IDEAS home Printed from https://ideas.repec.org/a/spr/operea/v18y2018i1d10.1007_s12351-016-0252-y.html
   My bibliography  Save this article

An innovative model for resource scheduling in VCIM systems

Author

Listed:
  • Son Duy Dao

    (University of South Australia)

  • Kazem Abhary

    (University of South Australia)

  • Romeo Marian

    (University of South Australia)

Abstract

Virtual computer-integrated manufacturing (VCIM) is a promising manufacturing strategy in today’s global market because it is capable of exploiting distributed resources effectively, both locally as well as globally. Resource scheduling is critical to the operation of VCIM systems. In this article, a novel model for resource scheduling in VCIM systems is developed. By integrating collaborative transportation scheduling into manufacturing resource scheduling, the proposed model can provide a better solution because of reduction in the fixed transportation cost. Performance of the developed model is verified by computer simulation for a case study producing computer hard disks. The proposed model serves as a fundamental step towards global optimisation of VCIM systems.

Suggested Citation

  • Son Duy Dao & Kazem Abhary & Romeo Marian, 2018. "An innovative model for resource scheduling in VCIM systems," Operational Research, Springer, vol. 18(1), pages 33-54, April.
  • Handle: RePEc:spr:operea:v:18:y:2018:i:1:d:10.1007_s12351-016-0252-y
    DOI: 10.1007/s12351-016-0252-y
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12351-016-0252-y
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12351-016-0252-y?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Cardin, Olivier & Mebarki, Nasser & Pinot, Guillaume, 2013. "A study of the robustness of the group scheduling method using an emulation of a complex FMS," International Journal of Production Economics, Elsevier, vol. 146(1), pages 199-207.
    2. He, N. & Zhang, D.Z. & Li, Q., 2014. "Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system," International Journal of Production Economics, Elsevier, vol. 149(C), pages 117-130.
    3. Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
    4. Batur, G. Didem & Karasan, Oya Ekin & Akturk, M. Selim, 2012. "Multiple part-type scheduling in flexible robotic cells," International Journal of Production Economics, Elsevier, vol. 135(2), pages 726-740.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guo, Daqiang & Li, Mingxing & Lyu, Zhongyuan & Kang, Kai & Wu, Wei & Zhong, Ray Y. & Huang, George Q., 2021. "Synchroperation in industry 4.0 manufacturing," International Journal of Production Economics, Elsevier, vol. 238(C).
    2. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    3. Angelo Aliano Filho & Antonio Carlos Moretti & Margarida Vaz Pato & Washington Alves Oliveira, 2021. "An exact scalarization method with multiple reference points for bi-objective integer linear optimization problems," Annals of Operations Research, Springer, vol. 296(1), pages 35-69, January.
    4. Kucukkoc, Ibrahim & Zhang, David Z., 2014. "Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines," International Journal of Production Economics, Elsevier, vol. 158(C), pages 314-333.
    5. Mohd. Shaaban Hussain & Mohammed Ali, 2019. "A Multi-agent Based Dynamic Scheduling of Flexible Manufacturing Systems," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 20(3), pages 267-290, September.
    6. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
    7. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
    8. Becker, Till & Illigen, Christoph & McKelvey, Bill & Hülsmann, Michael & Windt, Katja, 2016. "Using an agent-based neural-network computational model to improve product routing in a logistics facility," International Journal of Production Economics, Elsevier, vol. 174(C), pages 156-167.
    9. Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
    10. Choe, Pilsung & Tew, Jeffrey D. & Tong, Songzhen, 2015. "Effect of cognitive automation in a material handling system on manufacturing flexibility," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 891-899.
    11. Sawik, Tadeusz, 2014. "Joint supplier selection and scheduling of customer orders under disruption risks: Single vs. dual sourcing," Omega, Elsevier, vol. 43(C), pages 83-95.
    12. Olivier Cardin & Damien Trentesaux & André Thomas & Pierre Castagna & Thierry Berger & Hind Bril El-Haouzi, 2017. "Coupling predictive scheduling and reactive control in manufacturing hybrid control architectures: state of the art and future challenges," Journal of Intelligent Manufacturing, Springer, vol. 28(7), pages 1503-1517, October.
    13. Li, Xingyu & Epureanu, Bogdan I., 2020. "An agent-based approach to optimizing modular vehicle fleet operation," International Journal of Production Economics, Elsevier, vol. 228(C).
    14. Solimanpur, Maghsud & Elmi, Atabak, 2013. "A tabu search approach for cell scheduling problem with makespan criterion," International Journal of Production Economics, Elsevier, vol. 141(2), pages 639-645.
    15. Mohammad Reza Komari Alaei & Mehmet Soysal & Atabak Elmi & Audrius Banaitis & Nerija Banaitiene & Reza Rostamzadeh & Shima Javanmard, 2021. "A Bender’s Algorithm of Decomposition Used for the Parallel Machine Problem of Robotic Cell," Mathematics, MDPI, vol. 9(15), pages 1-15, July.
    16. Gultekin, Hakan, 2012. "Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibility," International Journal of Production Economics, Elsevier, vol. 140(2), pages 900-911.
    17. Amirhosein Gholami & Nasim Nezamoddini & Mohammad T. Khasawneh, 2023. "Customized orders management in connected make-to-order supply chains," Operations Management Research, Springer, vol. 16(3), pages 1428-1443, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:operea:v:18:y:2018:i:1:d:10.1007_s12351-016-0252-y. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.