IDEAS home Printed from https://ideas.repec.org/a/sae/jouinf/v6y2014i2p145-165.html
   My bibliography  Save this article

Effect of the Political Environment on Public Private Partnership Projects

Author

Listed:
  • Nandita Vadali

    (Graduate Student, Infrastructure Civil Engineering IIT Madras, Chennai, Tamil Nadu, India)

  • Anand Prakash Tiwari

    (Fellow, Human Settlement Management Institute New Delhi aptiwari20767@gmail.com)

  • Thillai Rajan A.

    (Associate Professor, Department of Management Studies IIT Madras, Chennai, Tamil Nadu, India thillair@iitm.ac.in)

Abstract

Infrastructure plays an important role in economic growth and development. Increasingly, infrastructure projects are being developed with investment from private sector. In recent years, India has implemented a large number of roads under public private partnership (PPP) projects. This study is an empirical analysis of the impact of political environment on various project outcomes. The data set for the study comprised 62 completed national highway PPP projects. Our results showed that project technical characteristics influenced project performance more than political factors. Among the different political factors, the factors pertaining to state government were prominent in influencing performance as compared to those of Central Government. The change in state government during the project development phase resulted in higher time overruns. Interestingly, different political parties in the state and Central Government need not necessarily impact the project negatively. Projects developed in states where the state and Central Government are different had lower unit time and lower time overrun. For private investors, our results imply that in a country with strong political and legal systems, project development performance is more dependent on the project technical characteristics and operating environment variables as compared to political factors.

Suggested Citation

  • Nandita Vadali & Anand Prakash Tiwari & Thillai Rajan A., 2014. "Effect of the Political Environment on Public Private Partnership Projects," Journal of Infrastructure Development, India Development Foundation, vol. 6(2), pages 145-165, December.
  • Handle: RePEc:sae:jouinf:v:6:y:2014:i:2:p:145-165
    DOI: 10.1177/0974930614564651
    as

    Download full text from publisher

    File URL: https://journals.sagepub.com/doi/10.1177/0974930614564651
    Download Restriction: no

    File URL: https://libkey.io/10.1177/0974930614564651?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Bent Flyvbjerg & Mette K. Skamris holm & Søren L. Buhl, 2003. "How common and how large are cost overruns in transport infrastructure projects?," Transport Reviews, Taylor & Francis Journals, vol. 23(1), pages 71-88, January.
    2. Ram Singh, 2009. "Cost and Time Overruns in Infrastructure Projects: Extent, Causes and Remedies," Working Papers id:2281, eSocialSciences.
    3. Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
    4. Eduardo A. Gamez & Ali Touran, 2009. "A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries," Transport Reviews, Taylor & Francis Journals, vol. 30(3), pages 361-387, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
    2. Chantal C. Cantarelli & Bert van Wee & Eric J. E. Molin & Bent Flyvbjerg, 2013. "Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transportation Infrastructure Projects," Papers 1307.2179, arXiv.org, revised Jan 2015.
    3. Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012. "Geographical variation in project cost performance: the Netherlands versus worldwide," Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
    4. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
    5. Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012. "Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases," Transport Policy, Elsevier, vol. 22(C), pages 49-56.
    6. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    7. Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
    8. Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
    9. Lindsey, Robin & de Palma, André, 2014. "Cost recovery from congestion tolls with long-run uncertainty," Economics of Transportation, Elsevier, vol. 3(2), pages 119-132.
    10. Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
    11. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    12. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    13. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    14. Ram Singh, 2018. "Public–private partnerships vs. traditional contracts for highways," Indian Economic Review, Springer, vol. 53(1), pages 29-63, December.
    15. C. Guccio & G. Pignataro & I. Rizzo, 2012. "Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts," Applied Economics, Taylor & Francis Journals, vol. 44(15), pages 1891-1909, May.
    16. Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
    17. Steininger, Bertram & Groth, Martin & Weber, Birgitte, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Working Paper Series 20/11, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
    18. Odeck, James, 2014. "Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway," Transportation Research Part A: Policy and Practice, Elsevier, vol. 65(C), pages 68-79.
    19. Cantarelli, C.C. & van Wee, B. & Molin, E.J.E. & Flyvbjerg, B., 2012. "Different cost performance: different determinants?," Transport Policy, Elsevier, vol. 22(C), pages 88-95.
    20. Holz-Rau, Christian & Scheiner, Joachim, 2011. "Safety and travel time in cost-benefit analysis: A sensitivity analysis for North Rhine-Westphalia," Transport Policy, Elsevier, vol. 18(2), pages 336-346, March.

    More about this item

    Keywords

    PPP; infrastructure; political risk; road projects; developing countries; India;
    All these keywords.

    JEL classification:

    • L92 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Railroads and Other Surface Transportation
    • O18 - Economic Development, Innovation, Technological Change, and Growth - - Economic Development - - - Urban, Rural, Regional, and Transportation Analysis; Housing; Infrastructure
    • D72 - Microeconomics - - Analysis of Collective Decision-Making - - - Political Processes: Rent-seeking, Lobbying, Elections, Legislatures, and Voting Behavior

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:jouinf:v:6:y:2014:i:2:p:145-165. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: http://www.idfresearch.org .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.