Implementation of Voice Recording Activities in Improving Mandarin Oral Fluency
Author
Abstract
Suggested Citation
DOI: 10.26417/ejis.v9i1.p56-61
Download full text from publisher
References listed on IDEAS
- Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012.
"Geographical variation in project cost performance: the Netherlands versus worldwide,"
Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
- Chantal C. Cantarelli & Bent Flyvbjerg & S{o}ren L. Buhl, 2013. "Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide," Papers 1307.2181, arXiv.org.
- Bent Flyvbjerg & Mette K. Skamris holm & Søren L. Buhl, 2003. "How common and how large are cost overruns in transport infrastructure projects?," Transport Reviews, Taylor & Francis Journals, vol. 23(1), pages 71-88, January.
- Guasch, J. Luis & Orte, Manuel De & Pena, Jorge, 2008. "Investment climate assessment based on demean Olley and Pakes decompositions: methodology and application to Turkey's investment climate survey," UC3M Working papers. Economics we082012, Universidad Carlos III de Madrid. Departamento de EconomÃa.
- Ansar, Atif & Flyvbjerg, Bent & Budzier, Alexander & Lunn, Daniel, 2014.
"Should we build more large dams? The actual costs of hydropower megaproject development,"
Energy Policy, Elsevier, vol. 69(C), pages 43-56.
- Atif Ansar & Bent Flyvbjerg & Alexander Budzier & Daniel Lunn, 2014. "Should we build more large dams? The actual costs of hydropower megaproject development," Papers 1409.0002, arXiv.org.
- Odeck, James, 2004. "Cost overruns in road construction--what are their sizes and determinants?," Transport Policy, Elsevier, vol. 11(1), pages 43-53, January.
- Daniel Kahneman & Amos Tversky, 2013.
"Prospect Theory: An Analysis of Decision Under Risk,"
World Scientific Book Chapters, in: Leonard C MacLean & William T Ziemba (ed.), HANDBOOK OF THE FUNDAMENTALS OF FINANCIAL DECISION MAKING Part I, chapter 6, pages 99-127,
World Scientific Publishing Co. Pte. Ltd..
- Kahneman, Daniel & Tversky, Amos, 1979. "Prospect Theory: An Analysis of Decision under Risk," Econometrica, Econometric Society, vol. 47(2), pages 263-291, March.
- Amos Tversky & Daniel Kahneman, 1979. "Prospect Theory: An Analysis of Decision under Risk," Levine's Working Paper Archive 7656, David K. Levine.
- Bent Flyvbjerg, 2007.
"Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures,"
Environment and Planning B, , vol. 34(4), pages 578-597, August.
- Flyvbjerg, Bent, 2005. "Policy and planning for large infrastructure projects : problems, causes, cures," Policy Research Working Paper Series 3781, The World Bank.
- Bent Flyvbjerg, 2013. "Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures," Papers 1303.7400, arXiv.org.
- Kenny, Charles, 2007. "Infrastructure governance and corruption : where next ?," Policy Research Working Paper Series 4331, The World Bank.
- Bacon, Robert W & Besant-Jones, John E, 1998. "Estimating construction costs and schedules: Experience with power generation projects in developing countries," Energy Policy, Elsevier, vol. 26(4), pages 317-333, March.
- Frédéric Blanc-Brude & Hugh Goldsmith & Timo Välilä, 2009. "A Comparison of Construction Contract Prices for Traditionally Procured Roads and Public–Private Partnerships," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 35(1), pages 19-40, September.
- Andrew Mold, 2012. "Will It All End In Tears? Infrastructure Spending And African Development In Historical Perspective," Journal of International Development, John Wiley & Sons, Ltd., vol. 24(2), pages 237-254, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ana Paula Marques, 2022. "Portraits of Women Founders and Leaders in the North of Portugal: Do Academic Qualifications Matter in the Cultural Patterns of Family Firms?," European Journal of Interdisciplinary Studies Articles, Revistia Research and Publishing, vol. 8, July - De.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dejan Makovšek & Marian Moszoro, 2018.
"Risk pricing inefficiency in public–private partnerships,"
Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
- Makovsek, Dejan & Moszoro, Marian W., 2017. "Risk pricing inefficiency in public-private partnerships," MPRA Paper 101574, University Library of Munich, Germany.
- Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
- Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
- C. Guccio & G. Pignataro & I. Rizzo, 2012.
"Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts,"
Applied Economics, Taylor & Francis Journals, vol. 44(15), pages 1891-1909, May.
- Calogero Guccio & Giacomo Pignataro & Ilde Rizzo, 2011. "Determinants of Adaptation Costs in Procurement: An Empirical Estimation on Italian Public Works Contracts," Post-Print hal-00687731, HAL.
- Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
- Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
- Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
- Makovšek, Dejan, 2014. "Systematic construction risk, cost estimation mechanism and unit price movements," Transport Policy, Elsevier, vol. 35(C), pages 135-145.
- Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012.
"Geographical variation in project cost performance: the Netherlands versus worldwide,"
Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
- Chantal C. Cantarelli & Bent Flyvbjerg & S{o}ren L. Buhl, 2013. "Geographical Variation in Project Cost Performance: The Netherlands versus Worldwide," Papers 1307.2181, arXiv.org.
- Hugo Priemus & Bert van Wee (ed.), 2013. "International Handbook on Mega-Projects," Books, Edward Elgar Publishing, number 14791.
- Chantal C. Cantarelli & Bent Flyvbjerg, 2013. "Mega-projects’ cost performance and lock-in: problems and solutions," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 15, pages 333-355, Edward Elgar Publishing.
- Anuja Shaktawat & Shelly Vadhera, 2021. "Risk management of hydropower projects for sustainable development: a review," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 23(1), pages 45-76, January.
- Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
- Chong, Uven & Hopkins, Omar, 2016. "An international experience on the evolution of road costs during the project life cycle," Transport Policy, Elsevier, vol. 48(C), pages 60-66.
- Petter Osmundsen & Kristin Helen Roll, 2016.
"Rig Rates and Drilling Speed: Reinforcing Effects,"
CESifo Working Paper Series
5895, CESifo.
- Osmundsen, Petter & Roll, Kristin Helen, 2016. "Rig rates and drilling speed: reinforcing effects," UiS Working Papers in Economics and Finance 2016/4, University of Stavanger.
- Awojobi, Omotola & Jenkins, Glenn P., 2016.
"Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 63(C), pages 19-32.
- Omotola Awojobi & Glenn P. Jenkins, 2015. "Managing the Cost Overrun Risks of Hydroelectric Dams: An Application of Reference Class Forecasting Techniques," Development Discussion Papers 2015-06, JDI Executive Programs.
- Jenkins, G. & Olasehinde-Williams, G. & Baurzhan, S., 2022.
"Is there a net economic loss from employing reference class forecasting in the appraisal of hydropower projects?,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 159(C).
- Glenn P. Jenkins & Olasehinde G. Williams & Saule Baurzhan, 2022. "Is there a net economic loss from employing reference class forecasting in the appraisal of hydropower projects?," Development Discussion Papers 2022-02, JDI Executive Programs.
- Ansar, Atif & Flyvbjerg, Bent & Budzier, Alexander & Lunn, Daniel, 2014.
"Should we build more large dams? The actual costs of hydropower megaproject development,"
Energy Policy, Elsevier, vol. 69(C), pages 43-56.
- Atif Ansar & Bent Flyvbjerg & Alexander Budzier & Daniel Lunn, 2014. "Should we build more large dams? The actual costs of hydropower megaproject development," Papers 1409.0002, arXiv.org.
- Love, Peter E.D. & Ahiaga-Dagbui, Dominic D. & Irani, Zahir, 2016. "Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 184-194.
- Catalão, Francisco Pinheiro & Cruz, Carlos Oliveira & Sarmento, Joaquim Miranda, 2019. "The determinants of cost deviations and overruns in transport projects, an endogenous models approach," Transport Policy, Elsevier, vol. 74(C), pages 224-238.
More about this item
Keywords
Mandarin oral fluency; foreign language learning; voice recording;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eur:ejisjr:174. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Revistia Research and Publishing (email available below). General contact details of provider: https://revistia.com/index.php/ejis .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.