Aggregate planning and forecasting in make-to-order production systems
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2015.06.001
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Schneeweiss, Christoph, 2003. "Distributed decision making in supply chain management," International Journal of Production Economics, Elsevier, vol. 84(1), pages 71-83, April.
- Vargas, Vicente & Metters, Richard, 2011. "A master production scheduling procedure for stochastic demand and rolling planning horizons," International Journal of Production Economics, Elsevier, vol. 132(2), pages 296-302, August.
- Nam, Sang-jin & Logendran, Rasaratnam, 1992. "Aggregate production planning -- A survey of models and methodologies," European Journal of Operational Research, Elsevier, vol. 61(3), pages 255-272, September.
- Dobos, Imre, 1996. "Aggregate planning with continuous time," International Journal of Production Economics, Elsevier, vol. 43(1), pages 1-9, May.
- Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
- Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
- Voros, Jozsef, 1999. "On the risk-based aggregate planning for seasonal products," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 195-201, March.
- Inderfurth, Karl, 2009. "How to protect against demand and yield risks in MRP systems," International Journal of Production Economics, Elsevier, vol. 121(2), pages 474-481, October.
- Enns, S. T., 2002. "MRP performance effects due to forecast bias and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 138(1), pages 87-102, April.
- Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
- Tang, Ou & Grubbstrom, Robert W., 2002. "Planning and replanning the master production schedule under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 78(3), pages 323-334, August.
- Gfrerer, Helmut & Zapfel, Gunther, 1995. "Hierarchical model for production planning in the case of uncertain demand," European Journal of Operational Research, Elsevier, vol. 86(1), pages 142-161, October.
- Herbert Meyr & Michael Wagner & Jens Rohde, 2005. "Structure of Advanced Planning Systems," Springer Books, in: Hartmut Stadtler & Christoph Kilger (ed.), Supply Chain Management and Advanced Planning, edition 0, chapter 5, pages 109-115, Springer.
- J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
- He, N. & Zhang, D.Z. & Li, Q., 2014. "Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system," International Journal of Production Economics, Elsevier, vol. 149(C), pages 117-130.
- Schneeweiss, Christoph, 2003. "Distributed decision making--a unified approach," European Journal of Operational Research, Elsevier, vol. 150(2), pages 237-252, October.
- Tang, Ou & Grubbstrom, Robert W. & Zanoni, Simone, 2007. "Planned lead time determination in a make-to-order remanufacturing system," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 426-435, July.
- Kerkkänen, Annastiina & Korpela, Jukka & Huiskonen, Janne, 2009. "Demand forecasting errors in industrial context: Measurement and impacts," International Journal of Production Economics, Elsevier, vol. 118(1), pages 43-48, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Abbate, Stefano & Centobelli, Piera & Cerchione, Roberto, 2023. "From Fast to Slow: An Exploratory Analysis of Circular Business Models in the Italian Apparel Industry," International Journal of Production Economics, Elsevier, vol. 260(C).
- Yasser A. Davizón & César Martínez-Olvera & Rogelio Soto & Carlos Hinojosa & Piero Espino-Román, 2015. "Optimal Control Approaches to the Aggregate Production Planning Problem," Sustainability, MDPI, vol. 7(12), pages 1-16, December.
- Pereira, Daniel Filipe & Oliveira, José Fernando & Carravilla, Maria Antónia, 2020. "Tactical sales and operations planning: A holistic framework and a literature review of decision-making models," International Journal of Production Economics, Elsevier, vol. 228(C).
- Ata Allah Taleizadeh, 2017. "Stochastic Multi-Objectives Supply Chain Optimization with Forecasting Partial Backordering Rate: A Novel Hybrid Method of Meta Goal Programming and Evolutionary Algorithms," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
- Murray, Paul W. & Agard, Bruno & Barajas, Marco A., 2018. "ASACT - Data preparation for forecasting: A method to substitute transaction data for unavailable product consumption data," International Journal of Production Economics, Elsevier, vol. 203(C), pages 264-275.
- Andrea Borenich & Peter Greistorfer & Marc Reimann, 2020. "Model-based production cost estimation to support bid processes: an automotive case study," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(3), pages 841-868, September.
- Rahmer, Bruno de Jesús & Garzón Saénz, Hernando & Garzón Solana, José Manuel, 2022. "Análisis comparativo de modelos de planificación agregada. El caso de las empresas manufactureras colombianas [Comparative analysis of agreggate planning models. The case of the colombian manufactu," Revista de Métodos Cuantitativos para la Economía y la Empresa = Journal of Quantitative Methods for Economics and Business Administration, Universidad Pablo de Olavide, Department of Quantitative Methods for Economics and Business Administration, vol. 33(1), pages 285-309, June.
- Rusindiyanto, 2023. "Production Planning and Control of Flooring Using Aggregate Planning Method," Technium, Technium Science, vol. 16(1), pages 397-404.
- Klaus Altendorfer & Thomas Felberbauer & Herbert Jodlbauer, 2018. "Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand," Papers 1812.00773, arXiv.org.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
- Wernz, Christian & Deshmukh, Abhijit, 2010. "Multiscale decision-making: Bridging organizational scales in systems with distributed decision-makers," European Journal of Operational Research, Elsevier, vol. 202(3), pages 828-840, May.
- Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
- Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
- Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.
- Wang, Lu, 2014. "Distributed Decision Making in der OP-Planung im Krankenhaus," Bayreuth Reports on Information Systems Management 58, University of Bayreuth, Chair of Information Systems Management.
- Andrew Henry & Christian Wernz, 2015. "A multiscale decision theory analysis for revenue sharing in three-stage supply chains," Annals of Operations Research, Springer, vol. 226(1), pages 277-300, March.
- Ben Mohamed, Imen & Klibi, Walid & Sadykov, Ruslan & Şen, Halil & Vanderbeck, François, 2023. "The two-echelon stochastic multi-period capacitated location-routing problem," European Journal of Operational Research, Elsevier, vol. 306(2), pages 645-667.
- Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
- Gansterer, Margaretha & Hartl, Richard F., 2018. "Collaborative vehicle routing: A survey," European Journal of Operational Research, Elsevier, vol. 268(1), pages 1-12.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Hübner, Alexander & Schaal, Kai, 2017. "A shelf-space optimization model when demand is stochastic and space-elastic," Omega, Elsevier, vol. 68(C), pages 139-154.
- Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
- Simon Thevenin & Yossiri Adulyasak & Jean‐François Cordeau, 2021. "Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization," Production and Operations Management, Production and Operations Management Society, vol. 30(2), pages 475-493, February.
- Hübner, Alexander & Hense, Jonas & Dethlefs, Christian, 2022. "The revival of retail stores via omnichannel operations: A literature review and research framework," European Journal of Operational Research, Elsevier, vol. 302(3), pages 799-818.
- Wernz, Christian & Deshmukh, Abhijit, 2012. "Unifying temporal and organizational scales in multiscale decision-making," European Journal of Operational Research, Elsevier, vol. 223(3), pages 739-751.
- Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
- Klibi, Walid & Martel, Alain & Guitouni, Adel, 2016. "The impact of operations anticipations on the quality of stochastic location-allocation models," Omega, Elsevier, vol. 62(C), pages 19-33.
- Tuomikangas, Nina & Kaipia, Riikka, 2014. "A coordination framework for sales and operations planning (S&OP): Synthesis from the literature," International Journal of Production Economics, Elsevier, vol. 154(C), pages 243-262.
- Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
More about this item
Keywords
Hierarchical production planning; Aggregate planning; Make-to-order;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:521-528. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.