Solving Large-Scale Tour Scheduling Problems
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.40.9.1124
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
- Hua Ni & Hernán Abeledo, 2007. "A branch-and-price approach for large-scale employee tour scheduling problems," Annals of Operations Research, Springer, vol. 155(1), pages 167-176, November.
- Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
- Idris Addou & François Soumis, 2007. "Bechtold-Jacobs generalized model for shift scheduling with extraordinary overlap," Annals of Operations Research, Springer, vol. 155(1), pages 177-205, November.
- Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
- Haase, Knut, 1999. "Retail business staff scheduling under complex labor relations," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 511, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
- Eveborn, Patrik & Flisberg, Patrik & Ronnqvist, Mikael, 2006. "Laps Care--an operational system for staff planning of home care," European Journal of Operational Research, Elsevier, vol. 171(3), pages 962-976, June.
- Jonathan F. Bard & Lin Wan, 2008. "Workforce Design with Movement Restrictions Between Workstation Groups," Manufacturing & Service Operations Management, INFORMS, vol. 10(1), pages 24-42, November.
- Jonathan Bard & David Morton & Yong Wang, 2007. "Workforce planning at USPS mail processing and distribution centers using stochastic optimization," Annals of Operations Research, Springer, vol. 155(1), pages 51-78, November.
- Michael J. Brusco & Larry W. Jacobs, 1998. "Personnel Tour Scheduling When Starting-Time Restrictions Are Present," Management Science, INFORMS, vol. 44(4), pages 534-547, April.
- Lagodimos, A. G. & Leopoulos, V., 2000. "Greedy heuristic algorithms for manpower shift planning," International Journal of Production Economics, Elsevier, vol. 68(1), pages 95-106, October.
- Aykin, Turgut, 2000. "A comparative evaluation of modeling approaches to the labor shift scheduling problem," European Journal of Operational Research, Elsevier, vol. 125(2), pages 381-397, September.
- X Zhang & A Chakravarthy & Q Gu, 2009. "Equipment scheduling problem under disruptions in mail processing and distribution centres," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(5), pages 598-610, May.
- Karen Puttkammer & Rainer Kleber & Tobias Schulz & Karl Inderfurth, 2011. "Simultane Maschinenbelegungs- und Personaleinsatzplanung in KMUs anhand eines Fallbeispiels aus der Druckereibranche," FEMM Working Papers 110010, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- L Wan & J F Bard, 2007. "Weekly staff scheduling with workstation group restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1030-1046, August.
- Easton, F. F. & Rossin, D. F., 1997. "Overtime schedules for full-time service workers," Omega, Elsevier, vol. 25(3), pages 285-299, June.
- Cai, X. & Li, K. N., 2000. "A genetic algorithm for scheduling staff of mixed skills under multi-criteria," European Journal of Operational Research, Elsevier, vol. 125(2), pages 359-369, September.
- Easton, Fred F. & Mansour, Nashat, 1999. "A distributed genetic algorithm for deterministic and stochastic labor scheduling problems," European Journal of Operational Research, Elsevier, vol. 118(3), pages 505-523, November.
- María I. Restrepo & Bernard Gendron & Louis-Martin Rousseau, 2016. "Branch-and-Price for Personalized Multiactivity Tour Scheduling," INFORMS Journal on Computing, INFORMS, vol. 28(2), pages 334-350, May.
- Hur, Daesik & Mabert, Vincent A. & Bretthauer, K.M.Kurt M., 2004. "Real-time schedule adjustment decisions: a case study," Omega, Elsevier, vol. 32(5), pages 333-344, October.
More about this item
Keywords
shift scheduling; days-off scheduling; tour scheduling; integer programming; branch and bound; U.S. postal service;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:40:y:1994:i:9:p:1124-1144. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.