An agent-based approach to optimizing modular vehicle fleet operation
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2020.107733
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Meng, Qingfeng & Li, Zhen & Liu, Huimin & Chen, Jingxian, 2017. "Agent-based simulation of competitive performance for supply chains based on combined contracts," International Journal of Production Economics, Elsevier, vol. 193(C), pages 663-676.
- Akanle, O.M. & Zhang, D.Z., 2008. "Agent-based model for optimising supply-chain configurations," International Journal of Production Economics, Elsevier, vol. 115(2), pages 444-460, October.
- Böhnlein, Dominik & Schweiger, Katharina & Tuma, Axel, 2011. "Multi-agent-based transport planning in the newspaper industry," International Journal of Production Economics, Elsevier, vol. 131(1), pages 146-157, May.
- Reaidy, Jihad & Massotte, Pierre & Diep, Daniel, 2006. "Comparison of negotiation protocols in dynamic agent-based manufacturing systems," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 117-130, February.
- E A Silver & H Naseraldin & D P Bischak, 2009. "Determining the reorder point and order-up-to-level in a periodic review system so as to achieve a desired fill rate and a desired average time between replenishments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1244-1253, September.
- He, N. & Zhang, D.Z. & Li, Q., 2014. "Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system," International Journal of Production Economics, Elsevier, vol. 149(C), pages 117-130.
- Anosike, A.I. & Zhang, D.Z., 2009. "An agent-based approach for integrating manufacturing operations," International Journal of Production Economics, Elsevier, vol. 121(2), pages 333-352, October.
- Matthias Holweg & Frits K. Pil, 2005. "The Second Century: Reconnecting Customer and Value Chain through Build-to-Order Moving Beyond Mass and Lean in the Auto Industry," MIT Press Books, The MIT Press, edition 1, volume 1, number 0262582627, April.
- Ulrich W. Thonemann & Margaret L. Brandeau, 2000. "Optimal Commonality in Component Design," Operations Research, INFORMS, vol. 48(1), pages 1-19, February.
- Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
- Warren Liao, T. & Chang, P.C., 2010. "Impacts of forecast, inventory policy, and lead time on supply chain inventory--A numerical study," International Journal of Production Economics, Elsevier, vol. 128(2), pages 527-537, December.
- Yigal Gerchak & Michael J. Magazine & A. Bruce Gamble, 1988. "Component Commonality with Service Level Requirements," Management Science, INFORMS, vol. 34(6), pages 753-760, June.
- Valérie Mathieu, 2001. "Service strategies within the manufacturing sector: benefits, costs and partnership," Post-Print hal-01796269, HAL.
- Adhau, Sunil & Mittal, M.L. & Mittal, Abhinav, 2013. "A multi-agent system for decentralized multi-project scheduling with resource transfers," International Journal of Production Economics, Elsevier, vol. 146(2), pages 646-661.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Turan, Hasan Hüseyin & Jalalvand, Fatemeh & Elsawah, Sondoss & Ryan, Michael J., 2022. "A joint problem of strategic workforce planning and fleet renewal: With an application in defense," European Journal of Operational Research, Elsevier, vol. 296(2), pages 615-634.
- Zhang, Qin & Liu, Yu & Xiahou, Tangfan & Huang, Hong-Zhong, 2023. "A heuristic maintenance scheduling framework for a military aircraft fleet under limited maintenance capacities," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jing-Sheng Song & Yao Zhao, 2009. "The Value of Component Commonality in a Dynamic Inventory System with Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 11(3), pages 493-508, March.
- Zhang, David Z., 2011. "Towards theory building in agile manufacturing strategies--Case studies of an agility taxonomy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 303-312, May.
- Böhnlein, Dominik & Schweiger, Katharina & Tuma, Axel, 2011. "Multi-agent-based transport planning in the newspaper industry," International Journal of Production Economics, Elsevier, vol. 131(1), pages 146-157, May.
- Eva Labro, 2004. "The Cost Effects of Component Commonality: A Literature Review Through a Management-Accounting Lens," Manufacturing & Service Operations Management, INFORMS, vol. 6(4), pages 358-367, June.
- Chong, You Quan & Wang, Bin & Yue Tan, Gladys Li & Cheong, Siew Ann, 2014. "Diversified firms on dynamical supply chain cope with financial crisis better," International Journal of Production Economics, Elsevier, vol. 150(C), pages 239-245.
- Kucukkoc, Ibrahim & Zhang, David Z., 2014. "Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines," International Journal of Production Economics, Elsevier, vol. 158(C), pages 314-333.
- Joon-Seok Kim & Saif Benjaafar, 2002. "On the Benefits of Inventory-Pooling in Production-Inventory Systems," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 12-16.
- Jans, Raf & Degraeve, Zeger & Schepens, Luc, 2008. "Analysis of an industrial component commonality problem," European Journal of Operational Research, Elsevier, vol. 186(2), pages 801-811, April.
- Jiri Chod & David Pyke & Nils Rudi, 2010. "The Value of Flexibility in Make-to-Order Systems: The Effect of Demand Correlation," Operations Research, INFORMS, vol. 58(4-part-1), pages 834-848, August.
- Becker, Till & Illigen, Christoph & McKelvey, Bill & Hülsmann, Michael & Windt, Katja, 2016. "Using an agent-based neural-network computational model to improve product routing in a logistics facility," International Journal of Production Economics, Elsevier, vol. 174(C), pages 156-167.
- Moncayo-Martínez, Luis A. & Zhang, David Z., 2011. "Multi-objective ant colony optimisation: A meta-heuristic approach to supply chain design," International Journal of Production Economics, Elsevier, vol. 131(1), pages 407-420, May.
- Mizgier, Kamil J. & Wagner, Stephan M. & Holyst, Janusz A., 2012. "Modeling defaults of companies in multi-stage supply chain networks," International Journal of Production Economics, Elsevier, vol. 135(1), pages 14-23.
- Jan A. Van Mieghem, 2004. "Note--Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution," Management Science, INFORMS, vol. 50(3), pages 419-424, March.
- Noordhoek, Marije & Dullaert, Wout & Lai, David S.W. & de Leeuw, Sander, 2018. "A simulation–optimization approach for a service-constrained multi-echelon distribution network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 292-311.
- Dachs, Bernhard & Biege, Sabine & Borowiecki, Marcin & Lay, Gunther & Jäger, Angela & Schartinger, Doris, 2012. "The Servitization of European Manufacturing Industries," MPRA Paper 38873, University Library of Munich, Germany.
- Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
- Zhou, Dan & Yan, Tingting & Zhao, Lilong & Guo, Jingjing, 2020. "Performance implications of servitization: Does a Manufacturer's service supply network matter?," International Journal of Production Economics, Elsevier, vol. 219(C), pages 31-42.
- Lino Cinquini & Andrea Tenucci, 2011. "Management Accounting for Service: A Research Agenda," Working Papers 201102, Scuola Superiore Sant'Anna of Pisa, Istituto di Management.
- Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
- Son Duy Dao & Kazem Abhary & Romeo Marian, 2018. "An innovative model for resource scheduling in VCIM systems," Operational Research, Springer, vol. 18(1), pages 33-54, April.
More about this item
Keywords
Agent-based modeling; Operation management; Decision support system; Fleet modularity;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:228:y:2020:i:c:s0925527320301225. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.