Equipment scheduling problem under disruptions in mail processing and distribution centres
Author
Abstract
Suggested Citation
DOI: 10.1057/palgrave.jors.2602581
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jean-François Cordeau & Goran Stojković & François Soumis & Jacques Desrosiers, 2001. "Benders Decomposition for Simultaneous Aircraft Routing and Crew Scheduling," Transportation Science, INFORMS, vol. 35(4), pages 375-388, November.
- Jonathan Bard & David Morton & Yong Wang, 2007. "Workforce planning at USPS mail processing and distribution centers using stochastic optimization," Annals of Operations Research, Springer, vol. 155(1), pages 51-78, November.
- Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
- Oded Berman & Richard C. Larson & Edieal Pinker, 1997. "Scheduling Workforce and Workflow in a High Volume Factory," Management Science, INFORMS, vol. 43(2), pages 158-172, February.
- Ahmad I. Z. Jarrah & Jonathan F. Bard & Anura H. deSilva, 1994. "Solving Large-Scale Tour Scheduling Problems," Management Science, INFORMS, vol. 40(9), pages 1124-1144, September.
- Ahmad I. Z. Jarrah & Jonathan F. Bard & Anura H. deSilva, 1994. "Equipment Selection and Machine Scheduling in General Mail Facilities," Management Science, INFORMS, vol. 40(8), pages 1049-1068, August.
- Herman, Oded & Larson, Richard C., 1993. "Optimal workforce configuration incorporating absenteeism and daily workload variability," Socio-Economic Planning Sciences, Elsevier, vol. 27(2), pages 91-96, June.
- Stephen E. Bechtold & Larry W. Jacobs, 1990. "Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling," Management Science, INFORMS, vol. 36(11), pages 1339-1351, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- G M Campbell, 2011. "A two-stage stochastic program for scheduling and allocating cross-trained workers," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1038-1047, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jonathan F. Bard & Lin Wan, 2008. "Workforce Design with Movement Restrictions Between Workstation Groups," Manufacturing & Service Operations Management, INFORMS, vol. 10(1), pages 24-42, November.
- Jonathan Bard & David Morton & Yong Wang, 2007. "Workforce planning at USPS mail processing and distribution centers using stochastic optimization," Annals of Operations Research, Springer, vol. 155(1), pages 51-78, November.
- L Wan & J F Bard, 2007. "Weekly staff scheduling with workstation group restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1030-1046, August.
- Arpan Rijal & Marco Bijvank & Asvin Goel & René de Koster, 2021. "Workforce Scheduling with Order-Picking Assignments in Distribution Facilities," Transportation Science, INFORMS, vol. 55(3), pages 725-746, May.
- Ferdinand Kiermaier & Markus Frey & Jonathan F. Bard, 2020. "The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers," Journal of Scheduling, Springer, vol. 23(2), pages 177-209, April.
- Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
- Lusby, Richard Martin & Range, Troels Martin & Larsen, Jesper, 2015. "A Benders decomposition-based Matheuristic for the Cardinality Constrained Shift Design Problem," Discussion Papers on Economics 9/2015, University of Southern Denmark, Department of Economics.
- Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
- Lusby, Richard Martin & Range, Troels Martin & Larsen, Jesper, 2016. "A Benders decomposition-based matheuristic for the Cardinality Constrained Shift Design Problem," European Journal of Operational Research, Elsevier, vol. 254(2), pages 385-397.
- Jaime Miranda & Pablo A. Rey & Antoine Sauré & Richard Weber, 2018. "Metro Uses a Simulation-Optimization Approach to Improve Fare-Collection Shift Scheduling," Interfaces, INFORMS, vol. 48(6), pages 529-542, November.
- Karen Puttkammer & Rainer Kleber & Tobias Schulz & Karl Inderfurth, 2011. "Simultane Maschinenbelegungs- und Personaleinsatzplanung in KMUs anhand eines Fallbeispiels aus der Druckereibranche," FEMM Working Papers 110010, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- Jens Brunner & Jonathan Bard & Rainer Kolisch, 2009. "Flexible shift scheduling of physicians," Health Care Management Science, Springer, vol. 12(3), pages 285-305, September.
- Melanie Erhard, 2021. "Flexible staffing of physicians with column generation," Flexible Services and Manufacturing Journal, Springer, vol. 33(1), pages 212-252, March.
- Haase, Knut, 1999. "Retail business staff scheduling under complex labor relations," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 511, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Aykin, Turgut, 2000. "A comparative evaluation of modeling approaches to the labor shift scheduling problem," European Journal of Operational Research, Elsevier, vol. 125(2), pages 381-397, September.
- Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
- Banu Sungur & Cemal Özgüven & Yasemin Kariper, 2017. "Shift scheduling with break windows, ideal break periods, and ideal waiting times," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 203-222, June.
- Richard Charles Larson, 2002. "Public Sector Operations Research: A Personal Journey," Operations Research, INFORMS, vol. 50(1), pages 135-145, February.
- repec:dau:papers:123456789/4010 is not listed on IDEAS
- Dellaert, Nico & Jeunet, Jully & Mincsovics, Gergely, 2011. "Budget allocation for permanent and contingent capacity under stochastic demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 128-138, May.
- Jens O. Brunner & Jonathan F. Bard & Jan M. Köhler, 2013. "Bounded flexibility in days‐on and days‐off scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(8), pages 678-701, December.
More about this item
Keywords
Postal operations; equipment scheduling; workforce scheduling; overtime management; integer programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:60:y:2009:i:5:d:10.1057_palgrave.jors.2602581. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.