delays by Rolling Stock Rescheduling," Econometric Institute Research Papers EI2018-29, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Gianmarco Garrisi & Cristina Cervelló-Pastor, 2019. "Train-Scheduling Optimization Model for Railway Networks with Multiplatform Stations," Sustainability, MDPI, vol. 12(1), pages 1-25, December.
    7. Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    8. Goel, Asvin & Meisel, Frank, 2013. "Workforce routing and scheduling for electricity network maintenance with downtime minimization," European Journal of Operational Research, Elsevier, vol. 231(1), pages 210-228.
    9. Liu, Gehui & Chen, Shaokuan & Ho, Tinkin & Ran, Xinchen & Mao, Baohua & Lan, Zhen, 2022. "Optimum opportunistic maintenance schedule over variable horizons considering multi-stage degradation and dynamic strategy," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    10. Martin Straka, 2021. "Design of a Computer-Aided Location Expert System Based on a Mathematical Approach," Mathematics, MDPI, vol. 9(9), pages 1-25, May.
    11. Santos, Rui & Fonseca Teixeira, Paulo & Pais Antunes, Antonio, 2015. "Planning and scheduling efficient heavy rail track maintenance through a Decision Rules Model," Research in Transportation Economics, Elsevier, vol. 54(C), pages 20-32.
    12. David Schindl & Nicolas Zufferey, 2015. "A learning tabu search for a truck allocation problem with linear and nonlinear cost components," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(1), pages 32-45, February.
    13. Kroon, L.G. & Huisman, D. & Abbink, E.J.W. & Fioole, P-J. & Fischetti, M. & Maróti, G. & Schrijver, A. & Steenbeek, A. & Ybema, R., 2008. "The new Dutch timetable: The OR revolution," Econometric Institute Research Papers EI 2008-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    14. Xueqiao Yu & Maoxiang Lang & Wenhui Zhang & Shiqi Li & Mingyue Zhang & Xiao Yu, 2019. "An Empirical Study on the Comprehensive Optimization Method of a Train Diagram of the China High Speed Railway Express," Sustainability, MDPI, vol. 11(7), pages 1-30, April.
    15. Zhang, Chuntian & Gao, Yuan & Yang, Lixing & Gao, Ziyou & Qi, Jianguo, 2020. "Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation," Transportation Research Part B: Methodological, Elsevier, vol. 134(C), pages 64-92.
    16. Abbink, E.J.W., 2008. "Solving large scale crew scheduling problems by using iterative partitioning," Econometric Institute Research Papers EI 2008-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    17. Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & Chiachío, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    18. Tönissen, D.D. & Arts, J.J., 2020. "The stochastic maintenance location routing allocation problem for rolling stock," International Journal of Production Economics, Elsevier, vol. 230(C).
    19. Bouvard, K. & Artus, S. & Bérenguer, C. & Cocquempot, V., 2011. "Condition-based dynamic maintenance operations planning & grouping. Application to commercial heavy vehicles," Reliability Engineering and System Safety, Elsevier, vol. 96(6), pages 601-610.
    20. Leo Kroon & Dennis Huisman & Erwin Abbink & Pieter-Jan Fioole & Matteo Fischetti & Gábor Maróti & Alexander Schrijver & Adri Steenbeek & Roelof Ybema, 2009. "The New Dutch Timetable: The OR Revolution," Interfaces, INFORMS, vol. 39(1), pages 6-17, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:59:y:2022:i:3:d:10.1007_s12597-022-00579-z. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.